You are on page 1of 4

Checklist for Anti Termite Treatment

Project : Doc. No.


Client : Project Location

SITE LOCATION

1 Check Surface Preparation

2 Check Chemicals

3 Check Application as per Manufacturer's Instructions (MSDS) & Architects Specs

4 Check Finished treatment of work

5 Check for Mix Proportion (As per Manufacturer's Instruction)Water/Kerosene

6 Check for Stages like Foundation/flooring / Joinery / External

Remarks of Quality Assurance Engineer:


Signature Date
Checked By:
Approved By:
: QA/CL-EXC/
ect Location :

DATE

YES NO NA

Architects Specs

rosene
Remarks/ Comments

You might also like