Waterfront) Master Plan For Elevator as of July 16th, 2022

※The below schedule is subject to change with unavoidable shipping company condition or unexpected jobsite circumstances or foreign labor entry situation .

● Work Scope:1). Fire door replacement 2), Car Panel installation & High speed operation 3).Temporary door replacement , 4) CRT connection operation

● HKN Requested completion period: by July 29, 2022

● Estimated work star date: May 3rd for Fire door replacement and May 28 for Car panel installation Item of Elevator Installation Progress

Sunday 1 Material shifing & Preparation 7 Slow speed 13 Shaft Wiring & Pit Wiring 19 Internal Inspection

Fire Door Supply Schedule 2 Templete & Inspection 8 Pit work & Governor installation 14 Travelling Cable installation 20 Mechanical and T/C Adjustments

Car Panel Supply Schedule 3 Guide Rail Installation 9 Car frame, Platform & CWT frame installation.
15 CabinAssembly 21 Final QC & Rectification

Entrance Installation 4 Guide Rail Inspection 10 Platform inspection 16 Cabin Wiring & Roller guides installation
22 3rd Party Insp.

Entrance QC and Rectification 5 M/C installation & wiring 11 Roping 17 Hoistway Lighting 23 Finalizing & Hnading over

Cabin Installation and High Speed Operation 6 M/C inspection 12 Entrance installation 18 High Speed 24 Cabin Flooring

QC and Rectification

- -Target
- completion date
July August Septeber October November
No. Item Description
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Manufacturing
1st shipping

Fire 2nd shipping


1 Door Customs clear
Supply
1st shipment arrival
2ndshipment arrival
Custom clearence, Sorting and Shifting
Manufacturing
1st shipping
2nd shipping
Car 3rd Shipping
2 Panel
Supply Customs clear
1st shipment arrival
2nd shipment arrival
3rd Shipment Arrival
PL2.3(L09) (4/2)
PL2.4(L10) (4/2)
PL2.6(L11) (4/7)
PL2.7(L12) (4/7)
PL2.8(L13) (4/7)
PL2.9(L14) (4/7)
PL2.10(L15) (4/7)
PL2.11(L16) (4/7)
PL2.12(L17) (4/7)
PL2.13(L18) (4/7)
PL2.14(L19) (4/7)
PL2.15(L20) (4/7)

Entranc PL2.16(L21) (4/7)


e and PL2.17(L22) (4/7)
Car
PL2.18(L23) (4/7)
Pannel
Installati PL2.19(L24) (4/7)
3
on and PL2.20(L25) (4/7)
High
Speed PL2.21(L26) (4/7)
Operatio PL2.24(L27) (4/7)
n
PL2.25(L28) (4/7)
PL2.28(L29) (4/7)
PL2.32(L30) (4/7)
PL2.33(L31) (4/7)
PL2.34(L32) (4/7)
PL2.35(L33) (4/7)
PL2.36(L34) (4/7)
SL2.1(L35) (4/2)
SL2.2(L36) (4/2)
SL2.3(L37)
SL2.7(L38) (4/2)
SL2.8(L39) (4/2)
SL2.9(L40)
FSL2.1(L01)
FSL2.2(L02)
Tempor
FSL2.3(L03)
ary
Door FSL2.4(L04)
4
Panel FSL2.5(L05)
Replace
ment FSL2.6(L06)
FSL2.7(L07)
FSL2.8(L08)
5 CRT All units
PL1.1(L01) Completed up 6 7 7 7 7 7 8 8 8 9 9 9 9 11 11 11 11 11 12 12 12 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 18 19 19 19 20 20 20 21 21 22 22 22 23 24
PL1.2(L02) Completed up 6 7 7 7 7 7 8 8 8 9 9 9 9 11 11 11 11 11 12 12 12 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 18 19 19 19 20 20 20 21 21 22 22 22 23 24
PL1.3(L03 Completed up 6 7 7 7 7 7 8 8 8 9 9 9 9 11 11 11 11 11 12 12 12 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 18 19 19 19 20 20 20 21 21 22 22 22 23 24
PL1.4(L04) Completed up 6 7 7 7 7 7 8 8 8 9 9 9 9 11 11 11 11 11 12 12 12 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 18 19 19 19 20 20 20 21 21 22 22 22 23 24
PL1.5(L05) Completed up 7 8 8 8 9 9 9 9 11 11 11 11 11 12 12 12 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 15 15 15 15 15 15 15 16 16 16 16 16 17 17 17 17 17 17 18 18 18 18 18 18 18 19 19 19 20 20 20 21 21 22 22 22 23 24
6 BD 1
PL1.6(L06) Completed up 11 12 12 12 13 13 13 14 14 14 14 15 15 15 16 16 17 17 17 18 18 18 18 19 19 19 19 20 20 21 21 21 22 22 22 23 23 23 24
PL1.7(L07) Completed up 11 12 12 12 13 13 13 14 14 14 14 15 15 15 16 16 17 17 17 18 18 18 18 19 19 19 19 20 20 21 21 21 22 22 22 23 23 23 24
PL1.8(L08) Completed up 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 12 13 13 13 14 14 15 15 15 16 16 17 17 17 18 18 18 18 19 19 20 20 21 21 22 22 24 23
SL1.1(L09) Completed up 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 12 13 13 13 14 14 15 15 15 16 16 17 17 17 18 18 18 18 19 19 20 20 21 21 22 22 24 23
SL1.2(L10) Completed up 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 12 13 13 13 14 14 15 15 15 16 16 17 17 17 18 18 18 18 19 19 20 20 21 21 22 22 24 23
SL2.1(L35) Completed up 18 19 19 20 20 21 21 21 22 22 23 23
SL2.2(L36) Completed up 18 19 19 20 20 21 21 21 22 22 23 23
SL2.3(L37) Completed up 18 19 19 19 20 20 20 20 21 21 21 22 22 23 23 23
7 BD 2
SL2.7(L38) Completed up 18 19 19 20 20 21 22 23
SL2.8(L39) Completed up 17 18 18 18 18 19 19 20 20 20 21 21 21 22 22 23
SL2.9(L40) Completed up 18 19 19 20 20 21 22 23
FSL3.1(L01) Completed up 18 19 19 19 20 20 20 21 21 21 22 22 22
FSL3.2(L02) Completed up 18 19 19 19 20 20 20 21 21 21 22 22 22
FSL3.3(L03 Completed up 18 19 19 19 20 20 20 21 21 21 22 22 22
FSL3.4(L04) Completed up 18 19 19 19 20 20 20 21 21 21 22 22 22
FSL3.5(L05) Completed up 18 19 19 19 20 20 20 21 21 21 22 22 22
8 BD 3
FSL3.6(L06) Completed up 18 19 19 19 20 20 20 21 21 21 22 22 22
Waterfront) Master Plan For Elevator as of July 16th, 2022
※The below schedule is subject to change with unavoidable shipping company condition or unexpected jobsite circumstances or foreign labor entry situation .

● Work Scope:1). Fire door replacement 2), Car Panel installation & High speed operation 3).Temporary door replacement , 4) CRT connection operation

● HKN Requested completion period: by July 29, 2022

● Estimated work star date: May 3rd for Fire door replacement and May 28 for Car panel installation Item of Elevator Installation Progress

Sunday 1 Material shifing & Preparation 7 Slow speed 13 Shaft Wiring & Pit Wiring 19 Internal Inspection

Fire Door Supply Schedule 2 Templete & Inspection 8 Pit work & Governor installation 14 Travelling Cable installation 20 Mechanical and T/C Adjustments

Car Panel Supply Schedule 3 Guide Rail Installation 9 Car frame, Platform & CWT frame installation.
15 CabinAssembly 21 Final QC & Rectification

Entrance Installation 4 Guide Rail Inspection 10 Platform inspection 16 Cabin Wiring & Roller guides installation
22 3rd Party Insp.

Entrance QC and Rectification 5 M/C installation & wiring 11 Roping 17 Hoistway Lighting 23 Finalizing & Hnading over

Cabin Installation and High Speed Operation 6 M/C inspection 12 Entrance installation 18 High Speed 24 Cabin Flooring

QC and Rectification

- -Target
- completion date
July August Septeber October November
No.
8 Item3
BD Description
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

PL3.1(L07) Completed up 11 12 12 12 12 12 12 13 13 13 14 14 15 15 15 15 16 16 16 17 17 17 18 18 18 18 19 19 19 20 20 21 21 21 22 22 22 23 23 24 24
PL3.2(L08) Completed up 11 12 12 12 12 12 12 13 13 13 14 14 15 15 15 15 16 16 16 17 17 17 18 18 18 18 19 19 19 20 20 21 21 21 22 22 22 23 23 24 24

Fire PL3.3(L09) Completed up 8 9 9 9 10 10 12 12 12 12 12 12 13 13 13 14 14 15 15 15 15 16 16 16 17 17 17 18 18 18 18 19 19 19 20 21 21 21 22 22 22 23 23 24 24


1 Door PL3.4(L10) Completed up 8 9 9 9 10 10 12 12 12 12 12 12 13 13 13 14 14 15 15 15 15 16 16 16 17 17 17 18 18 18 18 19 19 19 20 21 21 21 22 22 22 23 23 24 24
Supply

Waterfront) Master Plan For Escalator As of July 16th, 2022


※The below schedule is subject to change with unavoidable shipping company condition or unexpected jobsite circumstances.

Sunday Item of Escalator Installation Progress


1 Unloading & Shifting material 7 Wiring & Safety Circuit installation 13 3rd PartyInspection
2 Truss Joining & Bearing Plate installation
8 Glass,Hand Rail & Skirt installation 14 Cladding and inspection
3 Hoisting & Placing 9 Step, Comb,Hand Rail Adjustment
4 Leveling 10 Testing and Commissioning
5 Rail, Step &Chain installation 11 Cleaning & Lubricating

6 Outer & Newel Deck installation 12 InternalInspection


July August September
No. Item Description
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ES1.3A 14 14 14 14 14 14 14 14 14 14
ES1.3B 14 14 14 14 14 14 14 14 14 14
1 BD 1
ES1.4A Completed
ES1.4B Completed
ES2.1A 14 14 14 14 14 14 14
ES2.1B 14 14 14 14 14 14 14
ES2.2 8 8 8 8 9 9 9 10 10 10 10 11 11 11 11 14 14 14 14 14 14
ES2.3A Completed
ES2.3B Completed
2 BD 2 ES2.4A 8 8 8 8 8 9 9 9 10 10 10 10 10 11 11 11 11 12 12 12 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
ES2.4B 8 8 8 8 8 9 9 9 10 10 10 10 10 11 11 11 11 12 12 12 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
ES2.6A 14 14 14 14 14 14 14 14 14 14 14
ES2.6B 14 14 14 14 14 14 14 14 14 14 14
ES2.7A Completed
ES2.7B Completed
ES3.1A Completed 6 7 7 7 8 8 8 8 9 9 10 10 10 11 11 11 12 12 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
ES3.1B Completed 6 7 7 7 8 8 8 8 9 9 10 10 10 11 11 11 12 12 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
ES3.2A Completed 6 7 7 7 8 8 8 8 9 9 10 10 10 11 11 11 12 12 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
3 BD 3
ES3.2B Completed 6 7 7 7 8 8 8 8 9 9 10 10 10 11 11 11 12 12 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
ES3.3A Completed 6 7 7 7 8 8 8 8 9 9 10 10 10 11 11 11 12 12 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
ES3.3B Completed 6 7 7 7 8 8 8 8 9 9 10 10 10 11 11 11 12 12 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14