You are on page 1of 98

JADUAL PURATA KADAR HARGA

2014

JABATAN PENGAIRAN DAN SALIRAN,


MALAYSIA

JADUAL PURATA
KADAR HARGA 2014

ISI KANDUNGAN
BAHAGIAN

PERKARA

1.0

Pendahuluan Dan Panduan Pengunaan

2.0

Kos Kerja-Kerja Am (General Items)


2.1 Tujuan Dan Definisi
2.2 Bentuk Maklumat Dan Pembahagian
2.2.1 Peratusan Kos Keseluruhan Kerja Am Daripada
Kos Kerja Pembina
2.2.2 Peratusan Kos Terperinci Kerja Am Daripada
Kos Kerja Pembina

3.0

Kos Item-Item Kerja


3.1 Tujuan
3.2 Bentuk Maklumat
3.3 Klasifikasi Kerja
3.3.1 Environmental Protection and Enhancement

MUKASURAT
1-3
4

5
6-7

9 - 11

3.3.2 Traffic Management And Control

12

3.3.3 Site Investigation Work

13

3.3.4 Demolition & Site Clearance

14 - 15

3.3.5 Earthworks

16 - 25

3.3.6 Geotechnical Work

26 - 33

3.3.7 Piling Work

34 - 42

3.3.8 Concrete Work

43 - 47

3.3.9 Brickwork, Blockwork & Masonry

48

3.3.10 Timber Work

49

3.3.11 Metal Work

50 - 51

3.3.12 Building Work

52 - 60

3.3.13 Painting Work

61

3.3.14 Pipeworks

62 - 63

3.3.15 Drainage Work

64 - 70

3.3.16 Roads And Pavings

71 - 75

3.3.17 Miscellaneous Works

76 - 79

4.0

Kos Upah Buruh

80 - 81

5.0

Kos Sewa Loji & Peralatan

82 - 84

PENDAHULUAN DAN
PANDUAN PENGGUNA

JABATAN PENGAIRAN DAN SALIRAN,


MALAYSIA

JADUAL PURATA
KADAR HARGA 2014

1.0

PENDAHULUAN DAN PANDUAN PENGGUNAAN

1.1

TUJUAN
1.1.1

1.2

Tujuan buku ini dikeluarkan adalah untuk memberikan maklumat


berkenaan dengan kos bagi melaksanakan kerja-kerja Jabatan
Pengairan dan Saliran. Maklumat-maklumat kos ini boleh digunakan
sebagi panduan untuk menyediakan anggaran kos, membuat
pelarasan kadar harga atau untuk tujuan perundingan kadar harga.

KANDUNGAN
1.2.1

1.2.2

Maklumat-maklumat yang terkandung di dalam buku ini adalah


berdasarkan kepada dokumen-dokumen tender bagi kerja-kerja
Jabatan Pengairan dan Saliran yang pada amnya adalah terdiri dari:

i)

Kerja-kerja Saliran dan Tebatan Banjir

ii)

Kerja-kerja Kejuruteraan Pantai

iii)

Kerja-kerja Kejuruteraan Sungai

Maklumat-maklumat ini disusun dalam empat (4) bahagian utama


iaitu;

i)

Kos Kerja-kerja Am (General Items)

ii)

Kos Item-item Kerja

iii)

Kos Upah Buruh

iv)

Kos Sewa Loji & Peralatan

JADUAL PURATA
KADAR HARGA 2014

1.2.3

Maklumat-maklumat kos ini juga dibahagikan mengikut kategori


kawasan di mana projek tersebut dilaksanakan iaitu seperti berikut:

NEGERI

KATEGORI KAWASAN

1.3

1.4

Kawasan Utara

Perlis
Kedah
Pulau Pinang
Perak

Kawasan Tengah

Wilayah Persekutuan Kuala Lumpur


Selangor
Negeri Sembilan
Melaka
Johor

Kawasan Timur

Pahang
Terengganu
Kelantan

SUMBER MAKLUMAT / PEMILIHAN SAMPEL


1.3.1

Data-data di dalam buku ini adalah diabstrak dari dokumendokumen tender secara konvensional bagi projek yang ditender
dalam tahun 2014 dan ditutup di Ibu Pejabat Jabatan Pengairan Dan
Saliran Malaysia.

1.3.2

Kadar harga diambil daripada dokumen tender yang disediakan


berasaskan kepada senarai kuantiti.

ANALISA DAN SUSUNAN DATA


1.4.1

Data-data bagi item yang serupa dikumpulkan dan dijadikan dalam


bentuk purata. Data-data yang terlalu tinggi atau rendah tidak
diambilkira.

JADUAL PURATA
KADAR HARGA 2014

1.5

1.4.2

Melalui penganalisaan tersebut adalah didapati wujudnya


ketidakseragaman di dalam penyediaan dokumen tender/tawaran,
samada dari segi pengukuran kuantiti dan keterangan kerja bagi
beberapa item kerja. Sehubungan dengan itu, item-item yang
serupa/hampir serupa telah dikumpulkan bersekali dan dikira dalam
bentuk purata. Pertimbangan tidak diberikan sekiranya cara
pengukuran berbeza walaupun ia adalah item kerja yang sama.

1.4.3

'Harga Purata' bagi sesuatu kawasan diperolehi berdasarkan kepada


jumlah nilai data-data kos bagi sesuatu item kerja yang dibahagikan
kepada bilangan sampel mengikut kawasan berkenaan.

1.4.4

Purata keseluruhan adalah berdasarkan kepada nilai purata bagi


semua kawasan.

PEMAKAIAN DATA
1.5.1

Data-data di dalam buku ini hendaklah digunakan sebagai panduan


sahaja.

1.5.2

Pengguna hendaklah menggunakan budibicara bagi memilih kos


yang bersesuaian dengan berdasarkan kepada;
i)

Nilai kontrak

ii)

Keperluan spesikasi

iii)

Cara pengukuran bagi projek yang akan dilaksanakan

iv)

Lokasi projek

v)

Keadaan pasaran semasa

KOS KERJA-KERJA AM
(GENERAL ITEMS)

JABATAN PENGAIRAN DAN SALIRAN,


MALAYSIA

JADUAL PURATA
KADAR HARGA 2014

2.0

KOS KERJA-KERJA AM (GENERAL ITEMS)

2.1

TUJUAN DAN DEFINISI


Bahagian ini mengandungi maklumat berhubung dengan kos bagi melaksanakan
kerja-kerja di bawah kategori 'Kerja-kerja Am' (General Items). Terdapat sesetengah
dokumen yang menamakan bahagian ini sebagai 'Preliminaries', 'Kerja Awalan'
ataupun 'Kerja-kerja Pendahuluan'.

2.2

BENTUK MAKLUMAT DAN PEMBAHAGIAN


Maklumat bagi bahagian ini diberikan dalam bentuk peratusan dan dibahagikan
kepada dua bahagian seperti berikut:2.2.1

Peratusan Kos Keseluruhan Kerja Am Daripada Kos kerja Pembina


Maklumat bagi kos keseluruhan adalah berdasarkan kepada
penganalisaan ke atas kos keseluruhan bagi Kerja-kerja Am (General
Items).

Cara pengiraan peratusan:


G.I
T.S - (G.I. + P.S + P.C)

2.2.2

X 100%

Peratusan Kos Terperinci Kerja Am Daripada Kos Kerja Pembina

Maklumat bagi kos terperinci adalah berdasarkan kepada penganalisaan


ke atas kos bagi setiap item Kerja-kerja Am (General Items).

Cara pengiraan peratusan:


Item in G.I.
T.S - (G.I + P.S + P.C)

Petunjuk:

X 100%

i)
ii)
iii)

G.I
T.S
P.S

=
=
=

iv)

P.C

Kos Kerja Am (General Items)


Harga Tender (Tendered Sum)
Wang Peruntukan Sementara
(Provisional Sum)
Wang Kos Prima (Prime Cost Sum)

JADUAL PURATA
KADAR HARGA 2014

2.2.1 : PERATUSAN KOS KESELURUHAN KERJA AM DARIPADA KOS KERJA PEMBINA


(TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA)

BIL

NILAI TENDER

UNIT

UTARA
PURATA
(%)

TENGAH
PURATA
(%)

TIMUR
PURATA
(%)

KESELURUHAN
PURATA
(%)

Melebihi 5 juta tidak melebihi 10 juta

11.75

11.75

Melebihi 10 juta tidak melebihi 20 juta

4.75

4.75

Melebihi 20 juta

3.05

3.55

3.44

3.35

JADUAL PURATA
KADAR HARGA 2014

2.2.2 : PERATUSAN KOS TERPERINCI KERJA AM (GENERAL ITEMS) DARIPADA KOS KERJA PEMBINA
(TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA)

BIL

KETERANGAN KERJA

UNIT

UTARA
PURATA
(%)

TENGAH
PURATA
(%)

TIMUR
PURATA
(%)

KESELURUHAN
PURATA
(%)

Contractual Requirement

Contractor's All Risk


- Insurance Of Works
- Public Liability Insurance

0.31

0.30

0.19

0.27

Performance Bond

0.28

0.33

0.15

0.25

Perkeso / SOCSO

0.06

0.10

0.04

0.07

Compliance with laws, regulations and all relevant


authorities

0.27

0.27

Engineer / SO / PD's Requirement

Establishment & Removal Of SO's Site Oce

0.22

0.11

0.17

Establishment, Maintenance & Removal Of SO's Site


Oce

0.15

0.15

Maintenance Of SO's Site Oce

0.01

0.01

Laboratory Equipment

Pre & Post Survey

Preparation & Submission Of 'As Built Drawings'

0.08

0.08

0.07

0.08

Progress Photographs

Progress Report

0.01

0.03

0.02

Project Signboard

0.04

0.06

0.01

0.04

10

Survey Works

0.32

0.30

0.31

JADUAL PURATA
KADAR HARGA 2014

2.2.2 : PERATUSAN KOS TERPERINCI KERJA AM (GENERAL ITEMS) DARIPADA KOS KERJA PEMBINA
(TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA)

BIL

KETERANGAN KERJA

UNIT

UTARA
PURATA
(%)

TENGAH
PURATA
(%)

TIMUR
PURATA
(%)

KESELURUHAN
PURATA
(%)

11

Surveying Equipment

0.10

0.05

0.04

0.06

12

Testing & Sampling

0.03

0.03

13

Work Programme

0.03

0.15

0.09

Contractor's Requirement

Clearing & Cleaning Up Upon Completion

0.07

0.07

Establishment, Maintenance
Contractor's Site Oce

Of

0.22

0.22

Establishment, Maintenance & Removal Of


Contractor's Oce, Workmen Accommodation, Store
etc

Establishment, Maintenance & Removal Of Workmen


Accommodation

Moblization & Demobilization Of Construction Plant &


Equipment

0.20

0.44

0.32

Site Agent

0.68

0.68

Temporary works

1.24

1.28

0.44

0.99

&

Removal

KOS ITEM-ITEM KERJA

JABATAN PENGAIRAN DAN SALIRAN,


MALAYSIA

JADUAL PURATA
KADAR HARGA 2014

3.0

KOS ITEM-ITEM KERJA

3.1

TUJUAN
Bahagian ini memberikan maklumat berhubung dengan data-data kos bagi itemitem kerja yang dilaksanakan.

3.2

BENTUK MAKLUMAT
Maklumat bagi bahagian ini diberikan di dalam bentuk kadar harga purata dan
dibahagikan mengikut klasikasi kerja sebagaimana ditetapkan di dalam
MyCESMM (Malaysian Civil Engineering Standard Method Of Measurement).

3.3

KLASIFIKASI KERJA
Klasikasi kerja adalah seperti berikut:3.3.1
3.3.2
3.3.3
3.3.4
3.3.5
3.3.6
3.3.7
3.3.8
3.3.9
3.3.10
3.3.11
3.3.12
3.3.13
3.3.14
3.3.15
3.3.16
3.3.17

Environmental Protection and Enhancement (CLASS B)


Trac Management And Control (CLASS C)
Site Investigation Work (CLASS D)
Demolition & Site Clearance (CLASS E)
Earthworks (CLASS F)
Geotechnical Work (CLASS G)
Piling Work (CLASS H)
Concrete Work (CLASS I)
Brickwork, Blockwork & Masonry (CLASS J)
Timber Work (CLASS K)
Metal Work (CLASS L)
Building Work (CLASS M)
Painting Work (CLASS N)
Pipeworks (CLASS O)
Drainage Work (CLASS P)
Roads and Pavings (CLASS Q)
Miscellaneous Works (CLASS T)

JADUAL PURATA
KADAR HARGA 2014

3.3.1: ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

18,083.03

15,100.00

16,591.52

2,100.00

2,100.00

32,350.00

36,730.46

KAWASAN
TIMUR

KESELURUHAN

ENVIRONMENTAL MANAGEMENT PLAN (EMP)


1

Preparation of environmental management plan to


the approval of the S.O. which shall include erosion
and sediment control plan (ESCP), noise, air and
water quality monitoring and compliance with
requirements of the local Authorities'.

Item

Appointment of certied professional in ESCP


ocer along the duration of the contract.

mth

EROSION AND SEDIMENT CONTROL PLAN (ESCP)


3

Construction and maintenance of ESCP and


environmental monitoring facilities and including
implementation of the environmental managemant
plan and making good upon completion of the
works.

Item

41,110.93

Silt fence of 1.0 m height as per Specication clause


1.5.2 and as shown in the drawings.

20.36

20.36

Sand bag as per Specication clause 1.5.2 and as


shown in the drawings.

no.

32.80

32.80

Maintenance
Items for maintenance of silt fence and sand bags
shall be deemed to include disposal of accumulated
debris, sediment and silt to approved site, unless
otherwise stated.

Silt fence.

Item

3,954.55

3,954.55

Sand bag.

Item

3,831.83

3,831.83

JADUAL PURATA
KADAR HARGA 2014

3.3.1: ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

WATER QUALITY CONTROL AND MONITORING


8

Mechanical Mobile Silt Trap for online river storage


works to comply with Standard (A/B) of the
Environmental Quality Act. Rate should be include
chemicals supply, operation and maintenance upon
completion of work.

no.

39,727.27

39,727.27

Water Quality Sampling and In situ Testing


Water quality sampling and monitoring by
accredited laboratory on a monthly basis at the
discharge outlet of active treatment system to
comply with the requirements of Standard (A/B) of
the Environmental Quality Act for the following
parameters.
9

pH

no.

102.27

102.27

10

Total suspended solid (TSS).

no.

103.18

103.18

11

Dissolved Oxygen (DO)

no.

99.32

99.32

12

Ammoniacal nitrogen

no.

106.82

106.82

Item

15,863.64

15,863.64

AIR QUALITY CONTROL AND MONITORING


13

Construct and maintenance entrance access and


provide washing pit upon the completion of works
as per specication and as shown in drawing.

10

JADUAL PURATA
KADAR HARGA 2014

3.3.1: ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

WASTE MANAGEMENT
14

Construction solid waste as per Specication clause


1.5.2. (General Specication) Rate to include
provision of collection bins, temporary storage
area, and disposal to approved site.

Item

9,931.80

9,931.80

ENVIRONMENTAL REPORT
15

Sampling, laboratory testing, monitoring and


submission of monthly reports for water quality, air
quality, noise and vibration control, waste
management and health.

mth

16

Environmental monitoring report in 5 (ve) sets on


a monthly basis for the TSS content at the
discharge outlet of the Active Treatment System.

Item

5,336.37

5,336.37

17

Environmental audit report on a annual basis in ve


sets.

Item

4,454.55

4,454.55

18

Environmental closure audit report in ve sets.

Item

3,795.46

3,795.46

11

2,070.19

2,070.19

JADUAL PURATA
KADAR HARGA 2014

3.3.2: TRAFFIC MANAGEMENT AND CONTROL (CLASS C)

BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

manmth

2,746.43

PURATA KADAR HARGA 2014 (RM)


KAWASAN
KAWASAN
KESELURUHAN
TENGAH
TIMUR

TRAFFIC MANAGEMENT PLAN


Trac Management Team
1

Trac Management Ocer.

12

2,746.43

JADUAL PURATA
KADAR HARGA 2014

3.3.3: SITE INVESTIGATION WORK (CLASS D)

BIL

PURATA KADAR HARGA 2014 (RM)


KAWASAN
KAWASAN
KESELURUHAN
TENGAH
TIMUR

KETERANGAN KERJA

UNIT

To carry out Field Density Test & Moisture Content


Test in accordance to BS 1377 on each 300mm
layer of compacted earth using sand replacement
method. Rate shall include sampling, material
testing & reporting. The test results falling below
the specied value will not be paid.

no.

153.85

153.85

To carry out Atterberg Limit test. The tests shall


include Liquid Limit, Plastic Limit, Plasticity Index
and Linear Shrinkage. Rate shall include sampling,
material testing and reporting.

no.

242.77

242.77

KAWASAN
UTARA

TESTING

13

JADUAL PURATA
KADAR HARGA 2014

3.3.4: DEMOLITION & SITE CLEARANCE (CLASS E)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

BUILDING / STUCTURES / PIPELINES


Demolition and removal from worksite and dispose
o site to contractor's own dumping ground of
existing structures and obstructions.
8

House or building
i) concrete
ii) Wooden

no.
no.

3,000.00
2,166.67

3,000.00
2,166.67

Individual buildings - store of total gross built-up


area 25m2.

no.

1,500.00

1,500.00

10

Demolition of existing RC concrete bridge 15m


length with cart away to contractor's own site.

no.

15,000.00

15,000.00

11

Demolition of existing concrete bridge of 5.0 m (W)


x 30 m (L) shall be deemed to include demolition
and removal of supports.

no.

45,000.00

45,000.00

12

Bridges

no.

6,690.00

6,690.00

13

Pipe culvert

60.00

60.00

14

Manhole or sump

no.

191.57

191.57

15

Existing Road

m2

4.55

4.55

16

Below ground - precast Monsoon Drain including


headwall and wingwall 350m long x 5m wide x
0.75m deep.

50.00

50.00

17

Below ground - precast L-shape Drain including


foundation of 400m long x 7.12 m wide x varies in
height (3.5m - 5.0m).

210.00

210.00

18

Above ground - (one number of 15m x 4m existing


bridge including their foundation)

no.

19

Existing Concrete Drain.

15

15,000.00

15,000.00

10.00

10.00

JADUAL PURATA
KADAR HARGA 2014

3.3.4: DEMOLITION & SITE CLEARANCE (CLASS E)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

ha

3,114.80

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

GENERAL CLEARANCE
Clearing and stripping o top layer of spillway
foundation and other related works.
1

Site clearance to areas within the boundary of


works inclusive of cutting

down

3,114.80

all trees

irrespective of sizes, undergrowth bushes, shrubs,


tall grass etc grubbing up roots stumps, and
disposal of all debris away from site.
2

General clearance to primary forest including


removal of trees and stumps, undergrowth, shrubs,
roots, and the likes. All trees of 0.5 m girth and
above shall become the property of the Employer.

ha

5,144.55

5,144.55

At water bodies including pumping out of water


and to include removal of items (such as tree trunk,
sludge, solid waste, debris) either oating,
submerged or at the bed of the water body.

ha

5,522.73

4,511.36

The reserve width of the new waterway alignment.

ha

2,480.38

2,480.38

3,500.00

TREES
Cutting down and dispose of trees having a girth of

a) 500mm - 1m

no.

50.20

50.20

b) 1-2m

no.

93.00

93.00

c) 2-3m

no.

217.00

217.00

14

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

EXCAVATION
Cut to Fill
Excavation in cut shall be deemed to include
trimming and preparation of excavated surface and
transportation from source to place of ll.

Excavate in earth material from original ground


level to form embankment within the site to nish
level of RL+13.00m.

m3

4.97

4.97

Excavate in earth material from original ground level


to form Collector Drain.

m3

5.70

5.70

Excavation and trimming of existing river slopes (in


front of anchored sheet pile at river edge) to
required bed levels as per construction drawings or
as directed by the S.O.

m3

5.70

5.70

Excavate from existing ground level within


proposed channel/river reserve or project area to
construct diversion channel to the alignment,
levels, width and slopes as shown in the Contract
plan and stockpile suitable excavated material for
the construction of river bund.

m3

2.88

2.88

15.80

15.80

Cut and Dispose


5

Excavate and dispose o site the surplus or


unsuitable excavated material to contractor's own
dump site. Contractor to get approval from
relevant athorities and S.O for dump site.

m3

Excavate in rock material by controlled blasting


including dispose to stock pile area, loading and
unloading of rocks.

m3

16

22.30

22.30

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Excavate in natural hard material.

m3

21.00

21.00

Excavate in rock using hydraulic rock breaker.

m3

32.09

32.09

Excavate in rock prole of diversion channel


without the use of explosive and dispose o site
the excavated rock to contractor's own dump site.

m3

20.15

20.15

10

Excavation in cut shall be deemed to include


trimming and preparation of excavated surface and
transportation from source to place of ll or
disposal.

m3

10.41

8.05

9.23

11

Ditto; Excavate in earth material at the base of the


main bund down to a level where the ground
strength is equal to or more than SPT N value of 10.
For approximation, it is assumed that excavation
will be 1 m deep.

m3

6.00

8.05

7.02

12

Ditto; Excavate in earth material commencing from


RL +29.0m to 27.0m to construct Side Spillway
approved by S.O.

m3

8.74

8.74

13

Ditto; Excavate in earth material dispose to the


designated dumping area within 6 km approved by
the S.O./Engineer.

m3

9.16

9.16

14

Excavate in Detention Pond commencing from level


RL+13.0m to RL+5.0m and dispose, spread and
level it within the project site as approved by the
S.O.

m3

4.79

4.79

15

Excavate in Detention Pond commencing from level


RL+13.0m to RL+5.0m and dispose to the
contractors disposal site approved by the S.O.

m3

5.19

5.19

17

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

16

Excavate in earth material commencing from EL


+14m to +5m to construct Side Spillway approved
by S.O.

m3

5.77

5.77

17

Excavate in earth material commencing from


existing level (approx. 35.79m - 40.61m) to
proposed design level (approx.32.99m - 32.81m)
not exceeding 9m to disposal site approved by the
S.O.

m3

14.00

14.00

18

Excavate in earth material commencing from


existing level (approx. 39.24m - 40.56m) to
proposed design level (approx. 32.04m - 32.09m)
not exceeding 9m to disposal site approved by the
S.O.

m3

13.45

13.45

19

Excavate in earth material for pile caps and


abutments to disposal site approved by the S.O.

m3

10.05

10.05

20

Excavate in earth material to construct the Buttress


wall.

m3

8.62

8.62

21

Excavate in earth material commencing from level


as specied.

m3

8.41

8.41

22

Excavate in earth material to construct the log


boom.

m3

8.92

8.92

23

Excavate in unsuitable material to construct the log


boom.

m3

9.09

9.09

24

Excavate in unsuitable material to disposal site


approved by the S.O/Engineer.

m3

10.82

10.82

25

Excavate in unsuitable material to construct the


Buttress wall.

m3

9.62

9.62

18

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

26

Excavation for foundation shall include upholding


sides of excavation, preparation of excavated
surface, additional excavation to provide working
space and removal of dead services.

m3

8.59

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

8.59

FILLING
27

Using suitable excavated material to form river


bank to level RL+13.00m including formation of
benches.

m3

28

Using suitable excavated material to grading limits


for backll at back of sheet pile area.

m3

3.60

3.60

29

Import material from Contactor's own source with


grading limits as per Specication to lling (1m
depth) to form embankments & access roads at
back of Steel Sheet Pile Walls including formation of
benches.

m3

22.60

22.60

30

Imported material from Contactor's own source


with grading limits as per Specication for Earthll,
Type 1 material to form embankment. Rate to
include formation of benches.

m3

24.56

24.56

31

Imported material from Contactor's own source


with grading limits as per Specication for Earthll,
Type 2 material to form embankment. Rate to
include formation of benches.

m3

21.47

21.47

32

Imported material from Contractor's own source


with grading limit as per Specication (Type 1
Material) for use as clay core material for bund.

m3

20.85

20.85

19

5.52

5.52

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

33

Imported material from Contractor's own source


with grading limits as per Specication (Crusher
Run) for U drain foundation as indicated.

m3

62.13

62.13

34

Imported material from Contractor's own source


with grading limit as per Specication (Rip Rap) for
use as slope protection for bund.

m3

73.63

73.63

35

Imported material from Contactor's own source


approved by the S.O.

m3

19.45

19.45

36

Imported sand as backll material to a depth of


maximum 0.5m.

m3

53.22

53.22

37

Granular material as ll below transition slab.

m3

30.38

30.38

38

Granular material as ll behind walls of culverts.

m3

31.13

31.13

39

Granular material as per Specication (ne lter)


for use in the toe drain.

m3

59.04

59.04

40

Granular material as per Specication (medium


lter) for use in the toe drain.

m3

61.27

61.27

41

Granular material as per Specication (coarse lter)


for use in the toe drain.

m3

59.17

59.17

42

Supply, spread, level and compact in layers


imported granular backll behind abutments and
under approach slab as specied.

m3

56.86

56.86

43

300mm thick permeable layer comprising of 20mm 40mm crushed stone.

m3

24.22

24.22

44

200 mm thick compacted mearth material as


bedding.

m2

6.65

6.65

20

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

45

Top soil of average depth of 150 mm and stockpile


for reuse as top soil for turng.

m2

1.22

46

Handle, transport, spread and level 75mm thick


local top soil (from Item 2.1.3) including trimming,
level and grading of slope.

m2

1.50

1.50

47

Ditto - imported top soil.

m2

4.97

4.97

48

Concrete Interlocking Blockmat VIP LINER


Supply and lay 50 to 100 mm diameter underlayer
stones of VIP LINER or as directed by S.O.

m3

71.15

71.15

m2

8.39

8.39

m2
m2

7.32
10.08

7.32
10.08

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

1.22

FILLING ANCILLARIES
49

50
51

Provision and placement of Geotextile Polyfelt


TS65 or approved equivalent/as per manufacturer's
specication.
Geotextile
Supply and lay geotextile type :
-TS 50 or equivalent
-F68 or equivalent.

52

Supply and lay non woven geotextile TS-50 or


equivalent.

m2

6.62

6.62

53

Supply and lay MXC 50 non woven geotextiles or


equivalent. .

m2

5.07

5.07

54

(Nonwoven) geotextile with nominal weight of 280


g/m2 at pond inlets.

m2

55

Supply and Lay geotextile at toe as separator Type


TS50 or equivalent.

m2

21

7.32

7.32

4.86

4.86

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Cemented Rubble Pitching


56

Supply and lay cemented rubble pitching 300 mm


thick along river channel including all necessary
weepholes and lter aggregates.

m2

74.62

74.62

57

Continous polypropylene lament, non-woven


geotextile with tensile strength of 19 kN/m,
eective opening size of 0.09 mm and nominal
mass of 250 g/m2 as per Specication.

m2

5.81

5.81

3.40

3.40

LANDSCAPING
Items for landscaping shall be deemed to include
digging, planting media, bedding, stalking,
protection, watering, weeding, required fertilising,
58

Spot turng to at areas.

m2

59

Supply and lay spot turng.

m2

4.42

4.42

60

Supply, spread evenly 50mm top soil and spot


turng.

m2

5.47

5.47

61

Close turng to slopes including pegging down with


stakes.

m2

4.92

4.28

4.60

62

Close turng including placement of 50mm thick


approved topsoil as directed by SO.

m2

4.68

63

To supply, spread and lay close turng inclusive of


all necessary pegging, soil watering, weeding and
tending until establishment, all as prescribed to
slope.

m2

5.27

5.27

64

Ditto - spot turng at an angle exceeding 10 degree


to the horizontal.

m2

3.16

3.16

65

Ditto - spot turng at an angle not exceeding 10


degree to the horizontal.

m2

3.22

3.22

22

4.68

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

66

Hydroseeding as per Specication Clause 12007 to


the slopping area approved by S.O.

m2

4.53

4.53

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Turf Reinforcement Mat (TRM)


67

Supply and Install Turf Reinforcement Mat (TRM)


Type C350 or equivalent, inclusive of cutting,
handling, laying and jointing.

m2

12.64

12.64

68

Hydroseeding with selected grass species as specify


in the specication or as approve by S.O and
inclusive of approved fertilizer, necessary soil
watering, weeding and tending until establishment,
all as prescribed to slope.

m2

4.03

4.03

69

Supply and Install Galvanised Mild Steel Staple pin


size R12- 600 mm as shown in the drawing or as
directed by S.O.

no.

2.88

2.88

70

Water seepage / cut-o control measure.

m2

91.45

91.45

71

TREE
Spathodea campanulata (Fountain Tree) O.H.
4.0m, Trunk Diameter 50mm - 65mm.

no.

309.09

309.09

72

Melaleuca leucadendron (Gelam) O.H. 4.0m, Trunk


Diameter 50mm - 65mm.

no.

337.36

337.36

73

Syzygium cumini (Salam)


Diameter 50mm - 65mm.

O.H. 4.0m, Trunk

no.

326.90

326.90

74

Hopea odorata (Cengal Pasir) O.H. 4.0m, Trunk


Diameter 50mm - 65mm.

no.

343.72

343.72

75

Pomelia pinnata (Taun Tree) O.H. 4.0m, Trunk


Diameter 50mm - 65mm.

no.

332.72

332.72

76

Delonix regia (Flamboyant) O.H. 4.0m, Trunk


Diameter 50mm - 65mm.

no.

348.63

348.63

23

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

77

Pandanus tectorius (Screwpine) O.H. 4.0m, Trunk


Diameter 50mm - 65mm.

no.

411.81

411.81

78

Pelthophorum pterocarpum (Yellow Flamboyant)


O.H. 4.0m, Trunk Diameter 50mm - 65mm.

no.

389.09

389.09

no.

5.77

5.77

79

SHRUB
Orthosiphon stamineus (Misai Kucing) O.H. 0.3m,
Planting distance 300mm.

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

80

Calathea lutea (Pampano) O.H. 0.6m, Planting


distance 300mm.

no.

7.04

7.04

81

Acalypha siamensis (Wild Tea) O.H. 0.6m, Planting


distance 300mm.

no.

6.29

6.29

PLANTING WORKS
HOLE EXCAVATION
To supply all labour, equipment, tools, transport,
etc and excavate planting hole and cart away all
excavated materials to contractor's own dump site.
82
83

Tree ( 1.0m x 1.0m x 1.0m)


Shrubs (0.3m x 0.3m x 0.3m)

no.
no.

16.45
2.61

16.45
2.61

m3
m3

39.81
34.36

39.81
34.36

TOPSOIL MIXTURE

84
85

To supply all labours, equipment, tools,transport,


etc. and spread approved soil mixture (ratio3:2:1)
(Topsoil: Organic fertilizer : sand) to ll excavated
holes.
Tree ( 1.0m x 1.0m x 1.0m)
Shrubs (0.3m x 0.3m x 0.3m)

24

JADUAL PURATA
KADAR HARGA 2014

3.3.5: EARTHWORKS (CLASS F)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

no.

20.27

20.27

no.
no.

7.90
2.95

7.90
2.95

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

TREE STAKES AND TIES


Provide stakes and ties for all planted trees
according to planting specication. All the staking
shall peproper tight to the new planted trees to L.A
approval; The stakes shall be painted with green
colour for protection.
86

Trees
MULCHING
Supply, deliver and lay minimum 50mm thick coco
ber around the planted plants as stated in
planting plan and directed by S.O./ Landscape
Architect.

87
88

Trees
Shrubs

25

JADUAL PURATA
KADAR HARGA 2014

3.3.6 : GEOTECHNICAL WORK (CLASS G)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Supply and Install of Sandll Mattress as shown in


the contract plan or directed by SO, inclusive of
trimming, cutting, handling, laying and jointing.
7

a) Ditto - Inll with sand as approved by S.O

m2

67.61

67.61

b) Ditto - Without sand in ll

m2

43.67

43.67

To construct top trenching work (0.6m width by


0.6m depth) for sandll mattress anchoring and
backll with compacted local suitable material.

4.23

4.23

Green Mattress
10

Supply and deliver Green Mattress 230mm thk


inclusive of 150mm x 225mm rock and labour. Rate
shall include all alignment, machineries and related
works.

m2

59.09

59.09

11

Installation of Green Mattress 300mm thk inclusive


of stone size 100mm - 200mm.

m2

36.36

36.36

Reno Mattress
12

Supply and deliver Reno Mattress 300mm thk


inclusive of 150mm x 225mm rock and labour. Rate
shall include all alignment, machineries and related
works.

m2

46.00

46.00

13

Installation of Reno Mattress 300mm thk inclusive


of stone size 100mm - 200mm

m2

28.55

28.55

m2

4.41

4.41

Macmat S Mattress
14

Supply, Lay and Spread evenly 50mm top soil on


top of lid and 75mm top soil under Macmat 10 or
approved equivalent.

27

JADUAL PURATA
KADAR HARGA 2014

3.3.6 : GEOTECHNICAL WORK (CLASS G)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

RETAINING STRUCTURES
GABION
1

1.0 m x 1.0 m x 1.0 m rock-lled gabion with PVCcoated wire gauge size of 2.7 mm dia. as shown in
the drawings including for laying underwater.

m3

224.55

224.55

2.5 m x 1.0 m x 1.0 m rock-lled gabion with PVCcoated wire gauge size of 3 mm as per Specication
clause 6002 and as shown in the drawings.

m3

180.00

180.00

2.0 m x 1.0 m x 1.0 m rock-lled gabion with PVCcoated wire gauge size of 3 mm as per Specication
clause 6002 and as shown in the drawings.

m3

180.00

180.00

1.5 m x 1.0 m x 1.0 m rock-lled gabion with PVCcoated wire gauge size of 3 mm as per Specication
clause 6002 and as shown in the drawings.

m3

150.00

150.00

REVETMENT MATTRESS
Sandll Mattress
5

Slope trimming for base preparation to receive


slope revetment materials.

m2

3.14

3.14

Supply, deliver and install the Sand Filled Mattress


with minimum weight of 180kg/m2 as specied in
the specication and tender drawing including all
necessary
works for proper completion.
Measurement will be based on nett quantity of
work done on site including the shrinkage of the
fabric.

m2

44.75

44.75

26

JADUAL PURATA
KADAR HARGA 2014

3.3.6 : GEOTECHNICAL WORK (CLASS G)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

15

Supply and delivery MacMat S or approved


equivalent
three
dimensional
matting,
monolaments with open structure of more than
95% area holding capacity as per necessary
equipment and alignment with manufacture
specication.

m2

20.86

20.86

16

Install MacMat S or approved equivalent inclusive


of J pins (12mm diameter x 500mm @ 1m c/c
spacing vertically and horizontally.

m2

8.37

8.37

17

Supply, Deliver Green Reinforced MacMat A three


dimensional matting, monolaments with open
structure of more than 80% area holding capacity
as per necessary equipment and alignment with
manufacture specication or equivalent.

m2

35.00

35.00

18

Supply and delivery TM-53 Toe Protection


Hydraulic Terramesh with Green MacMat 10 &
Biomac facing for the construction of Mechanical
Stabilise Earth (MSE) system or equivalent.

no.

318.26

318.26

19

Install and lay TM-53 Toe Protection Hydraulic


Terramesh inclusive of 6" x 9" rock ll , labour and
others related work within the Hydraulic Green
Terramesh units. Rate shall include all alignment,
machineries and related works.

m3

178.00

178.00

87.75

87.75

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

RIPRAP EMBANKMENT
20

Supply, deliver and lay the Rip rap with average size
of 300mm diameter.

m3

21

Average 600mm thick rip rap of 300mm diameter


stone for embankment.

m3

28

81.50

81.50

JADUAL PURATA
KADAR HARGA 2014

3.3.6 : GEOTECHNICAL WORK (CLASS G)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

22

Supply, lay and stich to the manufacture's


specication non-woven needle punch geotextile of
Type A as lter material. (Measured nett - no
allowance made for laps)

m2

6.30

6.30

23

Supply and construct 200mm thick lter bedding


materials.

m3

61.50

61.50

24

Supply and lay 225mm thick 200/400mm cement


Grouted rip-rap.

m2

31.35

31.35

25

Supply and lay 200mm thick 10/50mm stone.

m2

13.86

13.86

26

Supply and lay rip-rap stone size 300mm - 550mm


diameter.

m3

73.48

73.48

27

(300 mm) thick rip rap as per specication to form


the surface protection at the pond inlets (3
locations).

m2

28

Armour Rocks
Supply and lay rip-rap granatic rock with size D50
=500mm minimum thickness of 1000mm.

KAWASAN
TENGAH

72.23

KAWASAN
TIMUR

KESELURUHAN

72.23

m3

62.05

62.05

MSE Wall TYPE A


Green Terramesh
29

Supply and deliver TM 254 GREEN TERRAMESH or


approved equivalent for the construction of
Mechanical Stabilise Earth (MSE) system.

no.

315.78

315.78

30

Install and lay TM 254 GREEN TERRAMESH or


approved equivalent inclusive of 150mm x 225mm
rock ll, labour and others related work within the
MSE wall units. Rate shall include all alignment,
machineries and related works.

m3

99.09

99.09

29

JADUAL PURATA
KADAR HARGA 2014

3.3.6 : GEOTECHNICAL WORK (CLASS G)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

31

Supply and deliver GTM 70 2345 GREEN


TERRAMESH or approved equivalent for the
construction of Mechanical Stabilise Earth (MSE)
system.

no.

366.09

366.09

32

Install and lay GTM 70 2345 GREEN TERRAMESH or


approved equivalent including all alignment,
machineries and related works.

m3

43.64

43.64

33

Supply and spread 300mm thk. crusher run


inclusive compaction.

m3

55.73

55.73

34

Supply and ll Suitable granular backll material


inclusive compaction.

m3

48.73

48.73

35

Supply and ll with suitable selected earth ll


material including compaction.

m3

24.18

24.18

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Hydraulic Green MSE Wall


36

Supply and deliver TM-0.5m thk. x 7m length Toe


Protection Terramesh MSE Wall with 10mm thk.
erosion protection mat & Biomac facing for the
construction of mechanical Stabilise Earth (MSE)
system or equivalent.

no.

341.80

341.80

37

Install and lay TM-0.5m thk. x 7m length Toe


Protection Terramesh inclusive of 150mm x
225mm rock ll, labour and others related work
within the MSE wall units. Rate shall include all
alignment, machineries and related works.

m3

112.62

112.62

30

JADUAL PURATA
KADAR HARGA 2014

3.3.6 : GEOTECHNICAL WORK (CLASS G)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

38

Supply and deliver TM-0.5m thk. x 6m length Toe


Protection Terramesh MSE Wall with 10mm thk.
erosion protection mat & Biomac facing for the
construction of mechanical Stabilise Earth (MSE)
system or equivalent.

no.

331.91

331.91

39

Install and lay TM-0.5m thk. x 6m length Toe


Protection Terramesh inclusive of 150mm x
225mm rock ll, labour and others related work
within the MSE wall units. Rate shall include all
alignment, machineries and related works.

m3

109.86

109.86

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

MSE Wall TYPE B


Green Terramesh
40

Supply and deliver TM 254 GREEN TERRAMESH or


approved equivalent for the construction of
Mechanical Stabilise Earth (MSE) system.

no.

315.78

315.78

41

Install and lay TM 254 GREEN TERRAMESH or


approved equivalent inclusive of 150mm x 225mm
rock ll, labour and others related work within the
MSE wall units. Rate shall include all alignment,
machineries and related works.

m3

101.82

101.82

42

Supply and deliver TM 2754 GREEN TERRAMESH or


approved equivalent for the construction of
Mechanical Stabilise Earth (MSE) system.

no.

345.57

345.57

31

JADUAL PURATA
KADAR HARGA 2014

3.3.6 : GEOTECHNICAL WORK (CLASS G)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

43

Install and lay TM 2754 GREEN TERRAMESH or


approved equivalent inclusive of 150mm x 225mm
rock ll, labour and others related work within the
MSE wall units. Rate shall include all alignment,
machineries and related works.

m3

101.82

101.82

44

Supply and deliver GTM 70 2445 GREEN


TERRAMESH or approved equivalent for the
construction of Mechanical Stabilise Earth (MSE)
system.

no.

377.73

377.73

45

Install and lay GTM 70 2445 GREEN TERRAMESH or


approved equivalent. Rate shall include all
alignment,machineries and related works.

m3

40.45

40.45

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Hydraulic Green MSE Wall


46

Install and lay TM-0.5m thk x. 6m length Toe


Protection Terramesh inclusive of 150mm x
225mm rock ll, labour and others related work
within the MSE wall units. Rate shall include all
alignment, machineries and related works.

m3

109.86

109.86

47

Supply and deliver GTM-0.45m thk. x 5m length 45


Deg Hydraulic Green MSE Terramesh with 10mm
thk. Erosion protection mat & Biomac facing for the
construction of Mechanical Stablise Earth (MSE)
system or equivalent.

no.

316.68

316.68

32

JADUAL PURATA
KADAR HARGA 2014

3.3.6 : GEOTECHNICAL WORK (CLASS G)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

48

Installed and lay GTM-0.45m thk. x 5m length 45


Deg Hydraulic MSE Green Terramesh with
prefabricated with 10mm thk. Erosion protection
mat & Biomac. Rate shall include all alignment,
machineries and related works.

no.

33

KAWASAN
UTARA

KAWASAN
TENGAH

42.09

KAWASAN
TIMUR

KESELURUHAN

42.09

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

PILES
BORED PILES
1000mm Nominal Diameter Bored Pile
1

Drill 1000mm nominal diameter vertical holes


through whatever soil strata other than rock with
provision of temporary casing.

423.76

423.76

Drilled 1000mm nominal diameter vertical holes in


rock.

1,890.00

1,890.00

1000mm Nominal
permanent casing.

1,512.88

1,512.88

High yield reinforcement as specied:


a). Up to 12mm diameter.

3,484.62

3,484.62

b). 16mm diameter and above.

3,476.92

3,476.92

4 nos x 50mm Nominal diameter x 4mm thick wall


mild steel pipe in accordance with the
Specication.

102.86

102.86

Concrete Grade 40/20 as specied.

m3

358.50

358.50

Non-shrink grout Grade 40 to be ll in sonic logging


tubes as specied.

m3

544.00

544.00

Cutting o piles head to required length including


preparing pile head.

no.

333.33

333.33

diameter

12mm

thick

600mm Nominal Diameter Bored Pile


9

Drill 600mm nominal diameter vertical holes


through whatever soil strata other than rock with
provision of temporary casing.

259.55

259.55

10

Drill 600mm nominal diameter vertical holes in


rock

1,021.43

1,021.43

34

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

11

Drill 600mm Nominal diameter x 12mm thick


permanent casing.

12

High yield reinforcement as specied:

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

879.00

879.00

a). Up to 12mm diameter.

3,430.77

3,430.77

b). 16mm diameter and above.

3,430.77

3,430.77

13

50mm Nominal diameter GI pipe attached to main


bar for sonic logging in accordance with the
Specication.

37.75

37.75

14

Concrete Grade 40/20 as specied.

m3

348.41

348.41

15

Non-shrink grout Grade 40 to be ll in sonic logging


tubes as specied.

m3

477.93

477.93

16

Cutting o piles head to required length including


preparing pile head.

276.90

276.90

MICROPILES
300 mm diameter micropiles as working piles.

17

Boring in earth using odex drilling system or


equivalent.

105.78

105.78

18

Boring through rock including natural and existing


concrete.

243.88

243.88

19

Supply and install 267 mm OD x 257 mm diameter


I.D permanent casing.

152.37

152.37

20

High tensile reinforcement straight bars, nominal


diameter not exceeding 40 mm including
supporting reinforcement.

3,442.38

3,442.38

21

Mild steel R6 spiral link at 150mm pitch.

3,389.06

3,389.06

35

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

22

Grouting with non-shrink cement grout Grade C30


as specied into drilled hole including excess
cement required when the grout volume exceeded
the theoretical volume.

m3

757.06

757.06

23

Cut-o piles including preparing heads.

no.

150.00

150.00

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

250 mm diameter micropiles as working piles.

24

Boring in earth, up to 12 m for 40 nos. of pile


points.

101.14

101.14

25

Boring through rock, up to 3 m for 40 nos. of pile


points including natural and articial hard material.

223.28

223.28

26

Supply and install 177.8 mm D x 10 mm thick


Grade N-80 API pipe.

209.37

209.37

27

Supply and install 12mm thk. M.S Stieners welded


API pipe head by 10mm llet weld all round c/w
400mm x 400mm x 25mm thk. M.S. top plate.

no.

318.64

318.64

28

Grouting with non-shrink cement grout Grade C30


as specied into drilled hole including excess
cement required when the grout volume exceeded
the theoretical volume.

m3

623.91

623.91

29

Cut-o piles including preparing heads.

no.

166.92

166.92

36

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

PRECAST REINFORCED CONCRETE PILES (R.C)


Supply
30

Supply 200 x 200mm precast R.C. pile complete


with mild steel pile shoe, of 6m length.

no.

197.89

197.89

31

Supply 200 x 200mm precast R.C. pile complete


with mild steel pile shoe, of 9m length.

no.

329.08

329.08

32

Supply 230 x 230mm precast R.C. pile complete


with mild steel pile shoe, of 6m length.

no.

274.83

274.83

33

Supply 300 x 300mm precast R.C. pile complete


with mild steel pile shoe, of 6m length.

no.

493.80

493.80

34

Supply 300 x 300mm precast R.C. pile complete


with mild steel pile shoe, of 9m length.

no.

740.80

740.80

35

Supply 300 x300mm precast R.C. extension pile


complete with mild steel pile shoe, of 6m length .

no.

491.81

491.81

Handle, Pitch and Drive


36

Driving vertical 200 x 200mm precast R.C. pile


through whatever soil other than rock.

9.50

9.50

37

Driving vertical 230 x 230mm precast R.C. pile


through whatever soil other than rock.

14.00

14.00

38

Driving vertical 230 x 230mm precast R.C. pile


through rock.

21.75

21.75

37

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

39

Driving vertical 300 x 300mm precast R.C. pile


through whatever soil than rock.

12.90

12.90

40

Driving raked piles to the required depth.

11.80

11.80

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Cut O Piles
41

Cut-o 200 x 200mm precast R.C. pile to required


level including preparing pile head.

no.

41.54

41.54

42

Cut-o 230 x 230mm precast R.C. pile to required


level including preparing pile head.

no.

47.38

47.38

43

Cut-o 300 x 300mm precast R.C. pile to required


level including preparing pile head.

no.

51.33

51.33

PRECAST PRESTRESSED CONCRETE PILES


300 mm diameter spun piles (class A) with a working
load of 75 tonne
Supply
44

Supply initial pile with rock shoes (oslo) of 12 m


length.

no.

1,007.13

1,007.13

45

Supply extension pile of 6 m length.

no.

482.50

482.50

23.54

23.54

no.

45.93

45.93

Handle, Pitch and Drive


46

Depth driven.
Jointing, Filling Concrete, Cut O Piles

47

Jointing 300mm dia. of pile with butt weld all


round.

38

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

48

Filling hollow piles with concrete grade C30


including removal of materials from within the piles
before concreting.

80.44

80.44

49

Cut-o piles including preparing heads.

no.

76.69

76.69

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

INTERLOCKING STEEL SHEET PILES


Interlocking Grade 43A steel sheet piles,
O650/730-section , at 66.6 kg/m, section
modulus of 668 cm/m.
50

Supply in 3 m length.

1,173.50

1,173.50

51

Supply in 6 m length.

1,461.00

1,461.00

52

Depth driven.

m2

36.20

36.20

Interlocking Grade 43A steel sheet piles, Z section,


at 66.1 kg/m, section modulus of 1200 cm3/m. To
be installed at places where construction-in-thewet bund construction type will be performed.
53

Supply in 9 m length, double coated.

342.60

342.60

54

Depth driven

m2

53.38

53.38

55

Cut-o piles including preparing heads.

55.75

55.75

56

Supply in 6 m length.

1,070.36

1,070.36

57

Depth driven.

m2

55.00

55.00

58

Cut-o piles including preparing heads.

70.00

70.00

CONCRETE PILES
175 mm G40 square precast reinforced concrete
piles
59

Supply initial piles with rock shoes of 12 m length.

no.

39

321.71

321.71

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

60

Supply extension piles of 6 m length

no.

151.67

151.67

61

Depth driven including handling and pitch

11.24

11.24

62

Cut-o piles including preparing heads.

no.

30.42

30.42

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

200 mm G40 square precast reinforced concrete


piles
63

Supply initial piles with rock shoes of 12 m length.

no.

362.29

362.29

64

Supply extension piles of 9 m length.

no.

284.14

284.14

65

Depth driven including handling and pitch

15.40

15.40

66

Jointing with butt weld all round

no.

31.94

31.94

67

Cut-o piles including preparing heads/ socket

no.

33.37

33.37

250 mm square piles (class A) with a working load


of 95 tonne
68

Supply initial pile with rock shoes (oslo) of 12 m


length.

no.

732.50

732.50

69

Depth driven including handle and pitch

16.06

16.06

70

Cut-o piles. Rate to include preparing heads/


socket

no.

27.78

27.78

300 mm square piles (class A) with a working load


of 140 tonne
71

Supply initial pile with rock shoes (oslo) of 12 m


length. (168 nos.)

no.

934.38

934.38

72

Supply extension pile of 6 m length. (168 nos.)

no.

560.00

560.00

73

Depth driven including handle and pitch

19.15

19.15

40

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

84

Carry out subsequent maintained load test to 2.0


times of maximum working load 800 kN in
accordance with the specication.

no.

12,845.00

12,845.00

85

Carry out subsequent maintained load test to 2.0


times of maximum working load 1000 kN in
accordance with the specication.

no.

16,920.00

16,920.00

86

Carry out subsequent maintained load test to 2.0


times of maximum working load 1200 kN in
accordance with the specication.

no.

15,375.00

15,375.00

87

Carry out subsequent maintained load test to 2.0


times of maximum working load 4400 kN in
accordance with the specication.

no.

45,000.00

45,000.00

88

Carry out subsequent maintained load test to 2.0


times of maximum working load 5500 kN in
accordance with the specication.

no.

50,000.00

50,000.00

89

Carry out integrity test using sonic logging method


in accordance with the specication.

no.

2,306.00

2,306.00

90

Maintained load working test pile up to twice


working load of 30 tons (300mm precast reinforced
concrete piles).

no.

11,000.00

11,000.00

91

Provide a complete set of 5 piling driving and load


test report.

no.

190.00

190.00

42

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

JADUAL PURATA
KADAR HARGA 2014

3.3.7: PILING WORK (CLASS H)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

74

Jointing with butt weld all round

no.

23.50

23.50

75

Cut-o piles including preparing heads/socket.

no.

35.00

35.00

PILE TESTS
76

Carry out pile driving analyser (PDA) in accordance


with the specication.

no.

1,815.66

2,044.16

1,929.91

77

Carry out pile integrity test using impulse response


method in accordance with the specication.

no.

1,169.32

1,178.33

1,173.82

78

Carry out initial maintained load test maximum


load 600kn in accordance with the specication.

no.

13,400.00

13,400.00

79

Carry out initial maintained load test to 2.0 times of


maximum working load 800kN in accordance with
the specication.

no.

17,300.00

17,300.00

80

Carry out initial maintained load test to 2.0 times of


maximum working load 1000kN in accordance with
the specication.

no.

21,000.00

21,000.00

81

Carry out initial maintained load test to 2.0 times of


maximum working load 1200kN in accordance with
the specication.

no.

29,505.00

29,505.00

82

Carry out initial maintained load test to 2.0 times of


maximum working load 4400knN in accordance
with the specication.

no.

75,000.00

75,000.00

83

Carry out initial maintained load test to 2.0 times of


maximum working load 5500kN in accordance with
the specication.

no.

80,000.00

80,000.00

41

JADUAL PURATA
KADAR HARGA 2014

3.3.8: CONCRETE WORK (CLASS I)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

IN SITU CONCRETE DESIGNED MIX


Concrete Grade: C15
1

50 mm thick lean concrete

m2

10.79

13.89

12.34

75 mm thick lean concrete

m2

17.02

16.99

17.01

100 mm thick lean concrete

m2

17.45

17.45

311.11

298.91

Concrete Grade: C30


4

Reinforced concrete base

m3

286.71

Reinforced concrete footings

m3

287.05

287.05

Reinforced concrete slab

m3

285.33

285.33

Reinforced concrete columns

m3

288.30

288.30

Reinforced concrete of beam

m3

288.09

311.11

299.60

Reinforced concrete walls

m3

283.31

311.11

297.21

10

Supply and lay reinforced concrete oor slab


225mm thick Grade 30 at channel bed of all
necessary formwork as shown in the drawings or as
directed by S.O.

m2

64.20

64.20

m2

61.78

61.78

Concrete Lining
11

Supply and lay concrete slab 200mm thick Grade


30 at channel slope and bed as shown in the
drawings or as directed by S.O.

Concrete Grade: C35


12

Reinforced concrete for water control gate base


structure.

m3

303.59

303.59

13

Reinforced concrete for wall water control gate


structure.

m3

302.73

302.73

14

Reinforced concrete for wall structure.

m3

305.45

305.45

43

JADUAL PURATA
KADAR HARGA 2014

3.3.8: CONCRETE WORK (CLASS I)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Concrete Grade: C35A


15

Base

m3

298.66

323.36

311.01

16

Wall

m3

298.66

323.36

311.01

17

Buttress Wall

m3

298.66

298.66

18

Column

m3

298.66

298.66

19

Beam and Slab for Driveway

m3

298.66

298.66

20

Key Wall

m3

298.66

298.66

Concrete Grade: C40


21

Reinforced concrete foundation & Abutments.

m3

338.64

338.64

22

Reinforced concrete piers & cross beams.

m3

338.64

338.64

High Performnce Concrete Grade 40/20 for


23

Deck Slab

m3

338.64

338.64

24

Diaphragms

m3

338.64

338.64

25

RC approach Slab

m3

338.64

338.64

no.

31,500.00

31,500.00

PRECAST CONCRETE
Prestressed post-tensioned beams
26

Supply, loading, unloading in casting yard, transport


and launching 16.0m long high permonce concrete
Pre-tensioned Prestressed M-Beams including
strands, prestressing, grouting and anchorage all in
accordance with the Specication and as shown in
the Drawing.

44

JADUAL PURATA
KADAR HARGA 2014

3.3.8: CONCRETE WORK (CLASS I)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Precast concrete parapets (1.2m) with High


performance
27

Precast concrete parapets (1.2m) with concrete


grade 40 including reinforcement, anchorage,
hooks etc. with ribbed nish as per Drawing.

no.

404.44

404.44

m2

178.98

178.98

66.45

66.45

Concrete Interlocking Blockmat VIP LINER


28

Supply and lay precast interlocking concrete


blockmat 600mm thick VIP LINER or equivalent as
shown in the drawings or as directed by S.O.

Electrical Fitting Trenches cover


29

Precast concrete;730mm(W) x 480mm (L) x 50mm


thick
FORMWORK

30

Class F1 : Rough nish

m2

31.93

30.92

31.42

31

Class F2 : Fair nish

m2

33.57

34.86

34.21

32

Class F3 : Smooth nish

m2

32.91

32.91

REINFORCEMENT
Mild Steel Bars
33

Nominal diameter: 8 mm.

3,172.73

3,172.73

34

Nominal diameter: 10 mm.

3,172.73

3,172.73

High Tensile Bars


35

Nominal diameter: 6 mm.

3,475.74

36

Nominal diameter: 10 mm.

3,389.95

3,234.09

3,312.02

37

Nominal diameter: 12 mm.

3,365.41

3,234.85

3,300.13

45

3,475.74

JADUAL PURATA
KADAR HARGA 2014

3.3.8: CONCRETE WORK (CLASS I)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

38

Nominal diameter: 16 mm.

3,372.16

3,175.46

3,273.81

39

Nominal diameter: 20 mm.

3,349.33

3,192.43

3,270.88

40

Nominal diameter: 25 mm.

3,340.77

3,211.37

3,276.07

41

Nominal diameter: 32 mm.

3,150.00

3,150.00

High Tensile Steel Fabric


42

High tensile steel fabric mesh A393 (A10), 6.16


kg/m2.

m2

20.44

20.44

m2

19.07

19.07

Fabric of Other Stated Material


43

Supply and installed BRC A10


CONCRETE ANCILLARIES
Joints

44

Construction joint.

93.84

93.84

45

Construction joint, 500mm wide.

97.22

97.22

52.82

52.82

128.70

128.37

Contraction joint
46

Concrete Contraction joint (at every 10m)


Expansion joints

47

Expansion joints. Rate to include 25 mm thick resin


bonded cork ller .

128.03

48

Concrete Expansion joint ( at max. 30m)

53.50

53.50

49

Form Expansion joints at Abutment wall & deck


slab.

122.86

122.86

92.48

89.83

Waterstop
50

230 mm wide rubber waterstop including cutting


and jointing of waterstops and provision of special
ttings at angles and junctions.

46

87.19

JADUAL PURATA
KADAR HARGA 2014

3.3.8: CONCRETE WORK (CLASS I)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

ANCILLARY WORK
STRUCTURES

FOR

WATER

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

RETAINING

Water Proong Admixtures


Asphalt
51

One layer of 20 mm thick asphalt laid on sloping


surface area at raft foundation

m2

23.20

23.20

52

One layer of 5 mm thick waterproong membrane


laid on sloping at roof surface area.

m2

46.91

46.91

53

Supply and install 300 wide x 1.5mm thk


waterproong membrane.

m2

47

34.33

34.33

JADUAL PURATA
KADAR HARGA 2014

3.3.9: BRICKWORK, BLOCKWORK & MASONRY (CLASS J)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

75.91

80.24

78.07

KAWASAN
TIMUR

KESELURUHAN

BRICKWORK
1

230 mm thick brickwork laid in stretcher bond,


jointed in 1:3 cement mortar for vertical straight

m2

110 mm thick common brickwork laid in stretcher


bond, jointed in 1:3 cement mortar for vertical
straight walls.

m2

41.15

41.15

m2

12.64

12.64

MISCELLANEOUS WORK
Ancillaries
3

Damp proof courses; to BS 743 Type D.

48

JADUAL PURATA
KADAR HARGA 2014

3.3.10: TIMBER WORK (CLASS K)

KETERANGAN KERJA

UNIT

1150mm High (overall) of Cengal Wood handrailing


to approved pattern and varnish to timber
including all necessary bend, joints, accessories etc.
and all as per detail drawings.

BIL

KAWASAN
UTARA

PURATA KADAR HARGA 2014 (RM)


KAWASAN
KAWASAN
KESELURUHAN
TENGAH
TIMUR

Hand railing
1

49

360.27

360.27

JADUAL PURATA
KADAR HARGA 2014

3.3.11: METALWORK (CLASS L)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

Galvanised iron railing with post and handrail at


parapets complete with and including 16mm
diameter galvanised mild steel bolt bent to 'U'
shape with nuts and washers and two coats of
bituminous paint on base of post as shown in the
Drawing.

Safety Handrail on top of Flood channel Wall as per


detail Drawing.

240.00

Supply and x in place 25mm diameter galvanized


iron Cat Ladder or G.I. Rung for access to river edge
all in accordance with details in Drawings and/or
as directed by the S.O.

no.

1,190.00

Galvanised mild steel ladders; 75 diameter x 12mm


thk. Hot Dip Galvernised G.I stringer with 20 mm
diameter steel rungs at 300 mm centres. Rate to
include full assemblies as shown in Drawing.

no.

3,375.00

3,375.00

Supply, fabricate and install of 2m x 2.2m Trash


Screen (Hot Dip Galvanised M.S. Steel Grating) for
trash screen structure as shown in drawing no.
RTBSL3/RPM/C/ DD/03.

no.

5,759.00

5,759.00

Galvanised mild steel grating cover for [100 kN


load] for sump.

no.

4,520.00

4,520.00

Galvanised mild steel grating cover for [100 kN


load]for pump house.

no.

4,920.00

4,920.00

Galvanised mild steel ladders; [70 x 70 x 10 mm


thick x 10.3 kg/m stringer 400 mm] apart, with [25
mm] diameter steel rungs at [300 mm] centres.
Rate to include full assemblies.

229.00

229.00

50

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

172.50

172.50

160.83

200.42

1,190.00

JADUAL PURATA
KADAR HARGA 2014

3.3.11: METALWORK (CLASS L)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

Supply and x in place 900mm high galvanized iron


posts to Pump Sump Wall including railing,
accessories, etc. all in accordance with details in
Drawings and/or as directed by the S.O.

10

Supply and installed 5mm thick aluminium stick


gauge including all markings, lettering and bolts
and nuts as shown in the drawing

no.

967.10

967.10

11

0.6m long. 25mm diameter Galvanised Dowel Bars


at Pier complete with rubber dowel cap.

no.

31.18

31.18

12

Supply and Install Cat Ladder

13

16mm diameter Galvanised steel Anchor at


approach slab with spacing 300mm c/c.

no.

45.64

45.64

14

Supply and install mild steel grill for window and


door.

m2

211.59

211.59

51

KAWASAN
UTARA

KAWASAN
TENGAH

255.00

KAWASAN
TIMUR

KESELURUHAN
255.00

504.00

504.00

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

ROOFING WORK
Roof Structure
1

Proprietary roofting system shall be deemed to be


roofting system and components to be design by
contractor
(Metal
Roof
Truss
system).
Approximate area of 45 m2.

Item

5,469.79

5,469.79

200mm x 25mm Thick wrought pressure-treated


Group 'B' timber as described fascia board
including one (1) undercoat and two (2) nishing
coats of gloss enamel paint as described.

31.66

31.66

200mm x 15mm Thick wrought pressure-treated


Group 'B' timber as described gable end including
one (1) undercoat and two (2) nishing coats of
gloss enamel paint as described.

m2

70.00

70.00

Roof Covering
4

Interlocking concrete roong tiles laid to 25


degrees to the horizontal as shown in Drawing
including preparing surfaces, forming joints,
overlaps, mitres, angles, llets, built-up edges,
and laying to falls or cambers, cutting, notching,
bending, and bedding.

m2

Approved 'Monier' sunburn red concrete roof tiles


at 25 degree laid to pitch roong structure
(measured separately) and jointed strictly in
accordance with manufacturer's instructions and
including all necessary apex tiles, ridge, hip, valley
and end caps jointed in waterproong coloured
cement mortar (1:3) as described (measure at on
plan)

m2

Roong 25mm thk polycarbonate at sheet laid at


14 Degree to the horizontal as shown in the
Drawing No DNA/RS/12/ 053/PP/PS/HO/18

m2

52

49.00

49.00

50.44

262.50

50.44

262.50

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

50 mm thick berglass insulation including


preparing surfaces, forming joints, overlaps,
mitres, angles, llets, built-up edges, and laying to
falls or cambers, cutting, notching, bending and
bedding.

m2

Double sided 'Delta Foil' or other equivalent

m2

8.85

8.85

50mm Thick bre glass wool insulation laid on


roof trusses and including chicken wire mesh

m2

10.85

10.85

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Insulation
16.82

16.82

Gutters and Downpipes


10

100 mm diameter uPVC rain water down pipes.

36.84

36.84

11

100 mm diameter uPVC elbow for rain water


down pipes.

no.

35.91

35.91

no.

599.68

599.68

WINDOWS AND DOORS

12

DOORS
Timber
Single leaf solid timber door 900 mm 2100 mm
type waterproong as supplied by manufacturer
as shown in Drawing No. ETTKT/RPM/A/CH1/02

13

Supply and install 950mm x 2100mm x 40mm


thick single leaf internal laminated ush door
panel with 1.0mm thick GI Frames and approved
ironmongery, jointing materials and other
accessories and including approved timber and
metal paint nish to all exposed surfaces.

no.

621.61

621.61

14

Supply and install 750mm x 2100mm x 40mm


thick single leaf internal laminated ush door
panel with 1.0mm thick GI Frames and approved
ironmongery, jointing materials and other
accessories and including approved timber and
metal paint nish to all exposed surfaces.

no.

540.96

540.96

53

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

15

Supply and install 900mm x 2100mm x 40mm


thick single leaf solid hardwood (Grade B) door
panel with 1.0mm thick GI Frames and approved
ironmongery, jointing materials and other
accessories and including approved timber and
metal paint nish to all exposed surfaces.

no.

686.73

686.73

16

Single leaf plywood ush door type ush door.

no.

342.73

342.73

17

Grade A, 2100 mm x 900 mm timber doors


frames.

no.

437.27

437.27

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Metal
18

Supply and install 2500 mm x 2500 mm manual


roller shutter door complete with rollers, guide,
pelmet, and locks; as shown in Drawing.

no.

3,827.27

3,827.27

19

Supply and install 2500 mm x 1750 mm manual


roller shutter door complete with rollers, guide,
pelmet, and locks; as shown in Drawing.

no.

2,968.18

2,968.18

20

Natural anodised aluminium door frames 2100


mm 1700 mm as shown in Drawing.

No.

738.20

738.20

Windows
21

Natural anodised aluminium side hung casement


window 1800 mm 1650 mm complete with 6
mm thick clear oat glass as shown in Drawing
No. ETTKT/RPM/A/CH1/02

No.

753.09

753.09

22

Natural anodised aluminium frame to suit size


2100 mm 1700 mm as shown in Drawing
ETTKT/RPM/A/CH1/02

No.

979.03

979.03

54

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Ironmongeries
31

Pair of stainless steel hinges;75 mm x 50 mm.

no.

40.27

40.27

32

Pair of stainless steel butt hinges;100 mm x 75


mm.

no.

38.55

38.55

33

Cylindrical knobset with stainless steel nish.

no.

96.82

96.82

34

Half deadbolt.

no.

33.11

33.11

35

Door closers, 140 mm x 22 mm

no.

139.55

139.55

FINISHES
Floor Finishes
36

Homogeneous tiles 300 mm 300 mm 7.6 mm


including cement mortar screed.

m2

71.96

37

25 mm thick cement and sand pavings to oor.

m2

18.83

38

25 mm thick cement and sand pavings 1:3 to


apron.

m2

39

Supply and apply sand pebble wash as nising for


exposed surface with Architect's Specications.

m2

71.96

17.91

18.37

17.45

17.45

95.20

95.20

Wall Finishes
40

19mm thick cement and sand (1:6) mixed with


and approved plasticiser with wooden oat at
plainface walls, beams, columns and the likes.

m2

16.42

16.42

41

Glazed wall tiles tiles; 200mm x 200mm x 8.5 mm


thick including cement mortar screed for toilet
and shower slab nishes.

m2

72.04

72.04

56

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Supply and x the following in approved brown


anodised aluminium casement windows and
frames fabricated from extruded section, glazed
with and including 5mm thick clear glass with
glazing gasket complete with all necessary
ironmongeries and other accessories including
building in or cutting and priming, bedding frames
in cement mortar (1:3) and pointed internally with
an approved tropical mastic and externally with
and approved silicon sealant caulking accordance
with manufacturer's instruction etc.
23

1800mm x 1200mm High (overall size) xed glass


window comprise of 2 Nos x 900mm x 1200mm
High equal panel c/w opening as per drawings.

no.

640.47

640.47

24

1200mm x 1200mm High (overall size) casement


window comprise of 2 Nos x 600mm x 1200mm
High equal panel.

no.

407.66

407.66

25

1200mm x 600mm High (overall size) top hung


window comprise of 2 Nos x 600mm x 600mm
High equal panel.

no.

281.29

281.29

26

600mm x 600mm High (overall size) top hung


window.

no.

169.62

169.62

27

1150 mm x 1800 mm natural anodised aluminium


side hung casement window complete with 6 mm
thick clear oat glass as shown in Drawing.

no.

696.35

696.35

28

Grade A timber windows; 500 mm x 600 mm


tted with standard sill and complete with 6 mm
thick oat glass louvers and 10 mm security bar as
shown in Drawing.

no.

191.45

191.45

29

Grade A timber windows; 1150 mm x 1800 mm


tted with standard sill and complete with 6 mm
thick clear oat glass side hung casement window.

no.

677.21

677.21

30

Supply and x anti-vermin netting on outside to


window.

no.

117.27

143.58

55

169.88

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

42

Approved glazed ceramic wall and oor tiles


including border tiles as described bedded, jointed
and pointed in match coloured cement lining on
20mm Thick cement and sand (1:3) screed and
laid in approved pattern as described all as per
S.O's satisfaction.

m2

83.05

83.05

43

Non-slip ceramic tiles; 200mm x 200mm x 7 mm


thick including cement mortar screed for toilet
wall nishes.

m2

68.40

68.40

44

Articial timber wall cladding (Shera splendid wall


plank or equivalent) x to external wall including
framing, all accordance to manufacturers detail.

m2

131.20

131.20

m2

46.75

46.75

Item

7,809.10

7,809.10

no.

1,703.63

1,703.63

Set

1,040.21

1,040.21

Item

7,717.27

7,717.27

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Ceiling Finishes
45

600mm x 1200mm x 3.2mm Thick 'UAC' superex


or other equal and approved suspended non
asbestos sheet not exceeding 3.50m including
light through, at necessary joints anti up lift insert
rod on timber frame xed in accordance to
manufacturer's instructions all as per S.O's
satisfaction.
PLUMBING WORK

46

47

48

49

Cold Water Plumbing System


Cold water plumbing system as shown
schematically in Drawing and including all ttings,
stop-cocks, basin and taps.
Water Storage Tank
1500 litres HDPE water storage tank as per
Specication for Water Supply Plumbing, Sanitary,
& Rainwater Goods Installation and including
supporting frame.
150 gallons Polytank c/w support and all
accessories
Sanitary Plumbing System
Sanitary plumbing system as per specication and
including all ttings.

57

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Sanitary Appliances
Supply and x the following 'Inax' or other equal
and approved sanitary ttings and accessories
including storing, assembling, bedding, plugging
and screwing with matching screws, cutting and
pinning or building in pinning or building in
brackets, jointing and connecting to services and
to soil and waste pipes and making and making
good all works disturbed all as per manufacturer's
specications :50

Pedestal water closet with 'P' or 'S' trap complete


with seat cover and top inlet 6 litres manual ush
valve and all other necessary accessories

no.

779.69

779.69

51

Back inlet squatting water closet complete with


high level UPVC cistern and pull chain, concealed
'P' or 'S' trap, tting, ush pipe, xing bracket for
cistern and all other accessories

no.

479.58

479.58

52

Padestal water closet with low tank for wheel


chair users (OKU) with 'P' or 'S' trap complete with
seat cover and top inlet 6 litres manual ush
valve, handicapped grab bar and all other
necessary accessories for OKU

no.

925.75

925.75

53

Wash hand basin (wall hung) with lever handle


pillar tap and all necessary accessories to S.O's
approval

no.

293.72

293.72

54

Semi-recessed wash hand basin c/w pillar tap and


all necessary accessories to S.O's approval

no.

242.27

242.27

55

Stainless steel oor trap with approved


waterproof compound cement grout as per
manufacturer's specications

no.

47.53

47.53

56

Chrome plated bib tap (DOE or equivalent)

no.

58.82

58.82

58

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

57

Water closets; Claytan 404 or approved


equivalent 6-litre single ush side lever, bottom
inlet overow cistern with apper valve internal
ttings including medium duty plastic seat and
cover.

no.

450.00

450.00

Item

3,600.77

3,600.77

no.

7,363.64

7,363.64

58

59

Septic Tank
Design, supply, deliver, unload, install and
construct septic tank of 5 PE, all as per
manufacturer's specication including piling
works, reinforced concrete structure, nishes,
mechanical and electrical works, plumbing,
external works within compound and testing
commissioning, spare parts, nal inspection
chamber etc. all as per manufacturer's
specications and approved by JPP (contractor
shall submit detail drawings and specications for
approval and pay all fee in relation therewith)(
Deemed to include stand pipe )

Septic tank for ve population equivalent (5 PE)


with a minimum of 24 hours of hydraulic
retention time and a dual size aggregate down
ow lter media including foundation, excavation,
upholding sides of excavation, bedding,
installation,backlling and all other related works
where expressly required.

59

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

JADUAL PURATA
KADAR HARGA 2014

3.3.12:

BUILDING WORK (CLASS M)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

TNB SUB-STATION
60

61

Construct and complete TNB Substation of overall


size of 7.7m (L) x 5.1 m(W) x 4m (H) generally of
reinforced concrete foundations, slab, ramp and
apron on hardcore, reinforced concrete frame and
RC at roof and gutter, brickwall with plaster and
paint externally and internally, painting to o
form ceiling and beam, plywood ush door, FRP
louvered doors and windows with anti-vermin
netting, approved waterproong system to RC at
roof and gutter,anti-termite /pest control, UPVC
downpipes with cement render oor nished with
and including all necessary excavation,
reinforcements, formwork, hardware, painting
and supply and x of sanitary wares and ttings as
per Drawings and Specications.(excluding piling
works)

PLANT SWITCH ROOM


Construct and complete Control House overall
size of 8.65 m (L) x 4.0 m(W) x 4m (H) constructed
generally of reinforced concrete foundations, slab,
ramp and apron on hardcore, reinforced concrete
frame and RC at roof and gutter, brickwall with
plaster and paint externally and internally,
painting to o form ceiling and beam, plywood
ush door, FRP louvered doors and windows with
anti-vermin netting, approved waterproong
system to RC at roof and gutter,anti-termite
/pest control, UPVC downpipes with cement
render oor nished with and including all
necessary excavation, reinforcement, formwork,
hardware, painting and supply and x of sanitary
wares and ttings as per Drawings and
Specications.(not include piling works)

no.

69,100.00

69,100.00

no.

64,000.00

64,000.00

60

JADUAL PURATA
KADAR HARGA 2014

3.3.13:

PAINTING WORK (CLASS N)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

m2

36.43

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

EPOXY OR POLYURETHANE PAINT


Metal Surfaces
1

Prepare and apply [one] coat of base primer and


two coats of epoxy paint externally to: Metal
surfaces other than pipework.(both sides)

36.43

OIL PAINT
Application of protective coating to bridge
structure
2

a). One layer of primer and two layers of top coat


inclusive of surface preparation to all exposed
surfaces of beams, diaphragms and parapets.

m2

16.78

16.78

b). One layer of primer and two layers of top coat


inclusive of surface preparation to all exposed
surfaces of abutments and piers above water.

m2

16.62

16.62

c). Two layers of epoxy coating inclusive of surface


preparation to all exposed underwater surfaces of
abutments and piers.

m2

30.00

30.00

EMULSION PAINT / ACRYLIC PAINT


5

Prepare and apply one coat of sealer and two coats


of acrylic paint to buttress wall, column and slab.

m2

9.65

Prepare and apply one coat of base primer and two


coats of emulsion paint to smooth plastered
surfaces of internal and external walls, columns
exceeding 300 mm girth.

m2

16.13

Prepare and apply one coat sealer and two coats of


'ICI' or other equal and approved acrylic weather
shield paint at plastered surfaces of walls, beams,
columns and the likes.

m2

61

9.65

13.70

14.92

12.12

12.12

JADUAL PURATA
KADAR HARGA 2014

3.3.14: PIPEWORKS (CLASS O)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

TRENCH EXCAVATION
In Earth
Trench excavation shall be deemed to include
preparation of surfaces, excavation for bedding,
multiple handling, disposal of surplus excavated
material (including unsuitable material), upholding
sides of excavation, allowance for working space,
backlling, removal of dead services, and
reinstatement of original surface unless covered by
separate items.

Excavation for Chambers


1

In earth for electrical ttings in 750mm (W) X


750mm (H)

m3

15.00

15.00

72.73

72.73

Electrical Fitting Tranches cover


2

Precast concrete;730mm(W) x 480mm (L) x 50mm


thick

PIPES
Supply and lay in position 150mm dia ABS
underdrain pipe including all necessary cutting and
geotextile wrapping.

80.44

80.44

High density polyethylene (HDPE) solid wall plain


ended pipe to MS 1058 for the following:

100 mm OD, PE 80, PN 16 in standard length of 2m.

62

55.36

55.36

JADUAL PURATA
KADAR HARGA 2014

3.3.14: PIPEWORKS (CLASS O)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

no.

1,700.00

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Spigot socket ended ductile iron pipes to BS EN


545, with metallic zinc and bitumen external
coating and cement mortar lined internally for the
contruction of 2 culverts underneath the
maintenance road at the saddle dyke. Rate to
include supply and making joints complete for the
following:
4

300 mm DN in standard length of 6 m.

1,700.00

Sluice Gate
5

Supply, deliver, install, test and commissioning the


1.5m x 1.5m ROWAT HDPE/SS 304 Sluice Gate of
non rising spindle including xing materials come
with stainless steel XSV spindle extension, HDPE
XBV pedestal and handwheel XHW80. Design
hydrostatic pressure at 5m. Detail as per drawing
(RTBSL3/RPM/C/OS/05).

no.

16,350.00

16,350.00

Weephole
6

Supply and install minimum 75mm dia PVC pipe


weepholes inclusive of graded aggregate lter
layer and geosynthetics fabric as shown in
Drawings or as directed by S.O.

no.

14.70

14.70

Supply and install minimum 75mm dia PVC pipe


weepholes at 3 m c/c inclusive of graded
aggregate lter layer and geosynthetics fabric as
shown in Drawings or as directed by S.O

no.

14.70

14.70

150mm diameter porous concrete pipes wrapped


around with Type FS 68 geotextile behind walls of
culverts.

56.74

56.74

63

JADUAL PURATA
KADAR HARGA 2014

3.3.15: DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

DRAIN EXCAVATION
Drain excavation shall be deemed to include
preparation of surfaces, double handling, disposal
of surplus excavated material, upholding sides of
excavation, allowance for joints, backlling, and
removal of dead services and reinstatement of
Original Surface unless covered by separate items.

In earth for 600 mm precast concrete block drain,


depth not exceeding 1.5 m.

17.00

17.00

In earth for 230 mm precast concrete block drain


depth not exceeding 1.5 m.

8.92

8.92

In earth for cascading drain as shown in Drawing


concrete block drain, depth not exceeding 1.5 m.

9.34

9.34

In earth for U-drain A1 (1500 mm by 1200 mm) not


exceeding 3.0 m.

17.68

17.68

In earth for U-drain A2 (2100 mm by 2100 mm) not


exceeding 3.0 m.

18.68

18.68

In earth for U-drain A3 (2700 mm by 2400 mm) not


exceeding 3.0 m.

20.50

20.50

In earth for U-drain A4 (2700 mm by 2400 mm) not


exceeding 3.0 m.

20.03

20.03

In earth for U-drain B1 (3600 mm by 3000 mm) not


exceeding 3.0 m.

31.15

31.15

In earth for U-drain B2 (3600 mm by 3600 mm) not


exceeding 3.0 m.

34.65

34.65

10

In earth for U-drain C1 (2700 mm by 2400 mm) not


exceeding 3.0 m.

21.50

21.50

11

In earth for U-drain C2 (2400 mm by 2400 mm) not


exceeding 3.0 m.

18.68

18.68

64

JADUAL PURATA
KADAR HARGA 2014

3.3.15: DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Perimeter Earth Drain


12

Excavation of new trapezoidal shaped collector


earth drain of depth not exceed 1m to the required
level and prole include all necessary trimming and
compaction.

m3

5.80

5.80

Excavation for Concrete Drain Sumps and Culverts

13

In earth for concrete drain, depth 1.2 m.

m3

5.88

5.88

14

In earth for 1800 mm x 1800 mm brick sump.

m3

6.08

6.08

15

In earth for 900mm pipe culvert depth 1.5 - 2.0 m

5.83

5.83

302.50

302.50

SURFACE DRAINS
Item for surface drains shall be deemed to include
cement jointing, sand and concrete beddings,
shuttering, struts, and weep holes.
16

1000 mm wide cast insitu concrete drain with


average 1000 mm high.

17

Precast concrete saucer drain for small run-o for


the connection road from Jalan Lencongan Barat
Timah Tasoh.

77.02

77.02

18

230 mm precast concrete block drain for the


perimeter drain.

46.67

46.67

19

Cascade drain cum 500mm x 500 mm sump;


reinforced concrete grade 30 as shown in Drawing.

105.00

105.00

65

JADUAL PURATA
KADAR HARGA 2014

3.3.15: DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

20

Roadside drain; 600 mm wide block drain with


average 900 mm high brick wall and plastering
including 600 mm x 100 mm x 100 mm precast
concrete struts at 6 m c/c.

348.91

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN
348.91

Roadside Drain constructed of plastered brickwall


on concrete bedding. Mass concrete Grade 25/20
concrete, weepholes, RC struts, excavation,and
disposal of surplus excavated materials from site.

21

Construct 450mm dia. Block Drain with plastered


brickwall width 500mm and depth not exceeding
200mm.

94.50

94.50

27.17

27.17

72.48

72.48

Embankment Shoulder Drain


Insitu reinforced concrete Class 25/20 in Drains at
any inclination including joints, stepping,
excavation reinforcement, formwork where
necessary, backlling and disposal of surplus
material.
22

175 mm invert wide, 175mm deep.


Collector Drain along River Bund Embankment
Insitu reinforced concrete Class 25/20 in Drains at
any inclination including joints, stepping,
excavation reinforcement, formwork where
necessary, backlling and disposal of surplus
material.

23

400mm invert width, 500mm deep.


DRAINAGE SYSTEM

24

150mm Diameter x 350mm long UPVC Class D


downpipe at 3000mm centres as shown in the
Drawing.

no.

32.63

32.63

25

Mild steel grating, overall size 550mm x 330mm, as


shown in the Drawing.

no.

256.10

256.10

68.06

68.06

SUB-SOIL
26

150mm Dia UPVC perforated drainage pipe.

66

JADUAL PURATA
KADAR HARGA 2014

3.3.15: DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

NEHEMIAH WALL
To supply & lay drainage blanket (thick 300mm) behind Nehemiah wall panel.
27

Supply & lay 20mm single size aggregate.

m3

85.00

85.00

28

Supply & lay lter geotextile.

m2

14.60

14.60

To supply & lay drainage blanket (thick 300mm) behind of anchor blocks.
29

Supply & lay 20mm single size aggregate.

m3

85.00

85.00

30

Supply & lay lter geotextile.

m2

14.60

14.60

31

Supply & lay 100mm dia Perforated HDPE pipe


wrapped with lter geotextile.

30.00

30.00

no.

5,336.36

5,336.36

Local Drainage Outlet


32

To construct Grade 30; R.C outlet discharge


wingwall c/w formwork and reinforcement at the
outlet discharge point.Rate to include excavation
and backll.

67

JADUAL PURATA
KADAR HARGA 2014

3.3.15: DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

CULVERTS
Item for culverts shall be deemed to include all
joints, water stop, reinforced concrete base, and
concrete surround unless otherwise stated.

33

900 mm diameter single precast concrete pipe


culvert, Class Z.

336.67

336.67

34

1500 mm diameter precast concrete pipe culvert,


Class Z in standard length of 3 m with spigot joint
and socket.

789.50

789.50

Precast Box Culvert


35

Box culvert A1 - 1500 mm x 1200 mm.

800.87

800.87

36

Box culvert A2 - 2100 mm x 2100 mm.

1,446.67

1,446.67

37

Box culvert A3 - 2700 mm x 2400 mm.

2,359.94

2,359.94

38

Box culvert A4 - 2700 mm x 2400 mm.

2,359.94

2,359.94

39

Box culvert B1 - 3600 mm x 3000 mm.

3,720.94

3,720.94

40

Box culvert B2 - 3600 mm x 3600 mm.

3,711.50

3,711.50

41

Box culvert C1 - 2700 mm x 2400 mm.

2,547.94

2,547.94

42

Box culvert C2 - 2400 mm x 2400 mm.

2,203.76

2,203.76

Precast U-Drain
43

U-drain A1 - 1500 mm x 1200 mm.

371.21

371.21

44

U-drain A2 - 2100 mm x 2100 mm.

786.43

786.43

45

U-drain A3 - 2700 mm x 2400 mm.

1,148.25

1,148.25

46

U-drain A4 - 2700 mm x 2400 mm.

1,147.00

1,147.00

47

U-drain B1 - 3600 mm x 3000 mm.

1,801.64

1,801.64

48

U-drain B2 - 3600 mm x 3600 mm.

2,141.71

2,141.71

68

JADUAL PURATA
KADAR HARGA 2014

3.3.15: DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

49

U-drain C1 - 2700 mm x 2400 mm.

1,161.25

1,161.25

50

U-drain C2 - 2400 mm x 2400 mm.

1,132.67

1,132.67

Precast Concrete Single Pipe Culvert


Supply and install Precast Reinforced Concrete Pipe
Culvert including spigot and socket jointing with
rubble ring and sand bedding, excavation,
backlling and disposal of surplus excavated
materials from site.
51

900mm diameter

236.67

236.67

Culvert Inlet / Outlet Structures


900mm diameter
52

(i). Excavation for structure commensing from


existing ground surface to a depth as per drawing
and dispose at contractor dumpsite.

m3

6.51

6.51

53

(ii) 50mm thick lean concrete Grade 15/10

m2

12.31

12.31

54
55
56

(iii) Cast In-Situ Concrete Grade 25 :


a. Base
b. Wall
c. Key Beam at wingwall

m3
m3
m3

279.89
281.05
281.43

279.89
281.05
281.43

57
58

(iv) Bar and Helical Reinforcement :


a. Up to 12mm diameter.
b. 16mm diameter and above.

t
t

3,430.77
3,423.08

3,430.77
3,423.08

59

(v) Formwork :
a. Class F3

m2

42.63

42.63

69

JADUAL PURATA
KADAR HARGA 2014

3.3.16:

ROADS AND PAVINGS (CLASS Q)

PURATA KADAR HARGA 2014 (RM)


KETERANGAN KERJA

BIL

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

SUBGRADE PREPARATION
1

Earth material to receive road pavement including


scarifying, levelling, and compaction of the top 300
mm of the subgrade to the specication.

m2

5.75

5.75

Stripping : topsoil average depth 500mm thick :


remove surplus from site.

m2

5.10

5.10

Preparation of formation level.

m2

1.13

1.13

6.01

6.01

SUB-BASE
4

Granular material with a CBR value of more than


30, complying with Specication clause 13008 in
100 mm thick to road.

m2

Granular (sand) material with a CBR value of more


than 30, complying with Specication in 50 mm
thick.

m2

Sub-base; 100mm thick sand.

m2

6.50

6.50

200mm thick Sub-base (CBR > 30%).

m2

9.05

9.05

400mm thick Sub-base (CBR > 30%).

m2

18.40

18.40

200mm thick crushed aggregate Roadbase. (CBR >


80%).

m2

11.94

11.94

10

200mm thick crushed aggregate Roadbase. (CBR >


80%).

m3

58.57

58.57

11

Crushed aggregates with a CBR value of more than


80, complying with Specication clause 13011 in
250 mm thick.

m2

18.66

18.66

12

Crushed aggregates with a CBR value of more than


80, complying with Specication in 300 mm thick.

m2

23.44

21.42

13

400mm thick crushed aggregate Roadbase. (CBR >


80%).

m2

23.56

23.56

71

3.37

19.40

3.37

JADUAL PURATA
KADAR HARGA 2014

3.3.15: DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

Supply, deliver, install, test and commissioning the


1.5m x 1.5m ROWAT HDPE/SS 304 Sluice Gate of
non rising spindle including xing materials come
with stainless steel XSV spindle extension, HDPE
XBV pedestal and handwheel XHW80. Design
hydrostatic pressure at 5m.

no.

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Sluice Gate
60

16,350.00

16,350.00

SUMPS
Item for sumps shall be deemed to include sand
and concrete bedding, cement plastering, and
metalwork.
61

Bricks sumps; 900 mm x 900 mm x 1.20 m deep


including mild steel grating cover for 100 kN load

no.

62

Bricks sumps; 1800 mm x 1800 mm x 1.50 m deep.

no.

1,031.86

1,031.86

1,621.79

1,621.79

OTHER
63

Construction of V-notch weir . Rate to include all


formworks, reinforcements, concrete, connections
and any other works related to the construction of
the V-notch weir.

no.

70

2,912.00

2,912.00

JADUAL PURATA
KADAR HARGA 2014

3.3.16:

ROADS AND PAVINGS (CLASS Q)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

m2

16.76

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Compacted Gravel Road


14

Construction of a compacted gravel road for


maintenance access at the upstream toe of the
dam wall. The compacted gravel road will be
approximately 3.5 m wide. 200 mm top soil will be
stripped and roadbase material will be tipped and
compacted at grade. (subgrade thickness of 200
mm from Contractor's source)

16.76

ROADBASE
Stabilised roadbase
15

100mm stabilised base (CBR > 80%)

m2

6.68

6.68

ROAD SHOULDER
16

Earth shoulder 500 mm thick compacted laterite


soil (or equivalent) as per Specication.

m2

11.20

11.20

m2

1.41

1.98

1.69

1.47

2.62

2.04

1.43

1.43

SURFACING
Tack Coat
17

Surfacing; Tack coat; bituminous top of crusher run


base
Prime Coat

18

Prime coat to be applied at a rate of 0.35 litres per


square metre as per Specication

m2

19

Bituminous prime coat SS-1 or SS-1K.

m2

72

JADUAL PURATA
KADAR HARGA 2014

3.3.16:

ROADS AND PAVINGS (CLASS Q)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Asphaltic Concrete
20

Surfacing; Asphaltic concrete; 50mm thick binder


course

m2

21

Surfacing; Asphaltic concrete; 50mm thick wearing


course

m2

22

60mm thick asphaltic concrete binder course

m2

23

65 mm thick binder course.

m2

24

70mm thick asphaltic concrete binder course ACB


28.

m2

30.80

30.80

m2

32.75

32.75

m2

78.82

78.82

24.22

22.06

22.06

25.78

25.00

29.99

29.99

29.91

29.91

Dense Bituminous Macadam


25

80mm thick dense bituminous macadam DBM 40

CONCRETE PAVEMENT
26

Precast interlocking concrete blocks of 200mm x


100mm x 80mm thick.

KERBS, CHANNEL, AND EDGINGS


Precast Concrete Kerbs
27

Precast concrete kerbs, Type I as shown in the


Drawing

28

Median kerbs type SM2; precast concrete L-shape


prole; including insitu concrete beds and
haunchings all as per drawing.

34.19

34.19

35.72

35.72

Concrete Edgings
29

Concrete edgings of 150 mm x 100 mm high

73

29.37

29.37

JADUAL PURATA
KADAR HARGA 2014

3.3.16:

ROADS AND PAVINGS (CLASS Q)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

40.29

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Concrete Channels
30

Concrete channels, Type A as shown in Drawing

40.29

ROAD FURNITURES
Signage
Supply, deliver and install trac signboards as
shown in the drawings.
31

WD 24 (Caution).

no.

338.06

338.06

32

Supply, deliver and install JPS standard river signs


as shown in the drawings.

no.

432.83

432.83

Pavement Markings
33

150 mm wide discontinuous line centre line

6.18

6.18

34

150 mm wide continuous line edge line

6.38

6.38

Road Markings
Prepare and apply hot spray thermoplastic road
marking paint:
35

Centre line/lane line 1000mm intermittent 100mm


wide.

3.15

3.15

36

Continuous edge line/channelising line 150mm


wide.

2.95

2.95

37

Double line in double continuous 100mm wide .

3.29

3.29

38

Giveway line 200mm wide intermittent.

3.25

3.25

Trac Barrier
39

Single mounted corrugated steel beam guardrail


with post at 3.8 m spacing inclusive of delineators.
Rate to include bolts, nuts, posts, and other
ancillary work.

74

272.33

272.33

JADUAL PURATA
KADAR HARGA 2014

3.3.16:

ROADS AND PAVINGS (CLASS Q)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

Supply, deliver and install single face guardrails


inclusive of galvanise steel posts, washers, nuts,
delineators and accessories; all in accordance with
specications and drawings.

253.14

253.14

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

Guardrails
40

Testing
41

To carry out CBR test for the SUBBASE in


accordance to BS 1377 including sampling, material
testing and reporting.

no.

170.60

170.60

42

To carry out Gradation test for the ROADBASE in


accordance to BS 1377 including sampling, material
testing and reporting.

no.

137.00

137.00

43

The contractor shall cut core samples of not less


100 mm nominal diameter at locations selected by
S.O. The core sample shall be used by the S.O to
determine the thickness of the compacted layer of
mix & compacted density of the mix. Test shall be
inaccordance to ASTM Test Method D 1188 or
ASTM Test Method D 2726,whichever is applicable.

no.

113.56

113.56

75

JADUAL PURATA
KADAR HARGA 2014

3.3.17: MISCELLANEOUS WORKS (CLASS T)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

FENCES
Items for fences shall be deemed to include
excavation, preparation of surfaces, disposal of
excavated material, upholding sides of excavation,
backlling, concrete, formwork, reinforcement, and
all posts and foundation.
1

3 mm diameter PVC-coated galvanised mild steel


wire of 50 mm square mesh, 2.0 m overall height
chain link fencing complete with post at 3 m
centres as shown in Drawing including all posts,
raked angle, straining wires, barb wires, concrete
kerbs, and foundations.

3 mm diameter PVC-coated galvanised mild steel


wire of 50 mm square mesh, 3.0m overall height
chain link fencing complete with post including 1.0m
walls as shown in Drawing .

To supply and install concrete bollard 300mm dia. x


800mm height complete with all necessary
accessories.

no

78.50

204.17

78.50

204.17

236.14

236.14

Item for anti cut and anti climb fence shall be


deemed to include all posts, raked angle, straining
wires, barb wires, kerbs where applicable and their
4

Welded mesh panel, 4.5 mm wire diameter with


100 (W) mm by 15 (H) mm mesh or approved
equivalent, installed at 2.5 m high with G.I. pole at
2 m spacing bared into ground footing. Ground
footing to be reinforced concrete ground beam 100
mm (H) by 150 mm (W) using T12 steel bars and T6
links. Bared wires place at top of fence (refer
Drawing).

Reconstruct Fence Adjacent To Pulapol Boundary,


3.0m height anti climb fence.

76

329.52

329.52

355.91

355.91

JADUAL PURATA
KADAR HARGA 2014

3.3.17: MISCELLANEOUS WORKS (CLASS T)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

3 mm diameter PVC-coated galvanised mild steel


wire of 50 mm square mesh, 3.0 m wide x 2.5 m
overall height double leaf chain link gate with 60.3
mm OD x 5 mm thick circular hollow section as
frame as shown in Drawing including all posts,
hinges, bolts, lock plates, angle braces, barb wires,
all necessary welding and foundations.

no.

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

GATES
6

3,926.79

3,926.79

Items for gates shall be deemed to include


excavation, preparation of surfaces, disposal of
excavated material, upholding sides of excavation,
backlling, concrete, formwork, reinforcement,
posts and foundations, hinges, bolts,hollow section,
rollers, lockplates, and all necessary welding.

Sliding gate as shown in the drawing.

no.

8,375.00

8,375.00

Double leaf mild steel gate 4500 mm x 3000 mm


high, consisting of 50 x 30 x 3.2 mm thick
rectangular hollow section as frame welded 30 x 30
x 2.6 mm thick square hollow section; including
painting, ironmongery; xing with hinges on lugs
built in masonry backing as shown in Drawing.

no.

6,300.00

6,300.00

INSTRUMENTATION
9
10
11

To provide and installed:


a) Rod Settlement Gauges
b) Surface settlement marker
c) Inclinometer

no.
no.
no.

554.17
471.67
1,274.00

554.17
471.67
1,274.00

12

Provide all labour, equipments, tools, material,


transport and whatever necessary to carry out the
monitoring works at the frequency of once a
month at the instruments location below.

no.

500.00

500.00

13

Provide 4 copies of the monthly monitoring report.

no.

500.00

500.00

77

JADUAL PURATA
KADAR HARGA 2014

3.3.17: MISCELLANEOUS WORKS (CLASS T)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

14

To provide manpower and transport to carry out


monitoring works, process and transfer data.

trips

15

Piezometer as per Specication and as shown in


Drawing. Rate to include pre-boring, installation
and development of piezometer.

no.

15,297.33

15,297.33

16

Monitoring of instrument for the above instrument


at the project site by Specialist as per Specication.
Rate to include preparation of monitoring report to
be submitted on a monthly basis.

no.

4,433.33

4,433.33

KAWASAN
UTARA

KAWASAN
TENGAH
492.50

KAWASAN
TIMUR

KESELURUHAN
492.50

BEARING PADS
LAMINATED ELASTOMERIC BEARINGS

17

18

19

20

Laminated Elastomeric Bearings (Fixed)


475mm x 475mm x 45mm thick Laminated
Elastomeric bearings on minimum 25mm thick
epoxy resin mortar Grade 70 in accordance with
the Specication and as shown in Drawing.

400mm x 300mm x 60mm thick Laminated


Elastomeric bearings on minimum 25mm thick
epoxy resin mortar Grade 70 in accordance with
the Specication and as shown in Drawing.

Laminated Elastomeric Bearings (Free)


475mm x 475mm x 60mm thick Laminated
Elastomeric bearings on minimum 25mm thick
epoxy resin mortar Grade 70 in accordance with
the Specication and as shown in Drawing.

450mm x 2800mm x 100mm thick Laminated


Elastomeric bearings on 50mm thick grout bedding
and concrete upstand.

no.

546.14

546.14

no.

555.00

555.00

no.

620.66

620.66

no.

472.50

472.50

78

JADUAL PURATA
KADAR HARGA 2014

3.3.17: MISCELLANEOUS WORKS (CLASS T)

PURATA KADAR HARGA 2014 (RM)


BIL

KETERANGAN KERJA

UNIT

21

400mm x 300mm x 60mm thick Laminated


Elastomeric bearings on minimum 20mm thick
epoxy resin mortar Grade 70 in accordance with
the Specication and as shown in Drawing.

no.

800.00

800.00

22

Brass Plaque as shown in the Drawing.

no.

2,121.25

2,121.25

set

10,499.91

10,499.91

no.

1,819.73

1,819.73

KAWASAN
UTARA

KAWASAN
TENGAH

KAWASAN
TIMUR

KESELURUHAN

SIGNAGES & INTERPRETIVE PANEL


Info Panel at Main Entrance Wall (Type E2)
23

Overall size: 1500mm (H) x 2950mm (L)


Panel size: 1 500mm (H) x 900mm, 600mm,
700mm, 600mm (L)
2mm thk aluminum box up base with 2K spray
painted nish and 10mm thk cut out clear acrylic
with 2K spray painted nish for logo/logotype.
With wooden panel for top header with engraved
and colour inlled for texts.
With 5mm thk clear acrylic middle signface panel
and reversed inkjet sticker mounted onto base with
4pcs of chrome button screws for each panel.
With 5mm thk clear acrylic graphic with 2K spray
painted nish mounted onto wooden panel.
All to be mounted onto existing wall.
Amenities Projecting Directional Sign (double
sided) (Type E8)

24

Panel size: 400mm (dia)


3mm thk aluminum sign panel with backing frame,
complete with photo chemical etching with full
colour inll for texts & graphics mounted onto mild
steel frame structure c/w spray painted nish
bolted onto existing wall.
Male/Female/Disable WC.

79

KOS UPAH BURUH

JABATAN PENGAIRAN DAN SALIRAN,


MALAYSIA

JADUAL PURATA
KADAR HARGA 2014

4.0

KOS UPAH BURUH

4.1

TUJUAN
Bahagian ini mengandungi maklumat berhubung dengan kos dan kadar upah
buruh.

4.2

BENTUK MAKLUMAT DAN PERTIMBANGAN


Maklumat diberikan dalam bentuk RM sehari untuk tempoh lapan jam. Kadar
ini adalah termasuk tambahan lima belas peratus (15%) seperti yang
dinyatakan dalam klausa 25.2 Syarat-syarat Kontrak JKR 203A (Rev.1/2010).

80

JADUAL PURATA
KADAR HARGA 2014

4.3 : KOS UPAH BURUH

Item

Description

UNIT

KAWASAN
UTARA

PURATA KADAR HARGA 2014 (RM)


KAWASAN
KAWASAN
KESELURUHAN
TENGAH
TIMUR

General Labour

day

64.20

61.45

62.50

62.70

Ganger/Chargehand

day

91.30

83.25

81.25

85.30

Concretor

day

80.15

79.40

76.35

78.65

Mason

day

86.95

79.10

77.70

81.25

Carpenter/Joiner

day

86.95

83.55

86.50

85.60

Steel Bar Bender and Fixer

day

87.20

83.80

89.10

86.70

Pnuematic Tool Operator

day

96.05

88.85

98.90

94.60

Welder

day

92.60

99.30

85.80

92.60

Ringger/Driller

day

100.30

92.20

98.75

97.10

10

Fitter

day

96.70

80.80

92.90

90.10

11

Pavior/Plasterer

day

90.00

87.15

86.25

87.80

12

Drainlayer

day

89.35

82.90

75.45

82.60

13

Lorry Driver

day

96.95

83.40

83.65

88.00

14

Watchman

day

90.00

65.65

61.80

72.50

15

Plant/Excavator Operator/Driver

day

106.15

90.20

82.00

92.80

16

Electrician

day

95.90

93.60

88.00

92.50

17

Metal Worker

day

89.70

89.35

84.45

87.85

81

KOS SEWA
LOJI & PERALATAN

JABATAN PENGAIRAN DAN SALIRAN,


MALAYSIA

JADUAL PURATA
KADAR HARGA 2014

5.0

KOS SEWA LOJI DAN PERALATAN

5.1

TUJUAN
Bahagian ini mengandungi maklumat berhubung dengan kos sewa loji dan
peralatan.

5.2

BENTUK MAKLUMAT DAN PERTIMBANGAN


Maklumat diberikan dalam bentuk RM sejam.
Kadar Harga adalah termasuk:(i)

loji/peralatan yang disewa, pajak ataupun milik Kontraktor sendiri;

(ii)

tambahan lima belas peratus (15%) seperti yang dinyatakan dalam


klausa 25.2 Syarat-syarat Kontrak JKR 203A (Rev. 1/2010).

82

JADUAL PURATA
KADAR HARGA 2014

5.3 : KOS SEWA LOJI DAN PERALATAN

BIL

KETERANGAN KERJA

UNIT

KAWASAN
UTARA

PURATA KADAR HARGA 2014 (RM)


KAWASAN
KAWASAN
KESELURUHAN
TENGAH
TIMUR

Backhoe

hour

57.20

59.90

53.15

56.75

Dragline
RB 19
RB 22
RB 30

hour
hour
hour

65.45
75.00
95.00

82.90
105.35
105.65

86.70
115.00
123.35

78.35
98.45
108.00

Excavator
Up to 0.5 m3
0.5 m3 to 1.0 m3
Over 1.0 m3

hour
hour
hour

71.90
79.00
98.50

82.30
39.40
113.40

72.50
88.15
94.40

75.60
68.85
102.10

Excavator Hydraulic Operated


Up to 0.5 m3
0.5 m3 to 1.0 m3
Over 1.0 m3

hour
hour
hour

82.40
98.30
115.40

97.95
99.05
111.30

92.80
107.20
97.50

91.05
101.50
108.10

Face Showel
Model 920
Model 950
Model 966

hour
hour
hour

75.64
86.00
109.00

90.57
104.85
125.65

76.00
88.00
102.00

80.75
92.95
112.20

Back Pusher

hour

55.70

60.35

45.85

54.00

Vibrating Roller 15 Tonne

hour

92.60

101.90

95.00

96.50

Compressor

hour

45.65

43.75

43.75

44.40

Bulldozer
Model D4
Model D6
Model D8

hour
hour
hour

77.15
90.40
99.25

89.95
97.30
109.10

87.15
95.70
110.00

84.75
94.50
106.10

10

Tractor

hour

61.75

83.60

78.35

74.60

11

Mobile Crane
3 tonne
16 tonne
25 tonne
35tonne
40 tonne

hour
hour
hour
hour
hour

65.70
79.15
89.90
127.30
169.50

73.30
95.35
100.15
138.55
174.45

61.70
103.65
110.00
147.15
185.00

66.90
92.70
100.00
137.70
176.30

Motor Grader

hour

105.30

104.20

136.36

115.30

12

83

JADUAL PURATA
KADAR HARGA 2014

5.3 : KOS SEWA LOJI DAN PERALATAN

BIL

PURATA KADAR HARGA 2014 (RM)


KAWASAN
KAWASAN
KESELURUHAN
TENGAH
TIMUR

UNIT

KAWASAN
UTARA

Dumper
Up to 0.5 m3
0.5 m3 to 3.5 m3

hour
hour

75.00
99.45

76.40
86.30

66.00
73.00

72.50
86.25

Steel Roller
8 tonne
12 tonne

hour
hour

74.60
84.40

90.40
107.20

107.50
124.45

90.85
105.35

15

Low Loader

hour

151.35

125.40

156.25

144.35

16

Lorry
6 tonne
8 tonne
10 tonne

hour
hour
hour

56.70
62.85
75.80

64.40
80.70
88.90

72.20
90.00
100.45

64.45
77.85
88.40

Tipper without road tax


6 tonne
10 tonne

hour
hour

52.65
64.30

61.90
70.50

52.50
65.00

55.70
66.60

Tipper with road tax


6 tonne
10 tonne

hour
hour

60.45
79.60

71.65
91.45

58.40
72.50

63.50
81.20

Concrete Mixer
Concrete Mixer 7/5
Concrete Mixer 10/7
Concrete Mixer 14/10
Concrete Mixer 21/14

hour
hour
hour
hour

28.30
35.45
56.20
67.80

40.00
49.30
60.10
74.80

45.55
49.45
68.75
85.00

37.95
44.75
61.70
75.90

Water Pump
3'' Diameter
6'' Diameter
8" Diameter

hour
hour
hour

31.20
36.20
59.40

36.95
43.25
63.85

56.00
66.00
77.85

41.40
48.50
67.05

Welding and cutting set complete


Oxy - acetylene
Electric

hour
hour

68.95
65.40

73.20
80.41

86.7
82.50

76.30
76.10

hour

82.75

105.65

125.00

104.50

13

14

17

18

19

20

21

22

KETERANGAN KERJA

Drilling machine complete with all necessary


equipment

84