Professional Documents
Culture Documents
Risk Assessment Welding Radiography of Chilled Water Pipe PDF
Risk Assessment Welding Radiography of Chilled Water Pipe PDF
Rev 0 Page 1 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
5 4 3 2 1
LIKELYHOOD
VERY ALMOST
UNLIKELY LIKELY VERY LIKELY
UNLIKELY CERTAIN
Rev 0 Page 2 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
Rev 0 Page 3 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
RATING
NO HAZARDS IDENTIFIED WHO CAN BE HARMED (RISK ID) PREVENTATIVE CONTROL MEASURES
(Who, What, How, Why, Where, When) (Eliminate, Reduce, Isolate, Control, PPE, Discipline)
L S R H S E
1 3 4 H S Lifting materials (Pipe, ducts, Personal Injury, property damage, Regulations require employers to avoid the need to carry
tools, equipment) Persons may cause long and or out manual handling which creates a risk of injury.
manual handling short term injury to themselves Where avoidance is not reasonably practicable
employers have to make an assessment, reduce the risk
of injury as far as reasonably practicable and provide
information about the weight of loads.
2 3 4 H S Transportation of materials Personal Injury, Property damage, Ensure the transport vehicle is in sound condition.
(pipe) Road/vehicular accident Ensure driver has valid driving license
Follow traffic rules & regulations
Ensure material is placed tightly and secured with
proper belts & wedges
Store material in designated area and stack properly
Proper manual handling method.
Rev 0 Page 4 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
3 3 4 H S Lifting operation Off loading of Serious injury, Property damage, Resposible engineer/supervisor must ensure that all
unit (crane / forklift) death, Overturn of equipment, crane , forklift and all lifting equipment/tackle were
colapse of crane, crushing with inspected and in good condition with a valid test
falling load(pipe) certificate from registered 3rd party cetifying company.
Supervisor, operators, slinger / signaler must be
certified competent by an external 3rd party certifying
company.
Riggers will wear neon vests and bright orange hard
hats.
Ensure crane are stable(level ground, fully extend
outrig, enough clearance)
Ensure enough clearance and area is not restricted for
forklift manouver.
4 3 4 H S Use of drill machine, grinding Personal injury, property damage Ensure supervision is present all the time during the
machine (inproper use) Fire, electric shock, trip, burn operation.
Support installation Electrical power operated tools shall be of the
approved double-insulated type or grounded.
The use of electric cords for hoisting or lowering tools
shall not be permitted.
Inspect all tool before using.
Use eye protection, (gogles, facesheild), dust mask,
hand gloves.
Rev 0 Page 5 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
5 3 4 H S Use of scaffold, Personal injury, property damage, Use only scaffold that is built, inspected, taged and will
overhead/vertical/risers Fall of person / material, collapse or be modified only by competent scafolder,
installation overturning of scaffold, struck by Ensure that brakes are engaged.
falling materials. No material and person in the scaffold when moving
scaffold.
Do not throw materials, Use ropes to handle them
safely
Ensure complete platforms with safety handrails, guard
rails toe boards & access ladders.
6 3 3 M S Use of ladder Fall from ladder, slip of ladder, Ladders must be checked/inspected before use
object dropped from user. Correct length must observed.
Ground base must be firm and level
A ratio of 1:4 base to height must be observed
Avoid over reaching
None slip base must be used and tie ladder on top.
While using A type step ladder unsure the ladder
having proper rubber footing and locked cross arm
2m above Astepladder are prohibited at site.
Radiography Test of chilled .
7 4 4 H S Water pipes. Personal injury, property damage Ensure working area 15m radius Barricated with
Persons may cause long and or warning tape
short term injury to themselves Ensure sufficient lighting and ventallation is provided.
cause by Radiation Ensure good communication and assign a watcher.
Authorized/ Engineer approved 3rd party should carry
out Radiography test.
Prior starting they should submit the specific Risk and
control measure and it should be approved by Engineer.
Rev 0 Page 6 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
Rev 0 Page 7 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
9 3 3 M H S Use of solvent, adhesive Personal injury, irritation, alergic Ensure that proper handling, use and dispossal of
cleaners (insulation) reaction. solvent / adhesive are adhere, based on MSDS (Material
Fire, Explosion Safety Data Sheet) and ensure that hadler are informed,
trained and instructed
Keep away the material from any kind of fire source
Application of solvent / adhesive should be supervised
closely
Keep fire extinguisher at site.
Use appropriate PPE ( hand gloves , mask) as
suggested in MSDS
10 2 3 M H S Use of Fiber glass insulation Personal injury, irritation alergic Minimised working time / exposure with fiber glass
reaction, ionhallation of fiber glass insulation by proper planning of work.
Avoid breathing of fiberglass dust , use specified dust
mask by manufacturer, MSDS
Ensure proper stacking of fiber materials and only the
required amount / volume should be brought to site.
Avoid contact with the skin or eye, wear long sleeved,
loose-fitting clothing, gloves and eye protection
Ensure to engage only competent person (trained,
instructed and experienced).
11 3 4 H S Hydro (pressure) testing Personal injury, property damage Competent personnel supervised by qualified and
(bursting of pipe / hose / joints etc.) experienced supervisor shall only carry out testing.
Ensure that testing procedures are strickly follow.
Barricade and caution signs must be placed at the
appropriate and critical area.
Only calibrated and inpected gauges shall be used.
Do not over pressure the pipe follow only
required/recommended pressure.
Conduct tool box talk before carrying out testing.
Rev 0 Page 8 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
14 3 3 M S E Excess and waste materials Personal injury, damage to Maintain house keeping at all times. Waste materials to
Tripping/Slipping Fire hazard property. be disposed off immediately or upon completion of the
activities.
Rev 0 Page 9 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
NO ACTIVITIES CONTROLS
1 Obtain drawings of the works that needs to be done. Ensure safety measures have been incorporated within the drawings as far as
practically possible.
2 Training Train worker of proper manual handling and proper handling of solvent cement.
3 Assigned workers, assemble all equipment necessary to carry Conduct TOOL BOX TALK before start of work.
the task.
4 Proceed with installation works until works are finished. Any deviation or other safety concern that will come up, must be brought to the
attention of safety personnel/officer on the site.
5 Day end cleanup and housekeeping The area must be made safe at the end of each shift ensuring adequate barricades are
in place preventing unauthorized entrance of persons in the areas that may pose a risk.
Stack all equipment and materials in a safe manner at all times and clean the area to
eliminate tripping hazards.
Rev 0 Page 10 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor
RISK ASSESSMENT
Doc No: MAC-MEP-MS-032
SURESH KUMAR
35848 PIPEFITTER
GOPALAKRISHNANNAIR
Rev 0 Page 11 of 11
Risk Assessment 032
Prepared by:
Virgilio E.H.S. Supervisor