INPUT PERENCANAAN
6
W18 = 707,389 18 kip ESAL 0.71 x 10 UR (Tahun) = 10
R = 90 %
ZR = -1.282 Koefisien Aspal a1 = 0.315
MR = 9,000 Psi Koefisien Base A a2 = 0.138
So = 0.45 Koefisien Sub Base B a3 = 0.127
PSI = 2.20 Koefisien Drainase m = 1.000
FORMULA
PSI
Log10
4.2 - 1.5
Log10W18 = ZR x SO + 9.36 x Log10 (SN+1) - 0.20 + + 2.32 x Log10 x MR - 8.07
1094
0.4 +
(SN+1)5.19
SOLUTION
SN perlu = 2.9586
PERHITUNGAN TEBAL PERKERASAN LENTUR METODE AASHTO '93
Long Bawan - Long Midang (Kaltara)
CALCULATION
LAPISAN DATA SN Perlu TEBAL (D) SN Desain
SNAC / a1
CBR = 90 % a1.D1
SURFACE / ASPAL (AC) 1.9002 D1 = SN*AC =
6.032 Inch
MR = 30000 Psi 1.2402
10 Cm
SNBS - SN*AC / a2m2
CBR = 60 % a2.D2.m2
7.710 Inch
BASE / AGG "A" (BS) 2.3041 D2 = SN*BS =
19.583 Cm
MR = 18000 Psi 1.7386
32 Cm
SN Perlu = 2.9586 SN Desain = 2.9787
KONTROL
SN perlu SN desain = a1*D1 + a2*D2*m2 + a3*D3*m3
2.9586 2.9787 OK !
AC-Base 0.315 0 Cm