Professional Documents
Culture Documents
DOWNLOA D PDF
Introduction
Choose from the rating systems and programs in the tabs below to review
registration and certification fees.
You'll notice discounted pricing options for USGBC members. Discounts are available
based on the membership status of either the owner or the project administrator for
a given LEED project.
Visit our payment help section to search for frequently asked questions. If you need
assistance at any time, please call, email, or live chat with us.
SILVER,
Building Design and ORGANIZATIONAL GOLD AND
MEMBER
LEVEL OR PLATINUM
Construction Fees NON-MEMBERS LEVEL
SAVINGS
MEMBERS
C O M B I N E D R E V I E W: D E S I G N & C O N S TR U C TI O N
S P L I T R E V I E W: D E S I G N
S P L I T R E V I E W: C O N S TR U C TI O N
AP P E ALS
FORM AL IN QU IRIE S
C O M B I N E D R E V I E W: D E S I G N & C O N S TR U C TI O N
S P L I T R E V I E W: D E S I G N
S P L I T R E V I E W: C O N S TR U C TI O N
AP P E ALS
FORM AL IN QU IRIE S
I N I TI A L R E V I E W
R E C E RTI F I C ATI O N R E V I E W
AP P E ALS
FORM AL IN QU IRIE S
FIRST
Neighborhood Development Fees 20
PER ACRE
OVER 20
ACRES
REGISTRATION $1,500/PROJECT
S mart Loc ation and Linkage (S LL) Prerequisite Review (Optional for
$2,250
LEED v2009)
S mart Loc ation and Linkage (S LL) and Neighborhood Pattern and
$5,000
Design (NPD) Prerequisite Review (Optional for LEED v4)
AP P E ALS
All LEED-ND projects larger than 320 acres must contact GBCI about pricing.
All projects are subject to the Initial Stage Review fee, which includes both a Preliminary and Final Review with GBCI. Projects are only
subject to a Subsequent Stage Review fee if they have previously successfully completed a stage of LEED ND certification and are
returning for another round of review.
Homes Fees
Note: Additional fees will be charged by the verification team contact
your team for more information.
SILVER, GOLD
ORGANIZATIONAL
Homes Fees LEVEL OR NON-
AND PLATINUM MEMBER
LEVEL SAVINGS
MEMBERS
MEMBERS
S I N G L E FA M I LY H O U S I N G ( C O S T P E R H O M E )
L O W- R I S E M U LTI - FA M I LY H O U S I N G ( C O S T P E R B U I L D I N G )
Certific ation (less than 50 units) $0.045 psf $0.035 psf $0.010 psf
Certific ation (50 or more units) $0.040 psf $0.030 psf $0.010 psf
M I D - R I S E M U LTI - FA M I LY H O U S I N G ( C O S T P E R B U I L D I N G )
Certific ation (less than 50 units) $0.045 psf $0.035 psf $0.010 psf
Certific ation (50 or more units) $0.040 psf $0.030 psf $0.010 psf
Campus Fees
SILVER, GOLD
ORGANIZATIONAL
Campus Fees LEVEL OR NON-
AND PLATINUM MEMBER
LEVEL SAVINGS
MEMBERS
MEMBERS
$300 per
Eac h individual on-c ampus projec t $1,200 per building or $900 per building
building or
registration spac e or spac e
space
C O M B I N E D R E V I E W: D E S I G N A N D C O N S TR U C TI O N & O P E R ATI O N S A N D M A I N TE N A N C E
Eac h individual on-c ampus projec t 20% off standard c ertific ation fees*
S P L I T R E V I E W: D E S I G N
Master S ite $1,500 $1,200 $300
Eac h individual on-c ampus projec t 20% off standard c ertific ation fees*
S P L I T R E V I E W: C O N S TR U C TI O N
Eac h individual on-c ampus projec t 20% off standard c ertific ation fees*
*Please note that Group projects are not eligible for the 20% discount on certification fees even if they are utilizing campus credits from a Master Site.
*Registration, precertification review (CS only) and certification review fees for group projects are equivalent to what would be charged if each building
or space within the group were registered and reviewed as a separate LEED project. However, fees for appeals and formal inquiries are assessed per
group project, not per building or space within the group.
AP P E ALS
V O L U M E P R O J E C TS F E E
A D D I TI O N A L F E E S O R S E RV I C E S