METHOD STATEMENT
ARABTEC-WCT JV
Document No: MS-0044
Revision No: 00
Date: 27/01/2008
PROPOSED DEVELOPMENT AND CONSTRUCTION OF THE NAD AL
SHEBA RACECOURSE ON PARCEL ID 600-6888, NAD AL SHEBA,
DUBAI, UNITED ARAB EMIRATES
METHOD STATEMENT NO.: MS-0044
REV: 0
ORIGINATOR: Norafizah Mohamad
DISCIPLINE: ARCHITECTURAL
Title:
SCREEDING WORK
REVIEWER / APPROVER
REV
DATE
STATUS
REVISION DETAILS
27/01/08
FA
First submission for approval
JV
*EXTERNAL
Status Code:
D : Draft
FI : For Information
FC : For Construction
P : Preliminary
FA : For Approval
* External Authorization (Client),
where required
Distribution:
Table of Contents
Page 1 of 6
METHOD STATEMENT
1.
2.
3.
4.
5.
6.
Introduction
Scope of work
Location
Reference used
Responsible person/Contact no.
Resources
6.1 Manpower
6.2 Plants & Equipments
6.3 Materials
6.4 PPE List
7. Description of works
8. QA/QC Aspects
9. Safety & Health Aspects
10.Attachment
11.Site Safety Engineers Approval
1.0
INTRODUCTION
Page 2 of 6
ARABTEC-WCT JV
Document No: MS-0044
Revision No: 00
Date: 27/01/2008
METHOD STATEMENT
ARABTEC-WCT JV
Document No: MS-0044
Revision No: 00
Date: 27/01/2008
This method statement will describe on how to construct the screeding work including
the description of works, materials and machinery and equipment.
2.0
SCOPE OF WORK
Screeds are guided with a straightedge to bring a concrete surface to a desired elevation
or with a template to produce a desired curved shape.
3.0
LOCATION
To be apply on top of slab.
4.0
REFERENCE USED
Project Specification: Architectural Specification, Section 03500 : Concrete Screeds.
5.0
RESPONSIBLE PERSON/ CONTACT NO.
Project Manager, Construction Manager and Site Engineer of ATC-WCT JV
6.0
RESOURCES
6.1
6.2
6.3
Manpower
Site Engineer
Skill worker
Plants and Equipments
Brush or roller
Hand float or skip float or power float
Materials
Concrete grade 25N
Bonding agent
Curing compound
Page 3 of 6
METHOD STATEMENT
6.4
ARABTEC-WCT JV
Document No: MS-0044
Revision No: 00
Date: 27/01/2008
PPE List
1.
Safety Helmets
2.
Safety Shoes
3.
Hand Gloves
4.
Goggles
5.
Masks
6.
Coverall
7.0
DESCRIPTION OF WORKS
7.1
Site preparation:
Bases are sufficiently flat so as to permit specified levels and flatness of finished
surfaces.
7.2
Bases are cleaned and free from plaster, dirt, dust and oil.
Set pegging to floor and wall.
Application:
Apply with a single coat of bonding agent by brush or roller, taking care to work
the mixed material with the substrate. Ensure a uniform coating is achieved and
make sure no ponding occurs when applied horizontally. When used as an antichloride barrier two coats will be required.
Pour the screeding concrete onto the floor according to the shop drawing.
Using guiding lathes/battens of predetermined thickness, apply the non-flowable
screed to the base and compact by stamping.
Apply one coat at 4.5 5.5 m 2 / litre by low pressure knapsack spray or brush or
woolen roller. Apply as soon as possible after free water evaporates from
horizontal surfaces or vertical forms are stripped.
Page 4 of 6
METHOD STATEMENT
ARABTEC-WCT JV
Document No: MS-0044
Revision No: 00
Date: 27/01/2008
Falls in wet areas like kitchen and toilet should be in the correct directions
towards floor traps or discharge pints.
8.0
Screed need to be even.
No mortar stains or paint drips.
Surfaces should not be unduly rough or patchy.
QA/QC ASPECTS
The purpose of the quality control is to provide a guideline for a proper operation
framework such that the following targets will be attained: 1. To achieve consistently high quality standards of workmanship in all aspects of the
work.
2. All quality matters shall follows as per ISO standard and Project Quality Plan to
ensure the quality in construction.
9.0
SAFETY & HEALTH ASPECTS
Refer to the Risk Assessment
10.0
ATTACHMENT
10.1
Inspection and Test Plan
10.2
Risk Assessment
Page 5 of 6
METHOD STATEMENT
11.0
ARABTEC-WCT JV
Document No: MS-0044
Revision No: 00
Date: 27/01/2008
SITE SAFETY ENGINEERS APPROVAL
Approved
Approved Subjected to compliance with the following notes/comment
Not Approved - Reasons
Signed: ____________________
Dated: ________________
Page 6 of 6