Reaction Sheet
JOB NO.
ENQ-1031
Rev. No.
R0
Location
LUCKNOW-UP
Date
Client
PACCFED
Filled By
Arjit Srivastava
Description
MAIN FRAME
Checked by
(+Ve)SIGN CONVENTION
Z
H
M
V
GRID
GRID
LOAD TYPE
MOMENTS (M)
(KN-M)
1 EQ +X
2 EQ -X
3 DEAD LOAD
4 LIVE LOAD
5 COLLATERAL LOAD
6 WIND ANGLE ZERO, INT PRE, FROM RIGHT
7 WIND ANGLE ZERO, INT SUC, FROM RIGHT
8 WIND ANGLE 90, INT PRE, FROM RIGHT
9 WIND ANGLE 90, INT SUC, FROM RIGHT
10 WIND ANGLE ZERO, INT PRE, FROM LEFT
11 WIND ANGLE ZERO, INT SUC, FROM LEFT
12 WIND ANGLE 90, INT PRE, FROM LEFT
13 WIND ANGLE 90, INT PRE, FROM LEFT
1.88
-1.88
-1.36
-4.12
0.00
-13.10
-26.76
-6.89
-20.57
57.32
43.57
-6.89
-20.57
-1.77
1.77
8.96
17.92
0.00
-7.34
-22.62
-26.22
-41.49
-35.77
-51.02
-26.22
-41.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.42
-7.42
-2.96
-8.93
0.00
-51.89
-66.92
-4.01
-19.11
118.61
103.38
-4.01
-19.11
1 EQ +X
2 EQ -X
3 DEAD LOAD
4 LIVE LOAD
5 COLLATERAL LOAD
6 WIND ANGLE ZERO, INT PRE, FROM RIGHT
7 WIND ANGLE ZERO, INT SUC, FROM RIGHT
8 WIND ANGLE 90, INT PRE, FROM RIGHT
9 WIND ANGLE 90, INT SUC, FROM RIGHT
10 WIND ANGLE ZERO, INT PRE, FROM LEFT
11 WIND ANGLE ZERO, INT SUC, FROM LEFT
12 WIND ANGLE 90, INT PRE, FROM LEFT
13 WIND ANGLE 90, INT PRE, FROM LEFT
1.88
-1.88
1.36
4.12
0.00
-57.32
-43.57
6.89
20.57
13.10
26.76
6.89
20.57
1.77
-1.77
8.96
17.92
0.00
-35.77
-51.02
-26.22
-41.49
-7.34
-22.62
-26.22
-41.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.42
-7.42
2.96
8.93
0.00
-118.61
-103.38
4.01
19.11
51.89
66.92
4.01
19.11
Imp. Notes:
1) Foundation To be Designed for the most critical load combination.
2) The sign conventions for the reaction should be considered as shown in the diagram.
3) All loads are service loads.