A
2 percent going to A
the pit
1% 1%
Slope Slope
C
6 floor slab
0.2 meter (CHB)
0.2 meter (concrete)
20 meters
Pit
0.2 meter (CHB)
1%
0.2 meter (concrete)
20 meters
10 meters
6 floor slab
20 meters
Remove one chamber to
change to checker plate for
canal cover
0.25 m 0.2 m