0% found this document useful (0 votes)
96 views1 page

Testing Charges for Electrical Equipment

This document outlines testing, pre-commissioning, and transformer repair charges for various items: 1. It lists 17 items ranging from testing charges for current transformers, potential transformers, meters of various types, onsite testing of RMUs and LBS units, cable testing, and fault location services. 2. It provides the rates in Indian Rupees for minor and major repair of transformers of varying capacities from 25kVA to 500kVA. 3. It also gives the additional costs in Rupees for converting CSP type transformers into conventional type for capacities of 25kVA, 63kVA, and 100kVA.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views1 page

Testing Charges for Electrical Equipment

This document outlines testing, pre-commissioning, and transformer repair charges for various items: 1. It lists 17 items ranging from testing charges for current transformers, potential transformers, meters of various types, onsite testing of RMUs and LBS units, cable testing, and fault location services. 2. It provides the rates in Indian Rupees for minor and major repair of transformers of varying capacities from 25kVA to 500kVA. 3. It also gives the additional costs in Rupees for converting CSP type transformers into conventional type for capacities of 25kVA, 63kVA, and 100kVA.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Testing, Pre Commissioning & Transformer Repair Charges

SL No
1
2
3
4
5
6
7
8
9
10
11
12

13

14

15

Description
Testing Charges
LT Current Transformer Upto 200/5 Amps
Rs. 200/CT
LT Current Transformer Above 200/5 Amps
Rs. 350/CT
11kV Current Transformer
Rs. 600/CT
11kV Potential Transformer
Rs. 400/PT
Bidirectional Single Phase Meter
Rs. 200/Meter
Uni-directional 3 phase ETV Meter
Rs. 1000/Meter
Bidirectional 3 Phase ETV Meter
Rs. 1800/Meter
ABT Feature 3 Phase ETV Meter
Rs. 2400/Meter
Rs. 100/Meter
Unidirectional Single Phase Meter
Rs. 600/Meter
Unidirectional 3 Phase Meters
Rs. 4080/Unit
Onsite testing RMU
Rs. 4080/Unit
Onsite testing LBS
Onsite Cable Testing
a. HT UG Cable
1. Less than 250 Mtrs
Only Megger Test
2. More than 250 Mtrs
Rs. 20,000/b. LT UG Cable
Only Megger Test
Ref
No:
BESCOM/CGM(T)/BC-31/F-2097/200910/Cys-152 dtd 09.12.2009
Fault Location for HT UG Cables beyond the metering Rs. 15,000/- per fault within BESCOM
point at Consumers request in BESCOM and request Jurisdiction
through ESCOMs for consumers in other ESCOM In addition to above Incidental charges like
jurisdiction.
POL+Rent on vehicle and TA & DA as applicable
Ref No: BESCOM/CGM(T)/BC-31/F-2097/2009-10/Cys- for consumers of other ESCOMs
151 dtd 09.12.2009
Transformer Repair Charges (MINOR):
Capacity

Up to 25kVA

Rate in Rs.
4,200/-

ii

Above 25kVA upto63kVA

4,800/-

iii

Above 63kVA upto 100kVA

6,000/-

iv

Above 100kVA upto 250kVA

12,000/-

Above 250kVA upto 500kVA

12,000/-

16

Transformer Repair Charges (MAJOR):

25kVA

Capacity

Rate in Rs.
12,552/-

ii

63kVA

17,024/-

iii

100kVA

20,748/-

17

Conversion of CSP type transformers into Convential Type


Refer OM No. CGM(OP)/DGM(OP-1)/AGM([Link])/BC-11/F-1351/13-14/Cys-50 Dtd 25.06.2013
Capacity

ii

Rate in Rs.

25kVA & 63kVA


Material Portion in Rs.

700/-

Labour Charges in Rs.

200/-

Total Additional Cost in Rs.

900/-

100kVA
Material Portion in Rs.

800/-

Labour Charges in Rs.

200/-

Total Additional Cost in Rs.

1000/-