You are on page 1of 7

LAB EXERCISE # 4

AREA SUBDIVISION

Submitted by

GOZUN, Mark Daniel S.

Submitted to

Engr. Roseanne V. Ramos

December 1, 2017
1. Objectives
This laboratory exercise aims to:
Be familiar with the different techniques in simple subdivision
Be able to subdivide a property
Be able to solve the technical descriptions of the child lots

2. Figure and Technical Description of the Mother lot


Table 1. Technical Description of NCTS Parking Lot

Line Distance(m) Bearing (D-M-S)


C1-C2 20.25656674 N 89-51-10.5 E
C2-C3 19.98904799 S 00-07-31.97 E
C3-C4 20.28129711 S 89-35-55.82 W
C4-C1 19.89911653 S 00-11-45.89 W

Figure 1. Plot of the NCTS Parking Lot Corners

507450

C1 C4
507445

507440

507435

507430 C2 C3

507425
1621000 1621005 1621010 1621015 1621020 1621025
NCTS

3. Figure showing the dividing line, trial line, and closing line
Figure 2. Dividing Line, Trial Line and Closing Line

4. Computations
Table 2. Area Computation of the Mother Lot (C1C2C3C4) using DMD-DPA Method

Line Lat Dep DMD DPA


C1-C2 0.052 -20.2565 -20.2565 -1.053338
C2-C3 19.989 0.0438 -40.4692 -808.9388388
C3-C4 -0.142 20.2808 -20.1446 2.8605332
C4-C1 -19.899 -0.0681 0.0681 -1.3551219
Lat=0 Dep=0 DPA=-808.4867655
1 1
Area of C1C2C3C4 = DPA (808.4867655) 404.2433828m 2
2 2
1

Area of Child Lot = 404.2433828m 2 202.1216914m 2
2
Table 3. Closing Line Distance and Bearing Computation

Lat Dep
C3-C4 -0.142 20.2808
C4-C1 -19.899 -.0681
Lat=-20.041 Dep=20.2127
C1-C3 20.6497 -20.2127

Closing Line:
Distance = ( Lat ) 2 ( Dep ) 2 (20.041) 2 (20.2127) 2 28.469392317 m
Dep -1 20.2127
Bearing = tan -1 tan 4514'39.81' ' N 4514'399.81' 'W
Lat 20.041

Bearing C3-C4 Bearing X-1 S 8935'55.82' ' E


Interior Angles of C1C3X:
X 180 C3 C1 9016'32.21' '
3 C1C 3 C 2C 3 4522'11.78' '
1 C 3C 4 C1C 3 4421'16.01' '

By Sine Law:
sin X sin 1 sin 3

28.46392317 m C1 X X C3

C1-X = 20.25680027 m
X-C3 = 19.8992189 m
Table 4. Latitude and Departure of C1-X and X-C3

Line Distance (m) Bearing (D-M-S) Lat Dep


C1-X 20.25680027 N 89-35-55.82 E 0.1418284938 -20.25630376
X-C3 19.8992189 N 00-07-31.97 E 19.89917113 0.0436033802

Table 5. Area Computation of XC3C4C1 using DMD-DPA Method

Line Lat Dep DMD DPA


C1-X 0.1418284938 -20.25630376 -20.2565 -2.872921052
X-C3 19.89917113 0.0436033802 -40.46900414 -805.2996388
C3-C4 -0.142 20.2808 -20.14460076 2.860533308
C4-C1 -19.899 -0.0681 0.0681 1.3551219
Lat = 0 Dep = 0 -806.6671

1 1
Area of XC3C4C1 = DPA (806.6671484 m 2 ) 403.3335742m 2
2 2

Area of XYZC1 = Area of XC3C4C1 Area YC3C4Z


Area of XYZC1 = 403.3335742m 2 202.1216914m 2 = 201.2118828m 2
Area of XYZC1 = Area of QRZP - Area of QYX Area of IZP
Area of XYZC1 = (IX+IP)(d) - (1/2)(QY)(d) (1/2)(IP)(d)
Area of XYZC1 = (IX+tan )(d) - (1/2)(d2)(tan ) (1/2)(d2)(tan )
Area of XYZC1 = (IX+tan001145.89)(d) - (1/2)(d2)(tan 000731.97)
(1/2)(d2)(tan 001145.89)
Area of XYZC1 = (25.25680027)(d) - (d2)(.000615524379)
d=9.930057348

XY = d/cos = 9.930081187
ZC1 = d/cos = 9.930115498
YC3 = XC3 XY = 9.969137713 m

ZC4 = C4C1 ZC1


ZC4 = 19.89911653 9.930115498 m = 9.969001032

YZ = XC1 + C1P QY
YZ = 20.25680027 m + 0.03398328426 0.02175889956 m = 20.26902465 m

C2-Y = C2-C3 YC3 = 19.98904799 9.969137713 = 10.01991028

Z-C1 = C4C1-ZC4 = 19.89911653 9.969001032 = 9.930115498


5. Results

Lot 1: C3C4ZY

Line Distance Bearing

C3-C4 20.28129711 S 00-07-31.97 E

C4-Z 9.969001031 S 89-35-55.82 E

Z-Y 20.26902465 S 89-35-55.82 W

Y-3 9.96913771 N 00-07-31.97 E

Figure 3. Lot 3YZ4

Lot 2: YZC1C2

Line Distance Bearing

Y-Z 20.26902465 S 89-35-55.82 E

Z-C1 9.930115498 S 00-11-45.89 E

C1-C2 20.05656672 N 89-51-10.5 E

C2-Y 10.01991028 N 00-07-31.97 E


Figure 3. Lot 12ZY

6. Conclusion
Using the data obtained from doing the sideshots for the parking lot of NCTS, we were able to
compute the area of the parking lot by DMD-DPA method. And we were able to subdivide by
applying the techniques for area subdivision. The parking lot has an area of 404.24 m2. The
subdividing line has length 20.23 m and has a bearing of S 89-35-55.82 W.