Form- 1
: Distribution Network Improvement Works- Undergrounding of Critical Circuits in Zone-1B (ABP-2013)Job # 4 Reference PO
: SFO LLC
Start Date
Contract BOQ
Reference
No 7
No 7
Any other
Identification
Item Code
if available
: DS/PO/14/0014
YARD NUMBER :
UOM
Qty
Al Ghubira Street
Nos
16
Al Ghubira Street
11 Kv Lightning Arrestor
Nos
(Reusable Items)
Remarks
It is certified that all the Reusable Replaced Original Assets agaiest this specific Project have been herewith returned to stores and no more Items are to be returned by the referred Contractor.
Signature of the Contractor :__________________________Signature of the HES Engineer :___________________________Signature of the Project Manager:_______________________________
Form- 4
Form- 4
: Distribution Network Improvement Works- Undergrounding of Critical Circuits in Zone-1B (ABP-2013) Job # 4 Reference PO
: SFO LLC
Start Date
1
2
3
4
5
6
End Date
Contract BOQ
Reference
Any other
Identification
No 7
Al Ghubira Street
9 No Conductor
No 7
Item Code
if available
: DS/PO/14/0014
YARD NUMBER :
Description of the
Asset
(Disposable Items)
UOM
Qty
Remarks
150mm ACSR
Conductor
Mtrs
1747
(413)+(2103)+ (843)+
(2443)
Al Ghubira Street
11KV Intermidiate
cross Arm (old)
Nos
13
No 7
Al Ghubira Street
11 KV Tie Braket
L & R (old)
Nos
26
No 7
Al Ghubira Street
Nos
No 7
Al Ghubira Street
C' Channel
Nos
No 7
Al Ghubira Street
3c 240 mm UG
Cable
Mtrs
It is certified that aii the Disposable DPC Scrap" against this specific Project have been herewith returned to stores and no more Items are to be returned by the referred Contractor.
Signature of the Contractor :__________________________Signature of the HES Engineer :___________________________Signature of the Project Manager:______________________________
742
252
630
123
1747
Form- 4
Form- 4
: Distribution Network Improvement Works- Undergrounding of Critical Circuits in Zone-1B (ABP-2013) Job # 4 Reference PO
: SFO LLC
Start Date
End Date
Contract BOQ
Reference
No 7
Al Ghubira Street
No 7
Al Ghubira Street
No 7
Al Ghubira Street
No 7
5
6
Any other
Identification
YARD NUMBER :
Item Code
Description of the Asset
if available
: DS/PO/14/0014
UOM
Qty
Nos
30
Disc insulator
Nos
24
Nos
18
Al Ghubira Street
11 Kv ABS
No
No 8
Al Ghubira Street
Pilot Plate
Nos
No 9
Al Ghubira Street
Nos
No 9
Al Ghubira Street
Mtrs
30
(Disposable Items)
Remarks
It is certified that aii the Disposable DPC Scrap" against this specific Project have been herewith returned to stores and no more Items are to be returned by the referred
Contractor.
Signature of the Contractor :__________________________Signature of the HES Engineer :___________________________Signature of the Project Manager:____________________________