This report refers to non-conformances observed during a recent site visit to the Zone D1 lift lobby area
at level 1 and BOH area at Level 3 in Building 2.
Observations
01. Cables are installed without completing cable tray accessory (add-on tee) installation. Therefore
cables and trays could be deformed due to lack of supports and result in cable insulation failure.
Page 2 of 5
02. It was observed that ceiling framework installation has been started in lift lobby area without raising
the inspection and getting the Engineers’ approval for cables and wires installation in LT, PA, FD,
OE, TN & SA,
Figure 3: Level 1 lift lobby area near loading bay (location grid: 2.33-2.34/2.J-2.K)
Page 3 of 5
03. It was observed that mechanical pipes have been installed above the distribution boards in BOH
area at level 3 without any protection means to protect the DBs in the event of any leakage in the
mechanical pipes.
Page 4 of 5
Remarks and Recommendation:
Remedial actions shall be taken by the contractor to install the missing accessories in cable trays
and raise the cable and wires inspections prior to close the ceiling/installation of ceiling framework.
Furthermore, all distribution boards shall be protected against water leakages which likely to
happen in mechanical pipes.
Page 5 of 5