※The below schedule is subject to change with unavoidable shipping company condition or unexpected jobsite circumstances or foreign labor entry situation .
● Work Scope:1). Fire door replacement 2), Car Panel installation & High speed operation 3).Temporary door replacement , 4) CRT connection operation
● Estimated work star date: May 3rd for Fire door replacement and May 28 for Car panel installation Item of Elevator Installation Progress
Sunday 1 Material shifing & Preparation 7 Slow speed 13 Shaft Wiring & Pit Wiring 19 Internal Inspection
Fire Door Supply Schedule 2 Templete & Inspection 8 Pit work & Governor installation 14 Travelling Cable installation 20 Mechanical and T/C Adjustments
Car Panel Supply Schedule 3 Guide Rail Installation 9 Car frame, Platform & CWT frame installation.
15 CabinAssembly 21 Final QC & Rectification
Entrance Installation 4 Guide Rail Inspection 10 Platform inspection 16 Cabin Wiring & Roller guides installation
22 3rd Party Insp.
Entrance QC and Rectification 5 M/C installation & wiring 11 Roping 17 Hoistway Lighting 23 Finalizing & Hnading over
Cabin Installation and High Speed Operation 6 M/C inspection 12 Entrance installation 18 High Speed 24 Cabin Flooring
QC and Rectification
- -Target
- completion date
July August Septeber October November
No. Item Description
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Manufacturing
1st shipping
● Work Scope:1). Fire door replacement 2), Car Panel installation & High speed operation 3).Temporary door replacement , 4) CRT connection operation
● Estimated work star date: May 3rd for Fire door replacement and May 28 for Car panel installation Item of Elevator Installation Progress
Sunday 1 Material shifing & Preparation 7 Slow speed 13 Shaft Wiring & Pit Wiring 19 Internal Inspection
Fire Door Supply Schedule 2 Templete & Inspection 8 Pit work & Governor installation 14 Travelling Cable installation 20 Mechanical and T/C Adjustments
Car Panel Supply Schedule 3 Guide Rail Installation 9 Car frame, Platform & CWT frame installation.
15 CabinAssembly 21 Final QC & Rectification
Entrance Installation 4 Guide Rail Inspection 10 Platform inspection 16 Cabin Wiring & Roller guides installation
22 3rd Party Insp.
Entrance QC and Rectification 5 M/C installation & wiring 11 Roping 17 Hoistway Lighting 23 Finalizing & Hnading over
Cabin Installation and High Speed Operation 6 M/C inspection 12 Entrance installation 18 High Speed 24 Cabin Flooring
QC and Rectification
- -Target
- completion date
July August Septeber October November
No.
8 Item3
BD Description
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
PL3.1(L07) Completed up 11 12 12 12 12 12 12 13 13 13 14 14 15 15 15 15 16 16 16 17 17 17 18 18 18 18 19 19 19 20 20 21 21 21 22 22 22 23 23 24 24
PL3.2(L08) Completed up 11 12 12 12 12 12 12 13 13 13 14 14 15 15 15 15 16 16 16 17 17 17 18 18 18 18 19 19 19 20 20 21 21 21 22 22 22 23 23 24 24