NOTES:-
CONTRACTOR IS TO CHECK ALL DIMENSIONS AT SITE.
EXISTING R.C. LIFT WALL IF ANY DISCREPANCY FOUND, THE ENGINEER MUST BE
INFORMED IMMEDIATELY.
EXISTING R.C. LIFT WALL
400
CHEMICAL ADHESIVE
400
25mm THK. EPOXY GROUT ON TOP OF UNEQUAL ANGLE
10mm THK. FILLET
WELD ALL ROUND
HACKING LINE 10mm THK. M.S. PLATE 8 NOS. M24 HILTI RE-500 INJECTION
(HACKED SURFACE TO BE ADHESIVE WITH HAS ROD
ROUGHENED AND CLEANED 8 NOS. M24 HILTI RE-500 INJECTION EXISTING R.C. LIFT WALL
TO RECEIVE NEW CONCRETE) ADHESIVE WITH HAS ROD
50
12mm THK. M.S. PLATE
WELDED ON TOP OF NEW 10T25 VERTICAL
200
UNEQUAL ANGLE
175
NEW 10T25 VERTICAL
400
10mm THK. M.S. PLATE WITH
600
NEW 6T25 HORIZONTAL NEW 6T25 HORIZONTAL M24 HILTI RE-500 INJECTION
C1 C1 ADHESIVE WITH HAS ROD
400 (H)
HACKED PORTION
620
170
230
700
175
EPOXY GROUT (HACKED SURFACE TO BE
HACKING LINE ROUGHENED AND CLEANED
200
(HACKED SURFACE TO BE 10mm THK. FILLET WELD ALL ROUND
175 TO RECEIVE NEW CONCRETE)
50
400
ROUGHENED AND CLEANED 10mm THK. M.S. PLATE
C1 C1 TO RECEIVE NEW CONCRETE)
25mm THK. EPOXY GROUT 700 (L)
400mm DEEP PREDRILLED
200
A DA NA N L ABUA
PERBADANAN LABUAN
RB (LABUAN CORPORATION)
PE
N
PETI SURAT 81245
N
LA
BU
A N C O R AT IO 87022 WILAYAH PERSEKUTUAN LABUAN
OR P TEL NO. : 087-408600,408601
FAX NO. : 087-428997,419400,426803
LAMAN WEB : www.pl.gov.my
EXISTING R.C. LIFT WALL
400
10mm THK. FILLET ON TOP OF UNEQUAL ANGLE
FAX : 088-236798
200
50
accordance with good engineering practice and that I take full
230
NEW 10T25 VERTICAL responsibility for the design and proper performance of the
same.
175
NEW 14T25 VERTICAL
400
175 SIGNATURE AND ENGINEERS'S CHOP
600
400 (H)
620
170
HACKED PORTION
TO BE BACKFILLED WITH 10mm THK. M.S. PLATE WITH
D1 D1 200 x 100 x 23 Kg/m EPOXY GROUT M24 HILTI RE-500 INJECTION
UNEQUAL ANGLE WELDED ADHESIVE WITH HAS ROD
HACKED PORTION
175
TO BE BACKFILLED WITH
200
50
400
10mm THK. M.S. PLATE ROUGHENED AND CLEANED HACKING LINE BEHIND
TO RECEIVE NEW CONCRETE) (HACKED SURFACE TO BE
25mm THK. EPOXY GROUT 900 (L) ROUGHENED AND CLEANED ENGINEER'S SIGNATURE
HACKING LINE 400mm DEEP PREDRILLED TO RECEIVE NEW CONCRETE)
EXISTING R.C. LIFT WALL (HACKED SURFACE TO BE D2 HOLE WITH T25 REBAR PROJECT :
ROUGHENED AND CLEANED GROUTED WITH HILTI
200 x 100 x 23 Kg/m PLAN TO RECEIVE NEW CONCRETE) HIL-RE500 CHEMICAL ADHESIVE 200 x 100 x 23 Kg/m UNEQUAL ANGLE
UNEQUAL ANGLE WELDED WELDED TO M.S. PLATE WITH CADANGAN KERJA-KERJA
DETAIL 'D' 10mm THK. FILLET WELD ALL ROUND
SCALE 1: 10 SECTION D2 - D2 MENGUBAHSUAI SEBAHAGIAN PASAR
ELEVATION VIEW SENTRAL LABUAN UNTUK PUSAT
SECTION D1 - D1 SCALE 1: 10 TRANSFORMASI BANDAR (UTC)
ELEVATION VIEW SECARA REKA DAN BINA
SCALE 1: 10
DRAWING TITLE :
LIFT
DETAILS (1)