DATE
ITEM
LOCATION
1
:
:
:
:
KJB
25-Nov-13
Tunnel
Top slab - Longitudinal/Horizontal
FORCES
Factored moment = M u
108,045,000.00
Factored Shear = V u
0.00
Factored Axial = N u
0.00
=
=
=
=
1,000.00
500.00
70.00
430.00
mm
mm
mm
mm
14.60
MPa
0.85
400.00
MPa
400.00
MPa
diameter of reinforcement
19.00
mm
0.00188
f'c 30 MPa
1 0 .85
1 0 .85 0 .007143 f c' 30 f'c 30 MPa
0 . 8
0 .8 f
2
y
'
N-mm
1 . 7 f c bd
0 .8 f
1 .7 f
'
0.00350
0.00251
max 0.75 b
0.01187
1,079.7
mm2
283.5
mm2
No of Bar Required
No of Bar required
Required Spacing
=
=
=
3.8
4
250.0
bar
bar
mm
Existing Reinforcement
New Reinforcement as Proposed by Designer
This Assessment
Note : Exisiting Reinforcement not Adequate
In the design note it is stated that the existing reinforcement is D19-150
max
max 0 . 75 b
Required Steel Area (Tension) As
Area of