Professional Documents
Culture Documents
1 Material Specification
a. Pavement (fc') : 250
b. Basecourse : -
c. Sub Base Course : -
d. Sub Grade : 6%
e. Wiremesh (fy) : 4900
2 Traffic Load
2) Normal period
i = 0.00 (Peningkatan 2%)
n = 20 Years (Periode normal)
4 Equivalent Traffic
a. Initial Daily Equivalent (LEP)
LEP = LHRj x Cj xEj
LET = 609.0594
d. Equivalent Traffic Design (LER)
= =(64
&/10)
FP = Adaptation Factor
= 2
LER = 1218.1188
e. Estimated Total Equivalent Single Axle Load (ESAL)
=_365( ( _20+ _0)/2) _
7 Concrete reinforcement
min = 0.0018
Wiremesh dia = 6
h = 200
cc = 70
d = 130
As = 234
CBR
kg/cm
E mid E Rear Ej
36.0877 36.0877 108.2631
14.7815 14.8392
2.255 23.385 27.895
4.511 24.414 29.849
LEP
324.7893
155.8116
83.685
44.7735
609.0594
LEA
324.7893
155.8116
83.685
44.7735
609.0594
kPa/mm
psi
psi
psi
mm
mm
mm
mm
mm
mm
mm
mm
mm
5.05
20.2
5.05
2.02
5.00
20.00
5.00
2.00