Replacement of wear and tear parts of construction use elevator_FSL6.

No Item Name Picture

1 Landing Door Shoe

2 Hanger plate

3
Guide shoes(Car & Counter
weight)

4 Landing Door Sill

5 Car Door Sill


6 Hanger Roller

7 Cop button (Door Close )

8 Door Belt

9 Cop Control Switch

10 Safety edge

11 Pit Safety Switch


12 Pit Parts corotion (Need to Paint)

13 Landing Door Hanger


Qty (Option2) Qty (Option1)

20 120

1 1

8 8

3 15

1 1
10 120

1 34

1 1

3 3

1 1

3 3
1 1
Civil related work(HKN) Remakrs

20 nos door shoes should be replaced. We


recommend to replace all Landing Door Shoes.

Grouting Should be done after 3 nos door sill should be replace. We recommend
placment of Landing door sill to replace all Landing Door sill.
We recommend to replace all Hanger rollers of
landing doors.
Spare Parts Delevary Time to compleat
perioud the work

6weeks 2 Days

6 Weeks 1 Day

1 Day

6 Weeks 5 Days

6 Weeks 1/2 Day


6 Weeks 2 Days

6 Weeks 2 Hours

0 4 Hours

0 1 Hour

0 1/2 Days

0 2 Hours
2 Days

6 Weeks 2 Hours