DRILLING LOG HOLE NO.

BH2
Project TOL BOCIMI Type of Drilling Continues Coring Coordinat
Location STA ON RAM 0+530 Driller Irwansyah X
Date 18 - 21 Nopember 2016 Supervisor Trisno Y
GWL 11.0 m Z 432.263

N2 (15-30CM)

N3 (30-45CM)
N1 (0-15CM)
SPT Curve Soil Laboratory Results

N-SPT
Depth

Sampling Symbol Soil Description g LL PL C


w
Gs W % Type f
0 10 20 30 40 50 60
t/m % % kg/cm

20.0 SPT 10 same as above 60/13 0 0 60


20,00-20,13
20.5

21.0

21.5

22.0 SPT 11 ROCK, black, hard 60/8 60


22,00-22,08
22.5

23.0

23.5

24.0 SPT 12 same as above 60/5 60


24,00-24,05
24.5

25.0

25.5

26.0 SPT 13 same as above 60/6 60


26.00-26.06
26.5 Drilling stopped at 26,0m depth

Remarks : UDS (Undisturbed Sample)


DS (Disturbed Sample)