LILONGWE DEDZA ZONE WEEKLY TECHNICAL REPORT

WEEK 4
TECHNICAL

Availability:

Solar
Transmission TNM others Rectifier/Electric BSS Failure/No
Faults generators Generators al faults Equipment Maintenance DG
0 0 0 0 0 0 0

Operations and Maintenance

Achievements in Week 4

Installed DG, rectifier and rectifier batteries at LL bus depot


Rectifier battery testing at Lobi, Malirana, Nathenje and Kabwazi
Done electrical maintenances at Bunda, LL Bus depot
Worked on faulty change over at Nathenje
Replaced faulty TREs at Malirana

Planned activities in Week 5

Do battery testing at Area 24, Area 24 Mkt, Area 38


Work on tower lights at LL bus depot
Do electrical and transmission maintenances Bunda

Risks and challenges

Following sites have no equipment earth cables


- Bus depot, Bwalo la Njobvu, Area 9, Bunda, Area 4, Area 9, Area 38, Kamphata, Nathenje