REPORT
Revision History
Page 1 of 2
Introduction
This report refers to non-conformances during the internal inspection on 06 July 2022 for item Nr. 5 on
the schedule: ‘Installation of Cables and Wires’ (TN, FD, SA, LT, EM & PA SystemS) in Kitchen areas
at level 01 in Building 2 (2.30-2.38/2.J-2.L)
Observation:
01. Cable installation was not carried out as per the approved documents.
Power and lighting cables feeding from the SDB.2.B.2.3.1 were routed to an incorrect
distribution board (SDB.2.B.2.1).
HKN shall take measures to correct the installation as per the approved documents. And the same
inspection shall be re-raised for Engineer to witness the rectification upon completion of the works.
Page 2 of 2