1 Project : WATERFRONT INTERGRATED RESORT


Reference : GTEC - IRE – 0195

REPORT

OBSERVATION REPORT FOR NON-CONFORMING CABLES AND WIRES


INSTALLATION
IN LINEN STORAGE AT LEVEL 01
BUILDING – 02

HKN Witness inspection Schedule item Nr 9 Dated 15th September 2022

Revision History

00 15th SEPTEMBER 2022 SHH/AEA FOR REFERENCE PDA GBE


Revision Date Prepared by Reference Checked by Approved by

Page 1 of 3
Introduction:
This report refers to non-conformances observed while witnessing the internal inspection on 15th September 2022 for item Nr 9 on the
schedule ‘Installation of Cables and Wires” at Linen storage (Grid location 2.9-2.12/2.K-3.A) at Level 01 in Building 02.

Level Cable Identification tag Cable Type as per the approved drawing Installed cable type at site Cable schedule reference

01 MDB.2.2/ES.2.2 1R×1×4C 6sqmm Cu/XLPE/LSZH + 1R×1×5C 6sqmm Cu/XLPE/LSZH Refer Figure 03 Extracted from HKN-SPD-EL-EF-
1Rx1x1C 6sqmm Cu/LSZH/E 2020003

Table 1: Comparison of site installed cable type against the approved (As per the drawing) cable type

Figure 1: Extracted from HKN-SPD-EL-EF-2020003

Page 2 of 3
Figure 2: Installed 5C 6sqmm Cable at site

Remarks and Recommendation:

HKN shall replace above non-approved cables with approved type and the inspection shall be re-raised for the Engineer to confirm the
installation.

Page 3 of 3