Federal Register / Vol. 73, No.

57 / Monday, March 24, 2008 / Notices 15507

comment date for the particular competing application or motion to site under the ‘‘e-Filing’’ link. The
application. A competing license intervene must also be served upon each Commission strongly encourages
application must conform with 18 CFR representative of the Applicant electronic filings. Please include the
4.30 and 4.36. specified in the particular application. project number (P–12995–000) on any
o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state, comments or motions filed.
must specify the exact name, business and local agencies are invited to file The Commission’s Rules of Practice
address, and telephone number of the comments on the described application. and Procedure require all intervenors
prospective applicant, and must include A copy of the application may be filing documents with the Commission
an unequivocal statement of intent to obtained by agencies directly from the to serve a copy of that document on
submit, if such an application may be Applicant. If an agency does not file each person in the official service list
filed, either a preliminary permit comments within the time specified for for the project. Further, if an intervenor
application or a development filing comments, it will be presumed to files comments or documents with the
application (specify which type of have no comments. One copy of an Commission relating to the merits of an
application). A notice of intent must be agency’s comments must also be sent to issue that may affect the responsibilities
served on the applicant(s) named in this the Applicant’s representatives. of a particular resource agency, they
public notice. must also serve a copy of the document
p. Proposed Scope of Studies Under Kimberly D. Bose,
on that resource agency.
Permit—A preliminary permit, if issued, Secretary.
k. Description of Project: The
does not authorize construction. The [FR Doc. E8–5844 Filed 3–21–08; 8:45 am]
proposed project using the U.S. Army
term of the proposed preliminary permit BILLING CODE 6717–01–P
Corps of Engineers’ Tom Bevill Lock
would be 36 months. The work and Dam and operated in a run-of-river
proposed under the preliminary permit mode would consist of: (1) A new
would include economic analysis, DEPARTMENT OF ENERGY
powerhouse and switchyard; (2) two
preparation of preliminary engineering
Federal Energy Regulatory turbine/generator units with a combined
plans, and a study of environmental
Commission installed capacity of 25 megawatts; (3) a
impacts. Based on the results of these
new 1-mile-long aboveground 25-
studies, the Applicant would decide [Project No. 12995–000] kilovolt transmission line extending
whether to proceed with the preparation
from the switchyard to an
of a development application to Tom Bevill Hydro, LLC; Notice of interconnection point with the utility
construct and operate the project. Application Accepted for Filing and
q. Comments, Protests, or Motions to distribution system owned by Black
Soliciting Motions To Intervene, Warrior Electric Membership
Intervene—Anyone may submit Protests, and Comments
comments, a protest, or a motion to Corporation; and (4) appurtenant
intervene in accordance with the March 17, 2008. facilities. The proposed Tom Bevill
requirements of Rules of Practice and Take notice that the following Lock and Dam Project would have an
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed average annual generation of 75
In determining the appropriate action to with the Commission and is available gigawatt-hours.
take, the Commission will consider all for public inspection: l. This filing is available for review at
protests or other comments filed, but a. Type of Application: Preliminary the Commission in the Public Reference
only those who file a motion to Permit. Room or may be viewed on the
intervene in accordance with the b. Project No.: 12995–000. Commission’s Web site at http://
Commission’s Rules may become a c. Date filed: September 10, 2007. www.ferc.gov using the ‘‘eLibrary’’ link.
party to the proceeding. Any comments, d. Applicant: Tom Bevill Hydro, LLC. Enter the docket number excluding the
protests, or motions to intervene must e. Name of Project: Tom Bevill Lock last three digits in the docket number
be received on or before the specified and Dam Hydroelectric Project. field to access the document. For
comment date for the particular f. Location: Tombigbee River in assistance, call toll-free 1–866–208–
application. Pickens County, Alabama. It would use 3676 or e-mail
r. Filing and Service of Responsive the U.S. Army Corps of Engineers’ Tom FERCONLINESUPPORT@FERC.GOV.
Documents—Any filings must bear in Bevill Lock and Dam. For TTY, call (202) 502–8659. A copy is
all capital letters the title g. Filed Pursuant to: Federal Power also available for inspection and
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)–825(r). reproduction at the address in item h
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L. above.
‘‘COMPETING APPLICATION’’, Smith, COO, Symbiotics, LLC, P.O. Box m. Competing Preliminary Permit—
‘‘PROTEST’’, and ‘‘MOTION TO 535, Rigby, ID 83442, (208) 745–0834. Anyone desiring to file a competing
INTERVENE’’, as applicable, and the i. FERC Contact: Robert Bell, (202) application for preliminary permit for a
Project Number of the particular 502–4126. proposed project must submit the
application to which the filing refers. j. Deadline for filing comments, competing application itself, or a notice
Any of the above-named documents protests, and motions to intervene: 60 of intent to file such an application, to
must be filed by providing the original days from the issuance date of this the Commission on or before the
and the number of copies provided by notice. specified comment date for the
the Commission’s regulations to: The All documents (original and eight particular application (see 18 CFR 4.36).
Secretary, Federal Energy Regulatory copies) should be filed with: Secretary, Submission of a timely notice of intent
Commission, 888 First Street, NE., Federal Energy Regulatory Commission, allows an interested person to file the
mstockstill on PROD1PC66 with NOTICES

Washington, DC 20426. An additional 888 First Street, NE., Washington, DC competing preliminary permit
copy must be sent to Director, Division 20426. Comments, protests, and application no later than 30 days after
of Hydropower Administration and interventions may be filed electronically the specified comment date for the
Compliance, Federal Energy Regulatory via the Internet in lieu of paper; see 18 particular application. A competing
Commission, at the above-mentioned CFR 385.2001(a)(1)(iii) and the preliminary permit application must
address. A copy of any notice of intent, instructions on the Commission’s web conform with 18 CFR 4.30 and 4.36.

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1
15508 Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices

n. Competing Development Project Number of the particular i. FERC Contact: Robert Bell, (202)
Application—Any qualified application to which the filing refers. 502–4126.
development applicant desiring to file a Any of the above-named documents j. Deadline for filing comments,
competing development application must be filed by providing the original protests, and motions to intervene: 60
must submit to the Commission, on or and the number of copies provided by days from the issuance date of this
before a specified comment date for the the Commission’s regulations to: The notice.
particular application, either a Secretary, Federal Energy Regulatory All documents (original and eight
competing development application or a Commission, 888 First Street, NE., copies) should be filed with: Secretary,
notice of intent to file such an Washington, DC 20426. An additional Federal Energy Regulatory Commission,
application. Submission of a timely copy must be sent to Director, Division 888 First Street, NE., Washington, DC
notice of intent to file a development of Hydropower Administration and 20426. Comments, protests, and
application allows an interested person Compliance, Federal Energy Regulatory interventions may be filed electronically
to file the competing application no Commission, at the above-mentioned via the Internet in lieu of paper; see 18
later than 120 days after the specified address. A copy of any notice of intent, CFR 385.2001(a)(1)(iii) and the
comment date for the particular competing application or motion to instructions on the Commission’s Web
application. A competing license intervene must also be served upon each site under the ‘‘e-Filing’’ link. The
application must conform with 18 CFR representative of the Applicant Commission strongly encourages
4.30 and 4.36. specified in the particular application. electronic filings. Please include the
o. Notice of Intent—A notice of intent s. Agency Comments—Federal, State, project number (P–12967–000) on any
must specify the exact name, business and local agencies are invited to file comments or motions filed.
address, and telephone number of the comments on the described application. The Commission’s Rules of Practice
prospective applicant, and must include A copy of the application may be and Procedure require all intervenors
an unequivocal statement of intent to obtained by agencies directly from the filing documents with the Commission
submit, if such an application may be Applicant. If an agency does not file to serve a copy of that document on
filed, either a preliminary permit comments within the time specified for each person in the official service list
application or a development filing comments, it will be presumed to for the project. Further, if an intervenor
application (specify which type of have no comments. One copy of an files comments or documents with the
application). A notice of intent must be Commission relating to the merits of an
agency’s comments must also be sent to
served on the applicant(s) named in this issue that may affect the responsibilities
the Applicant’s representatives.
public notice. of a particular resource agency, they
p. Proposed Scope of Studies Under Kimberly D. Bose, must also serve a copy of the document
Permit—A preliminary permit, if issued, Secretary. on that resource agency.
does not authorize construction. The [FR Doc. E8–5842 Filed 3–21–08; 8:45 am] k. Description of Project: The
term of the proposed preliminary permit BILLING CODE 6717–01–P
proposed project using the U.S. Army
would be 36 months. The work Corps of Engineers’ Tuttle Creek Dam
proposed under the preliminary permit and operated in a run-of-river mode
would include economic analysis, DEPARTMENT OF ENERGY would consist of: (1) A new powerhouse
preparation of preliminary engineering and switchyard; (2) a 400-foot-long, 108-
plans, and a study of environmental Federal Energy Regulatory inch-diameter steel penstock; (3) one
impacts. Based on the results of these Commission turbine/generator unit with an installed
studies, the Applicant would decide capacity of 3 megawatts; (4) a new 2-
[Project No. 12967–000]
whether to proceed with the preparation mile-long above ground 12.5-kilovolt
of a development application to Tuttle Creek Hydro, LLC; Notice of transmission line extending from the
construct and operate the project. Application Accepted for Filing and switchyard to an interconnection point
q. Comments, Protests, or Motions to Soliciting Motions To Intervene, with the local utility’s distribution
Intervene—Anyone may submit Protests, and Comments system; and (5) appurtenant facilities.
comments, a protest, or a motion to The proposed Tuttle Creek Dam Project
intervene in accordance with the March 17, 2008. would have an average annual
requirements of Rules of Practice and Take notice that the following generation of 18 gigawatt-hours.
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed l. This filing is available for review at
In determining the appropriate action to with the Commission and is available the Commission in the Public Reference
take, the Commission will consider all for public inspection: Room or may be viewed on the
protests or other comments filed, but a. Type of Application: Preliminary Commission’s Web site at http://
only those who file a motion to Permit. www.ferc.gov using the ‘‘eLibrary’’ link.
intervene in accordance with the b. Project No.: 12967–000. Enter the docket number excluding the
Commission’s Rules may become a c. Date filed: August 30, 2007. last three digits in the docket number
party to the proceeding. Any comments, d. Applicant: Tuttle Creek Hydro, field to access the document. For
protests, or motions to intervene must LLC. assistance, call toll-free 1–866–208–
be received on or before the specified e. Name of Project: Tuttle Creek Dam 3676 or e-mail
comment date for the particular Hydroelectric Project. FERCONLINESUPPORT@FERC.GOV.
application. f. Location: Big Blue River in Riley For TTY, call (202) 502–8659. A copy is
r. Filing and Service of Responsive County, Kansas. It would use the U.S. also available for inspection and
Documents—Any filings must bear in Army Corps of Engineers’ Tuttle Creek reproduction at the address in item h
mstockstill on PROD1PC66 with NOTICES

all capital letters the title Dam. above.


‘‘COMMENTS’’, ‘‘NOTICE OF INTENT g. Filed Pursuant to: Federal Power m. Competing Preliminary Permit—
TO FILE COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r). Anyone desiring to file a competing
‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L. application for preliminary permit for a
‘‘PROTEST’’, and ‘‘MOTION TO Smith, COO, Symbiotics, LLC, P.O. Box proposed project must submit the