SOIL CEMENT
Cement Hydration
CSH + CAH + Ca(OH)2-------------------(1)
Cement + H2O
Released Lime 1
Ca(OH)2
Ca++ + 2(OH)
2
Ca++ + 2(OH) + Soil Silica (SiO2)
CSH ---------------(2)
CAH---------------(3)
Ca+++ 2(OH) + Soil Alumina (Al2O3)
qu vs. Admixtures
1 Compressive Strength %
(After Mitchell, 1976)
ROTARY MIXING
MECHANICALLY MIXING
JET GROUTING
Jet Grouting
SEQUENCE
1 Insertion of jetting tools into 2. Discharging super-high-pressure
a drilled
cement slurry
SPOIL
1. Pre-Jet Pressure
150 bars; ksc
SPOIL
2. Jet Hi-Pressure
Cement-Slurry
Pressure 200 bars.
3. Cement-Slurry
Step1
Form CEMENT COLUMN.
Cement Column
GROUND IMPROVEMENT
S : SINGLE SYSTEM
T : TRIPLE SYSTEM
- AIR - WATER - GROUT
D : DOUBLE SYSTEM
AIR - GROUT
CEMENT COLUMNS
*
*
*
*
*
*
*
10
* .
* Pre-jetting
*CEMENT SLURRY 90
*
* JET GROUTING
* STROKE
JET GROUTING
CEMENT COLUMN
* DENSITY 1 30
.. CEMENT COLUMN
* PILE LOAD TEST CEMENT COLUMN
PILE LOAD TEST
11
Stroke
Density
12
*
0.80
15 . RQD
STRENGTH (Qu)
13
14
1.
Q ull.
Q s + Qb
Q ull.
Qs
Qs
Su
Qs = Su As
Q b = Nc C b A b
Qb
Cb = Sub
= 1 t/m2
= 1.0 FOR SOFT CLAY
( Holmberg)
Nc <FOR CLAY> = 9 SKEMPTION (1951)
2. Broms
1.5 - 2.0 .
L
PLAN
Qult = 2 Su x H x (B + L) + (6 to 9) Cb x B x L
15
Q Col.
ull.
qu
f
or c
2
2
= horizontal pressure
=
CCol.
u
h
Creep load
C
:a =
ACol.
C2
Acol. =
C = 1.5 - 2.0 .
FOR Dia. 0.60 - 0.80 m.
* AXIAL STRESS COLUMN
Creep Limit
16
R
Su1
C
Su1
Su2
Cave = Cu (1 a) + C Col.
W
u xa
1.25
FS =
1.50
PLAN
WL
Su = 30 t/m2
Su = 1 t/m2
Stiff Clay
( Col. Su = 50 t/m2)
Su = 9 t/m2
SECTION
17
PLAN
SECTION
1 - 1
18
LOAD AREA
= 3x3
= 9 m2
19
1.6 M.
=
=
=
=
=
=
=
=
3x3
9 ..
1x9
9
3.7 x 2.1 x 9
69.9
7.7 x 1.1 x 9
76.2
20
Qull.
=
=
=
=
=
Qs1
Qs2
=
=
=
=
Qb
=
=
=
Qull.
Qcreep
ull.
=
=
=
=
=
Qcreep =
=
=
Or Qcreep =
=
Qs + Qb
Qs1 + Qs2 + Qb
Su1 1 As1
1.0 1.0 1.6 8
40.2
Su2
L
9 0.4 2 1.6
36.2 tons
Nc Sub Ab
9 9 1.62
4
162.8 tons
40.2 + 36.2 + 162.8 239.2 tons
0.65 to 0.8 Qull. = 155.5 to 191.3 tons
Q s + Qb
Qs1 + Qs2 + Qb
1Su1As1 + 2 Su2 As2 + Qb
40.2 + 36.2 + 162.8
239.2 tons.
0.65 to 0.80 Qull.
0.65 x 239.2
155.5 tons.
0.80 x 239.2
191.3 tons.
21
4 Adhesion Factor
1.4
1.2
Adhesion Factor
1.0
0.8
0.6
0.4
0.2
0.0
0
10
12
14
16
18
2)
C Col. =
u
Col.
Q ult =
50 t/m2
Col.
[2Cu
+ 3 h ] A col.
[ 2 x 50 + O ] 4x 1.6
201 tons.
Qcreep =
0.80 x 201
160.8 tons.
22
SOFT CLAY
C = 3.0 m.
Su = 30 t/m2
Soil, Su = 1.0 t/m2
C = 3.0 m.
TRANSFORM STRENGTH
a
qu
Cement Column
qu
soil.
qu
t/m2
Cave.
qu
used.
Strain
, %
=
=
=
Acol. =
1.62/4
C2
32
0.223
CuSoil. (1 - a) + CuCol. a
1.0 ( 1 0.223 ) + 30 0.223
0.777 + 6.69
= 1.20 m.
C = 1.5 m.
=
=
=
Acol.
C2
1.22/4
1.52
0.502
CuSoil. (1 - a) + CuCol. a
0.1 ( 1 0.502 ) + 30 0.502
0 + 15.06
15 t/m2
C = 1.5 m.
Cave.
23
24
1
= 0.224 .. 24 .
TEST TOTAL = 128 t 1250 KN.
14 Cement Wall
25
CUT OF PANELS
PUMP HOUSE
CUT OF PANELS
SALT
WELL
SHAFT
15 Cement Wall
JET GROUTING
26
13 Cement Columns
27
28
GROUND IMPRKOVEMENT
GROUND IMPROVEMENT
29
Cement Column
30
31
32
33
34
Closed Hydraulic
Open Standpipe
4 AIT-Type
35
Jet Grouting
Closed Hydraulic
36
(Air Tube)
2.
Closed Hydraulic
u = h H g + h0 h w
2
37
Open Standpipe
Piezometer Multi meter
38
0.00
Depth (m)
0.05
0.10
0.15
0.20
0 day
7 days
14 days
28 days
56 days
10
66 days
39
DAM
.
439,100
. 40,900
..
35,000 ()
.. 24,000 ()
.
17,500
40
Closure Dam
940 M
230 M
Water Gate
41
42
Stand Pipe
Piezometer
Surface Settlement
Plate
Deep Settlement
Plate
43
MONITORING
Settlement Point
Time , days
0
50
100
150
200
250
300
350
400
450
500
550
600
650
0
20
Sett. Point 1
Sett. Point 2
Sett. Point 3
40
Sett. Point 4
Sett. Point 5
49 mm.
Settlement , mm.
60
80
100
109 mm.
121 mm.
120
140
148 mm.
160
191 mm.
180
200
44
45
46
Cement Column
47
Cement Column
48
BANGMOD METHOD
49
50
Cement Column
51
H-beam
52
53
CAP Beam
SCREW JACK
54
Pile CAP
55
10.00
3.00
Subbase
3.00
Monitor
3.00
0.50
2.00
3.00
2.00
2.00
2.00
4.00
Horizontal Inclinometer
Piezometer
56
1 12 ''
12 ''
12 '' 1 12 ''
2.5 cm.
12 ''
1.3 cm.
12 ''
45 cm.
12 ''
47.4 cm.
1 12 ''
1 12 ''
2.5 cm.
1 12 ''
1.3 cm.
3.75 cm.
3 cm.
7 cm.
4.95 cm.
1 12 ''
10 cm.
24 ''
24 ''
2.5 cm.
2.5 cm.
1.5 cm.
6 cm.
2.5 cm.
1.3 cm.
1.25 cm.
1.3 cm.
12 ''
6 mm.
100 cm.
20 cm.
10 cm.
3 cm.
0.20 81 ''
3 cm.
0.20 18 ''
57
58
2.00
Horizontal Inclinometer
59
Piezometer
60
Settlement (cm.)
2.50
2.00
2.00
1.50
1.00
0.50 0
0.00
-0.50 0
-1.00
-1.50
-2.00
-2.50
-3.00
-3.50
-4.00
-4.50
-5.00
-5.50
50
100
50
100
150
200
250
0.35 cm.
150
200
250
+2.00 m.
300
350
0.00 m.
2.81 cm.
4.15 cm.
5.11 cm.
61
2.50
2.00
2.00
1.50
1.00
0.50 0.00
2.00
4.00
6.00
8.00
10.00
0.00
Distance (m.)
12.00
14.00
16.00
-0.50
Settlement (cm.)
-1.00
-1.50
-2.00
-2.50
-3.00
-3.50
-4.00
2.90 cm.
2.80 cm.
11/10/01
13/12/01
18/10/01
04/01/02
3.30 cm.
26/10/01
11/01/02
02/11/01
16/01/02
08/11/01
07/02/02
14/11/01
22/02/02
23/11/01
15/03/02
06/12/01
2.50
2.00
2.00
1.50
1.00
0.50 0.00
2.00
4.00
6.00
8.00
10.00
0.00
Distance (m.)
12.00
14.00
16.00
-0.50
Settlement (cm.)
-1.00
-1.50
-2.00
-2.50
-3.00
-3.50
-4.00
-4.50
3.70 cm.
4.00 cm.
11/10/01
13/12/01
18/10/01
04/01/02
3.80 cm.
26/10/01
11/01/02
02/11/01
16/01/02
08/11/01
07/02/02
14/11/01
22/02/02
23/11/01
15/03/02
06/12/01
Digitilt
Horizontal Inclinometer (IN2) [On Ground]
62
Soil
Investigation
63
Cement Column
64
65
5.58 cm.
6.68 cm.
0.50
5.98 cm.
5.44 cm.
0.50
230
66
6.00
3.00
3.00 6.00
67
48 .
68
Load (ton)
16.0
14.0
12.0
10.0
8.0
6.0
4.0
2.0
0.0
PL1
PL2
PL3
PL4
PL5
PL6
69
Coring PL5
9 .
10 .
14 .
16 .
24 .
9 .
5 .
6 .
10 .
10 .
10 .
7 .
30 .
25 .
10 .
28 .
8 .
31 .
12 .
40 .
20 .
20 .
15 .
70
0.0
2.0
4.0
, ()
6.0
8.0
10.0
12.0
0.0
-5.0
-10.0
4.98 = -2.79 .
= -0.12 .
= 2.67 .
-15.0
-20.0
, (.)
PL6
-25.0
-30.0
-35.0
4.98 = -2.82 .
-40.0
-45.0
= 10.83
-50.0
-55.0
-60.0
Time, hr
Slope < 0.25 mm./hr.
Load, tons
- 22(3)
S<6
mm(Permanent
Settlement )
24
22(2)
0 hr.
22(1)
T=24hr.
Settlement, mm.
24 hr. S<25mm.
6 (..2527)
( . .. 2522 )
71
Ultimate Load
200
120
80
6 mm.
1.8
4
Permanent Settlement,mm.
3 22(3)
72
73
Thank you
74