Professional Documents
Culture Documents
NURHADI
Sign On Date
21 December 2012
Vessel
This Period
Report
1st
1
7
2nd
3rd
4th
10
Department
Academy
NAUTICAL
TECHNICAL
BP2IP SURABAYA
KBA
Manning Agency :
Supervised by
quarte
r
5
6
12
11
NAUTICAL
1. C/O and
PM
2.C/O and
3/O
3.C/O and
2/O
TECHNICAL
1. 2/E and
Oiler1
2.2/E and 4/E
3.2/E and 3/E
4.C/E and 2/E
To:
Head of Sea Training Department
In
BP2IP surabaya
Dear Sir
This is my second letter during sea project on board, my condition is good and also have with all crews on
board.
With all respect, I want to give you information about my sea project monthy report.
This month my vessel have two survey sceduled. It is from oil major ( cevron) inspections and P & I inspections.
The fuction of inspections is to ascertain ship what it is standard or unstandard to load cargo ( oil & gas). They
are have a hight standard and General condition of the ship must be prepared by all crews. This is part of
checked by oil major:
1. Class and statutory certicates
2. Shipboard management ( Section to be completed taken in to consideration time under present management )
3. Crew
4. Safe working
5. Hygienic standard and watch keeping
6. Fire safety appliances
7. Life saving apliances
8. Pollution control
9. Bridge, navigation and communication
10. Hull and deck
11. Ballast tanks and void space
12. Machinery spaces
I think enough for my monthly report this month. Thanks for your kind attention.
Acknowledge by Master
sincerely yours
Nurhadi