(AN EXAMINATION OF FAILURE OF RIGID
PAVEMENTS AND REMEDY APPROACHES IN THE SURANAREE UNIVERSITY
OF TECHNOLOGY) : .
5
1 1 2
3 2 3
:
2:
Epoxy Stitching Epoxy Injection
3: Epoxy
Stitching Epoxy Injection
2555
Students signature
Advisors signature
.
.
1
1.1
1.2
1.3
1.4
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
1
1
2
2
2
3
3
3
3
5
9
10
12
17
17
17
18
19
19
3.1.5
3.1.6
3.2
4
4.1
4.2
4.3
4.4
4.5 .
5
19
20
20
21
21
28
30
38
41
48
50
51
56
61
65
7
8
8
13
32
39
39
40
40
41
2.1
2.2
2.3
2.4
2.5 30-60 . 1.25 - 2.50
2.6 (Sub Sealing)
2.7
2.8 ..2552
3.1
3.2
3.3
3.4
3.5
4.1 1 1
4.2 2
4.3 3
4.4 2
4.5 3
4.6
4.7
4.8
4.9
4.10
4.11
4.12 (Polyurethane System)
4.13
4.14
3
4
10
10
11
11
12
16
18
18
19
19
20
23
24
25
26
27
28
28
29
29
30
30
33
34
34
35
36
38
38
42
43
44
44
45
46
47
47
1.1
(Rigid pavement)
1.
2.
3.
19 (..
2536 2552)
(
)
1.2
1.
2.
3.
1.3
5
1. 1
2. 2
3. 3
4. 2
5. 3
1.4
1.
2.
3.
2.1
.. 2533 2 , 4 4
(Concrete Pavement) (Asphaltic
Concrete Pavement)
()
2.2
Profile (Soil-Aggregate)
( 2.1)
0.10 .
2.1
(:)
2.3
2.3.1
4
- (Concrete)
- (Sub base)
- (Sub grade)
-
2.3.2
30-40
10-15
(Crack) (Joint) 2.2
2.2
2.3.3
.
( 2)
2.3.4
2.4 (: . 2549
(Road Maintenance Manual) 1-70.
(.)
.
. 2
2.4.1 ( :
()
1. (Blowup or Buckling)
2. (Corner Breaks)
3. (Divided Slab)
5. (Faulting)
7. (Linear Cracking)
8. (Patching)
9. (Polished Aggregate)
10. Pumping
11. (Scaling)
Cement mortar
Cement Paste
13. (Spalling)
2.4.2 (Maintenance)
1. (Repair of Joint Sealing)
( 2.1)
1)
2)
3)
2.1 (Repair of Joint Sealing)
Joint Sealing
/
1.
1
2.
1
3.
1
1.
1
2.
1
1 200-300
2. (Sealing Crack)
( 2.2)
1)
2) Epoxy Resin
2.2 (Sealing Crack)
Joint Sealing
/
1.
1
2.
1
1.
1
2. Epoxy Resin 1
1 300-400
3. (Concrete Patching)
( 2.3)
1)
2) .
3)
4)
5) .
2.3 (Concrete Patching)
(, , , )
/
1
1.
1
2.
1
2.3 ()
(, , , )
3.
1
4.
1
5.
1
1.
3
2.
3
3.
1
1 20-25
(Crack)
(Joint)
Site
Pumping Action (Subbase)
( 2.3)
10
2.3
( : 2542 37-44.)
2.6 (Sub Sealing) :
2549 64-69.
Pumping Action
Slurry Cement Mortar ( + )
1. ( 2.4)
2.4
11
( 2.5)
12
2.7
(: (Road Maintenance Manual)
2.7 (Polyurethane System)
: Uretek Company Profile. 2554 []. :http://www.uretekworldwide.com
1. 1
2 210 2
2. 2
1 180 2
3. 3
1 60
2
4. 2
1 280 2
5. 3
2 160.20 2
890.20 2
2.7.1
1.
Bench Mark 5
2. 1.5
0.75
13
3.
4.
(Expanding Rubber Packer)
5.
1) 650
(4.48 45.70
44.82 Bar)
2.4
2.4
()
60 100
100 150
1-3 1-3
2-4 2-4
2)
1.
2.
14
3. 20
4.
3)
( 5.2.2 5.2.3
6.
Non-shrink Cement Grout
50
7.
2.7.2
1. (Coring Machine)
5-20 (0.2-0.79 )
2. (Injection Machine)
1)
2) (Pump)
800 (5.52
15
3.
4.
5.
6.
7.
8.
9.
300
(Air Compressor)
800
(116.03 8.16 8.00
Bar.)
(Generator)
800
0.01
1)
2) Staff
16
3)
4)
2.7.3
( 2.8)
2.8 ..2552
17
Epoxy
3
3.1
5
1 1
3.1.1 (Elevation)
19 (.. 2552)
(.. 2536) 3.1
18
.. 2552
.. 2552 2555
3.1
3.1.2
3.2 3.3
3.2
19
3.3
3.1.3
3.1.4
3.1.3
.. 2555
3.1.5
Dial Gauge 3.4
5 25
3.4
20
3.1.6 (Conclusions)
3.5
21
5 1
1 2 3 2 3
5 4 2536
1/2536 19
( .. 2552)
4.1
1 1
6 1,020
2 2 2
1 6 420 2 2
3 2
6 428 2 2
2 1 2
6 385.40 2 2 3
6
435 2 2 4.1 4.5
.. 2552 (..
2536) ( 10 )
1 1 40 100, 360 380 870 890,
22
112
WITHYAWITHI 1 ROAD
SIKKHAWITHI 1 ROAD
104
Start
100
96
End of construction
End
Arter (2009)
B.M. 100.000 m
92
0
100
200
300
400
500
600
700
Distance (m)
102
800
900
1000
1200
WITHYAWITHI 1 ROAD
103
Elevation (m)
101
Elevation (m)
1100
104
WITHYAWITHI 1 ROAD
Start
100
Distance, 0 - 100 m
End of construction
After (2009)
99
20
40
102
101
B.M. 100.000 m
B.M. 100.000 m
98
60
80
100
100
100
120
Distance (m)
180
200
WITHYAWITHI 1 ROAD
106
107
Elevation (m)
104
106
105
103
B.M. 100.000 m
102
200
160
108
WITHYAWITHI 1 ROAD
105
140
Distance (m)
107
Elevation (m)
Elevation (m)
108
220
240
260
Distance (m)
280
300
104
300
325
B.M. 100.000 m
350
Distance (m)
375
400
1300
23
104
107
SIKKHAWITHI 1 ROAD
WITHYAWITHI 1 ROAD
103
Elevation (m)
Elevation (m)
106
105
104
103
400
425
102
101
B.M. 100.000 m
450
475
100
500
500
520
B.M. 100.000 m
540
560
580
600
Distance (m)
Distance (m)
102
99
SIKKHAWITHI 1 ROAD
SIKKHAWITHI 1 ROAD
Remeady, SKR 1.1
98
Elevation (m)
Elevation (m)
101
100
99
98
600
620
97
96
B.M. 100.000 m
640
660
680
95
700
700
720
Distance (m)
780
800
SIKKHAWITHI 1 ROAD
93
Elevation (m)
95
Elevation (m)
760
94
SIKKHAWITHI 1 ROAD
94
92
800
740
Distance (m)
96
93
B.M. 100.000 m
820
840
92
91
B.M. 100.000 m
860
880
900
90
900
925
Distance (m)
4.1 1 1
B.M. 100.000 m
950
Distance (m)
975
1000
24
112
SIKKHAWITHI 2 ROAD
End of construction
After (2009)
End
Remeady, SKT 2
104
100
Start
B.M. 100.000 m
96
0
50
100
150
200
250
300
Distance (m)
103
350
400
450
500
107
SIKKHAWITHI 2 ROAD
SIKKHAWITHI 2 ROAD
106
Distance, 0 - 100 m
End of construction
After (2009)
Elevation (m)
Elevation (m)
102
101
Start
105
104
103
100
102
B.M. 100.000 m
B.M. 100.000 m
99
0
20
40
60
80
101
100
100
120
Distance (m)
140
200
SIKKHAWITHI 2 ROAD
109
Elevation (m)
107
106
104
200
180
110
SIKKHAWITHI 2 ROAD
105
160
Distance (m)
108
Elevation (m)
Elevation (m)
108
220
240
260
Remeady, SKT 2
107
B.M. 100.000 m
280
300
End
108
106
300
325
Distance (m)
4.2 2
350
B.M. 100.000 m
375
Distance (m)
400
425
25
104
End of construction
103
After (2009)
SIKKHAWITHI 3 ROAD
102
End
101
100
Start
99
B.M. 100.000 m
98
97
0
50
100
150
200
250
300
Distance (m)
102
350
450
500
SIKKHAWITHI 3 ROAD
103
Elevation (m)
101
Elevation (m)
400
104
SIKKHAWITHI 3 ROAD
Start
100
Distance, 0 - 100 m
End of construction
After (2009)
99
20
40
102
101
B.M. 100.000 m
B.M. 100.000 m
98
60
80
100
100
100
120
Distance (m)
140
200
SIKKHAWITHI 3 ROAD
102
Elevation (m)
103
102
100
200
180
103
SIKKHAWITHI 3 ROAD
101
160
Distance (m)
104
Elevation (m)
Elevation (m)
105
220
240
100
B.M. 100.000 m
260
280
300
End
101
99
300
320
Distance (m)
340
B.M. 100.000 m
360
Distance (m)
4.3 3
380
400
26
101
WITHYAWITHI 2 ROAD
Start
Remeady, WTR 2
99
End
98
End of construction
After (2009)
B.M. 100.000 m
97
0
50
100
150
200
250
300
Distance (m)
101
350
400
450
500
101
WITHYAWITHI 2 ROAD
WITHYAWITHI 2 ROAD
Start
100
Elevation (m)
Elevation (m)
100
99
Distance, 0 - 100 m
End of construction
After (2009)
98
20
40
99
98
B.M. 100.000 m
97
60
80
97
100
100
120
Distance (m)
140
160
200
WITHYAWITHI 2 ROAD
100
Elevation (m)
99
98
99
End
98
B.M. 100.000 m
97
200
180
101
WITHYAWITHI 2 ROAD
100
B.M. 100.000 m
Distance (m)
101
Elevation (m)
Elevation (m)
100
220
240
260
280
300
B.M. 100.000 m
97
300
325
Distance (m)
350
375
Distance (m)
4.4 2
400
425
27
101
Start
WITHYAWITHI 3 ROAD
100
98
97
Remeady, WTR 3
96
End
End of construction
95
After (2009)
B.M. 100.000 m
94
0
50
100
150
200
250
300
Distance (m)
101
350
400
450
500
99
WITHYAWITHI 3 ROAD
WITHYAWITHI 3 ROAD
Start
98
Elevation (m)
Elevation (m)
100
99
Distance, 0 - 100 m
End of construction
After (2009)
98
20
40
97
96
B.M. 100.000 m
97
60
80
95
100
100
120
Distance (m)
140
180
200
WITHYAWITHI 3 ROAD
96
Elevation (m)
96
95
93
200
160
97
WITHYAWITHI 3 ROAD
94
B.M. 100.000 m
Distance (m)
97
Elevation (m)
Elevation (m)
99
220
240
Remeady, WTR 3
End
95
94
B.M. 100.000 m
260
280
300
93
300
320
Distance (m)
340
B.M. 100.000 m
360
Distance (m)
4.5 3
380
400
28
4.2
4. 6 (Joint
seal damage of transverse joints)
4.6
4.7 (Longitudinal crack)
4.7
29
4.8
4.9
4.10 (Transverse and diagonal crack)
4.11
30
4.10
4.11
4.3
( 4.1) ( 4.2)
1:
(Concrete Patching) (Base)
31
2: (Polyurethane) 3:
(Sub Sealing) 1
2 3
(/
) Epoxy Stitching
2 3
2
3
1 : (Concrete Patching)
2 : (Polyurethane)
1.
1.1
Pumping Action
1.2
0.6-1.2
32
2.
3.
(Expanding Rubber Packer)
4. ( 4.12)
650
(4.48 45.70
44.82 Bar)
4.1
1
4.1
()
60-90
2-3 2-3
90-120
3-4 2-3
: Uretek Company Profile. 2554 []. :http://www.uretekworldwide.com
33
20
1:
2:
3:
34
approach slab
leave slab
4.13
4.14
(Polyurethane System)
(Allowable stress) (Modulus
of Elasticity) 100 0.77
15.4 ASTM D
1621 4.15 55 x 55
26 (Ductile)
()
35
12 20
30 342 20
3: (Sub Sealing)
1.
Pumping action
2.
36
3.
4.
5.
37
8.
1-2
3-6
Cement Mortar Fast Setting Cement
9. Cement Mortar 8 2
1.
2. Epoxy Adhesive
3. 5 . 15-20 .
20-30 .
4. 2.5 . 15. 2 . Epoxy
Adhesive ( Stitching)
5. Injector 20 - 30 .
6. Epoxy Adhesive Epoxy Adhesive
9.
0.03 . Epoxy
38
39
4.2 1 1
Ulithian
-+
- .
Stitching & Epoxy Injection
- Stitching
- Epoxy Injection
Sub Sealing
-
- (Cement Mortar)
(Thermoplastic)
Factor 1.3347
..
1
1,010
700
20,000
350
25,000
1,060,500
.
.
119
224
650
450
350
300
119,000
168,000
..
..
1
600
300
480
280
20,000
280
10
20,000
196,000
87,000
1,675,500.00
560,789.85
2,236,289.85
4.3 2 1
Ulithian
- +
- .
Stitching & Epoxy Injection
- Stitching
- Epoxy Injection
Sub Sealing
-
- (Cement Mortar)
(Thermoplastic)
Factor 1.3347
..
1
230
700
20,000
350
25,000
241,500
.
.
42
126
650
450
350
300
42,000
94,500
..
..
1
200
150
480
280
20,000
280
10
20,000
152,000
43,500
618,500.00
207,011.95
825,511.95
40
4.4 3
Ulithian
- -+
- .
Stitching & Epoxy Injection
- Stitching
- Epoxy Injection
Sub Sealing
-
- (Cement Mortar)
(Thermoplastic)
Factor 1.3347
..
1
470
.
.
..
..
700
20,000
350
25,000
493,500
182
231
650
450
350
300
182,000
135,000
1
310
320
480
280
20,000
280
10
20,000
235,600
92,800
1,183,900.00
396,261.33
1,580,151.33
..
..
1
300
300
450
5,000
300
150
5,000
90,000
180,000
..
1
360
700
20,000
350
20,000
378,000
.
.
56
160
650
450
350
300
56,000
120,000
..
1
200
480
20,000
280
20,000
152,000
4.5 2 1, 2
(Concrete Patching)
-
-
-
Ulithian
-
- .
Stitching & Epoxy Injection
- Stitching
- Epoxy Injection
Sub Sealing
-
- (Cement Mortar)
41
4.5 ()
(Thermoplastic)
Factor 1.3347
..
300
280
10
87,000
1,108,000.00
370,847.60
1,478,847.60
4.6 3 1-6
(Concrete Patching)
-
-
-
Ulithian
-
-
Stitching & Epoxy Injection
- Stitching
- Epoxy Injection
(Thermoplastic)
Factor 1.3347
..
..
1
300
300
450
5,000
300
150
5,000
90,000
180,000
..
1
470
700
20,000
350
20,000
493,500
.
.
..
152
181
300
650
450
280
350
300
10
152,000
135,750
87,000
1,653,250.00
389,339.77
2,042,589.77
: 2
Stitching & Epoxy Injection
4.5 . (Polyurethane)
2
42
(pilot test) ( 4.19)
2 4.1 4.5 27 .. 2552
122/2552 4.20 4.23 2
3 (..2555) (..2536)
19 (..2552) 2
3
4.19
..2552
43
98.20
SIKKHAWITHI 1 ROAD
Elevation (m)
98.00
97.80
97.60
97.40
97.20
97.00
708
710
712
B.M. 100.000 m
714
716
718
720
722
724
726
Distance (m)
92.20
SIKKHAWITHI 1 ROAD
Elevation (m)
92.15
92.10
Distance, 920 - 950 m
End of construction
After (2009)
After remeady
92.05
92.00
915
920
925
B.M. 100.000 m
930
935
940
945
Distance (m)
950
955
44
107.70
SIKKHAWITHI 2 ROAD
Elevation (m)
107.65
107.60
107.55
107.50
B.M. 100.000 m
107.45
320
325
330
335
340
345
350
355
360
365
Distance (m)
4.21 2 (SKR2)
98.40
WITHYAWITHI 2 ROAD
Elevation (m)
98.35
98.30
98.25
98.20
98.15
98.10
225
230
235
240
B.M. 100.000 m
245
250
255
260
265
Distance (m)
4.22 2 (WTR2)
270
275
280
45
95.20
WITHYAWITHI 3 ROAD
Elevation (m)
95.00
94.80
Distance, 325 - 375 m
End of construction
After (2009)
After remeady
94.60
94.40
320
325
330
335
340
B.M. 100.000 m
345
350
355
360
365
370
375
380
Distance (m)
4.23 3 (WTR3)
4.23
5
(dial gauge)
2
4.25 4.26
1 12
38 (
)
1 (Remeady SKR 1.1, Remeady SKR 1.2
, Remeady WTR 2) 2 4,580
..2553-2555 2
2
46
4.24
47
Distance (m)
0
100
200
300
400
500
600
700
800
1000
10
Compression (mm)
900
20
30
40
50
SIKKHAWITHI 1 ROAD
WITHYAWITHI 1 ROAD
60
4.25
Distance (m)
0
50
100
150
200
250
300
Compression (mm)
Remeady, WTR 2
10
20
30
40
4.26
350
400
48
27 .. 2533
( 22 )
5 1
1 2 3 2 3
(Joint seal damage of transverse joints) (Longitudinal
crack) (Lane or shoulder drop-off)
(Spalling of transverse and
longitudinal joint/crack) (Transverse and diagonal
crack)
: (Concrete
Patching) 2: (Polyurethane)
Epoxy Stitching Epoxy Injection
3: (Sub Sealing) Epoxy
Stitching Epoxy Injection
.. 2555
2
300 3 300
367,042.50 367,042.50
1 1
1,010 2 230 3 470
2 360 3 470
49
1,831,875.75 537,884.10
1,124,141.85 766,117.80 1,185,547.27
1 1 600
2 200 3 310 2 200
404,414.10
287,627.85 438,315.48 345,687.30
.. 2552 890 Epoxy
263 Epoxy Stitching 177
3
3
50
. 2536
1/2536 42536
. 2552
122/2552 272552
. 2533
. . 115 .
Uretek Company Profile. 2555
. 20 .
Uretek Company Profile. 2554 Approach slab
[]. :http://www.uretekworldwide.com
.2552
3 (
) 3202 () .6+150 .6+250 (
). 22 .
. 2549 (Road Maintenance Manual)
. 105-125.
. 2549
.6
51
52
1. (Compression Machine)
Compression Machine
Proving Ring
3. 55 55 26 3
4.1 5%
53
1. 80 480
4.1
54
2. 26
40
mm
26 mm.
3. 2 55 x 55
4.1 5%
55
4.
(N) (mm.) 0.10
5. Maximum Acceptable
Compressive Stre Modulus of Elasticity Linear Elastic
56
57
1.
23.80 cm
12.40 cm.
11.20 cm.
7.50 cm.
2. 342
6.50 cm
7.20 cm
11.00 cm 10.30 cm.
3.50 cm
58
3. 15 2
4. 20
23.40 cm.
11.80 cm.
5. 30
1. 30
2. 5
59
3.
60
0.02 cm.
4. 20
5.
61
62
1.
23.80 cm
12.40 cm.
11.20 cm.
7.50 cm.
2.
2.1 342
5/16 1 4
2.2 Tetron 5/16
2.3 15 2
4.00 cm
63
1. 30
2. 5
3.
64
4. 20
Tetron
5. Tetron
65
10 2511
(.) .. 2529
(.)
.. 2530
.. 2544 24
.. 2530 .. 2533
.
.. 2536