You are on page 1of 3

C B

Tapping point on the 2.0 meters (from


canal edge of building
to the edge of the
canal)

Mini Ditch 4 width

A
2 percent going to A
the pit

1% 1%
Slope Slope

C
6 floor slab
0.2 meter (CHB)
0.2 meter (concrete)

20 meters

Existing Canal Oil Water 6 floor slab


Separator 4 canal

Pit
0.2 meter (CHB)
1%
0.2 meter (concrete)

20 meters

10 meters

6 floor slab

0.2 meter (CHB) 3% 4%


1%
0.2 meter (concrete)

20 meters
Remove one chamber to
change to checker plate for
canal cover

Existing Canal Pit at the Building

0.25 m 0.2 m