0 ELECTRIC LOCOMOTIVE:

2.1 Electric Loco Sheds

There are two electric loco sheds in NCR-

2.1.1 Electric Loco Shed, Kanpur: The Electric Loco Shed, Kanpur was
established in 1965 with the electrification of Mughalsarai-Kanpur section. The
shed started functioning with a meager holding of 11 imported WAM-1 type
locomotives for Passenger services. Present holding of the shed is 169
locomotives (40-WAP-4, 126-WAG-7 & 3-WAM-4).

2.1.2 Electric Loco Shed, Jhansi: Electric Loco Shed, Jhansi designed for a
holding of 100 locos was established in 1987 with an initial holding of 17 locos.
Present holding of the shed is 176 locomotives i.e. 72 WAG-7 ( 23 BHEL & 49
CLW built) and 104 WAG-5 (74 BHEL & 30 CLW built) locomotives.

2.1 Rolling Stock Operations:

The salient features on the three divisions of NCR are as follows:

Sr.
Description ALD JHS AGC Total
No.
Running staff 2498 2062 1170 5730
1 (Sanctioned
Strength)
2 Trip Sheds 04 (ALD, CNB, 01 (JHS,) 02 (HNZM,
7
TDL, MGS) NDLS)
3 Lobbies 05 (MGS, ALD, 01 (JHS) 03 (AGC, MTJ,
9
CNB-2, TDL) NDLS)
4 Running Rooms 06 (MGS, ALD, 01 (JHS) 05 (Agra-2, IDH,
12
CNB-3, TDL) NDLS, MTJ)
2.0 Traction Distribution:
2.1 INFRASTRUCTURE: The summarized position of all three divisions is as below:
Sr. Description ALD JHS AGC TOTAL
No.
1. Electrified RKM 781.02 371.5 364 1526.52
% of RKM (BG) 76.7 30.9 55.42 53.0
2. Electrified TKM 2175 946 578 3687
3. No. of OHE Depots 15 08 05 28
4. No. of PSI Depots 13 04 04 21
5. Transmission Lines (Km)
220 KV 25 KM 25 KM
132 KV 527 KM 12 KM 34 KM 573 KM
66 KV 49 KM 49 KM
6. Traction Sub - stations - -
220 KV 02 - - 02
132 KV/ 66 KV 19 05 04 28
25 KV 05 - - 05
7. Remote control center 02 01 01 04
8. Central Repair shop 01 - - 01
9. Tower Wagons 17 08 06 31
North Central Railway

Electrical Department

3.0 Electrical Coaching Services (TL-AC):


3.1 Infrastructure: The salient features for all three divisions are as below:
Sr
. Description ALD JHS AGC Total
No.
1 No. of primary Trains 20 33 05 58
Primary maint. Rakes 30 39 09 78
Secondary maint. Rakes 14 0 0 14
TL Primary Coaches - BG+MG 411 391 120 922
NG - 80 - 80
AC Primary coaches 83 34 02 119
No of coaches with FL 411 391 115 917
fittings(BG)
2 Coaching Maintenance Depot 03 (ALD, 02 (JHS, 03 08
CNB, GWL) (AGC,AF,MTJ)
TDL)

4.0 Electrical General Services:


4.1 Infrastructure: Details of assets in ALD, JHS & AGC divisions are as per list
below:
S. ALD JHS AGC Total NCR
Description
N.
1 Av. Energy Consumed per month 5.886 3.131 1.972 11.640
(in Million units)
2 Electrified Stations 106 121 56 283
3 DG Sets 84 33 12 129
4 Water Coolers 98 72 50 220
5 Pumps 158 131 47 336
6 Sub-stations 51 34 32 117
7 Staff Quarters (Electrified) 15996 6322 4192 26510

You might also like