You are on page 1of 1

ISSUED FOR

Stages Date
FOR CONSTRUCTION 2016.04.02

REASON FOR REVISION


NOTES LEGEND:
Rev. Description Date
PLUMBING SYSTEM UPDATE AS FOLLOW
01 UPDATED KITCHEN 2017.10.19
CONTROL PANEL FOR PUMP WATER CLOSET bp BOOSTER PUMP CO CLEAN OUT LAYOUT'S REQUIREMENT
MATERIAL OF PIPE

USE PPR-PN10 PIPE FOR SUPPLY COLD WATER FROM BASEMENT TRANSFER PUMP TO ROOF WATER TANK, ELECTRIC WELDED CONNECTION
USE PPR-PN10 PIPE FOR SUPPLY COLD WATER FROM ROOF WATER TANK TO THE FLOOR BELOW, ELECTRIC HOT MELT CONNECTION VENT CAP OF PIPE WASH BASIN tp TRANSFER PUMP
USE PPR-PN10 PIPE FOR SUPPLY COLD WATER FOR THE BRANCHING PIPE FROM SANITARY WARE OR FIXTURE TO MAIN BRANCHING PIPE, ELECTRIC WELDED CONNECTION
FD
DRAINAGE SYSTEM FLOOR DRAIN CHECK VALVE
SINK
MATERIAL OF PIPE
THE uPVC-PN9 PIPE USED FOR THE MAIN BRANCHING PIPE AND VERTICAL PIPE, ADHESIVE FIXING.
WASHING MACHINE GATE VALVE
THE uPVC-PN6 PIPE USED FOR THE BRANCH PIPE FROM SANITARY WARE OR FIXTURE TO MAIN BRANCH PIPE, ADHESIVE FIXING. URINAL Key Plan :
N

OTHERS UPC SITE RESTAURANT

FCO SUBMERSIBLE PUMP FLEXIBLE CONNECTOR


- PIPE DIAMETER AND PLAN DIMENSION UNITS ARE IN MM, LEVELS OF PIPELINE ARE IN MM. FLOOR CLEAN OUT

- ELEVATION OF WATER SUPPLY PIPE IS THE CENTER LINE OF PIPE, ELEVATIONS OF DRAINAGE PIPE IS THE BOTTOM LEVEL OF
PIPE AND THE DRAINAGE PIPE FALL IS TO COMPLETE WITH CHINESE STANDARDS ROAD
5.5M

- THE POSITION OF THE SANITARY FITTING ON THE DRAWING POINTS ARE INDICATIVE AND APPROXIMATE , THE ACTUAL
POSITIONS SHALL BE BASED ON THE ARCHITECTURE / INTERIOR DRAWINGS.

Check all measurements on site. Do not scale


off drawing This drawing is to be read in
conjunction with the Specification and any
discrepancies are to be immediately reported
ABBREVIATIONS : SLOPE STANDARD : to the Architect. This drawing remains the
copyright property of the Architect and is not
to be reproduced in whole or in part without
permission of the Architect.
ABBREVIATIONS DESCRIPTION ABBREVIATIONS DESCRIPTION MAXIMUM - FILLING
TYPE DIAMETER MINIMUM SLOPE (%)
FACTOR (H/D)
WP WASTEWATER PIPE DP DRAIN PIPE DN50 0.5 2.0
DN80 0.5 2.0
SP SEWAGE PIPE OFP OVER FLOW PIPE DN100 0.7 1.2
STORMWATER PIPE DN125 0.7 1.0 Location: No. 27-3, Fengsheng Road,
VP VENT PIPE T/A TO ABOVE Jiulongpo District, Chongqing, PR China
DN150 0.7 0.7
DN200 0.7 0.5
RWP RAIN WATER PIPE T/B TO BELOW

CW COLD WATER SUPPLY PIPE F/A FROM ABOVE


MAXIMUM - FILLING SLOPE (%)
TYPE DIAMETER FACTOR (H/D)
RD ROOF DRAIN F/B FROM BELOW
STANDARD MINIMUM
FD FLOOR DRAIN A/C ABOVE CEILING DN50 0.5 3.5 2.5
DN80 0.5 3.0 2.0
WC WATER CLOSET U/G UNDER GROUND
SEWAGE PIPE DN100 0.5 2.0 1.2
LAV LAVATORY GV GATE VALVE DN125 0.5 1.5 1.0
DN150 0.6 1.0 0.7
UR URINAL CV CHECK VALVE
DN200 0.6 0.8 0.5
Beijing Zhongrui Electronics System Engineering
CO CLEANOUT FLX FLEXIBLE Design Institute Co.,Ltd
No. 74 Lugu Road Beijing
Tel: +010 68609588 Fax: +010 68633784
Web: WWW.ESEDI.CN
FCO FLOOR CLEANOUT PG PRESSURE GAUGE
Project Title:
BOP BOTTOM OF PIPE Y-STR Y STRAINER 2nd GENERATION FIBER OPTICAL
& CABLING PRODUCTION AND
SPECIAL FIBER R&D BASE PROJECT
COP CENTER OF PIPE POD POINT OF DISCHARGE
Location:

AFFL ABOVE FISNISH FLOOR LEVEL BFV BATERFLY VALVE Building Number : 99-02

TEMPORARY UPC
UFFL UNDER FISNISH FLOOR LEVEL SITE RESTAURANT

HG MANHOLE

BTCT FERRO-CONCRETE M.E.P DRAWINGS

AAV AUTO AIR VENT Drawing Title :

DN DIAMETER NOMINAL NOTES LEGENDS


ABBREVIATION
i SLOPE

WT WATER TAP Project M.E.P: VU MAI THANH

Designed by: CHANH NGUYEN VIET

Drawn by: PHU NGUYEN TIEN

Checked by: BAO NGUYEN NHU

Project No: Issue Date :


A/VN -003 2017.10.19
Cad File No.:
01.China Factory Project \Output\Working Files\

Scale: Dwg No: REV

NTS P-99-AA-B-LEG-0200 01

APPROVAL TO PROCEED
MEP PRINCIPAL

NHON NGUYEN THANH