Risk Assessment

Job Method Statement


Job
:
water pump house
Location
:
Type of Work Permit
Contractor
:
Date
S. No.
1.

Installation of Lightning Strip on the Shade of Fire


Fire water pump house
:
Hot Work
Afcons
:
05.05.16
Equipment
to be used

JOB DESCRIPTION
GI Strip of size 25x6 sqmm to be laid on the periphery of
roof of the FWPH as per approved drawing

2.

PTW shall be taken before commencement of this job

3.

Scaffolding erection upto the FWPH roof shall be erected

4.

Measurement of strip laying area shall be taken

5.

Lift the GI strip thru rope and lay at the roof

Rope

GI strip shall be welded together and laid on the roof as

Welding
machine and
drill machine

6.

Lime powder
Barricading
tape
Measuring
Tape

per drawing

7.

Welded portion shall be painted with GI spray paint

8.

For fixing the GI strip on the roof, saddling of strip shall


be done

9.

Self threaded screw and weather proof washer shall be


used for fixing / saddling of GI Strip on the roof sheet.

10.

GI strip shall be laid down vertically from the roof to


connect to the earth pit.

Measuring
Tape

11.

Vertical drop shall be welded with the Columns and if


saddling require with sheet, self threaded screw and
weather proof washer shall be used

Welding
machine and
drill machine

12.

Housekeeping must be done after completion of work