You are on page 1of 32

4102

:
am.abudhabi.ae

AACM-RI-GL-01
V1.0 26-May-14
()Table of Contents

)3...................................................................................................................................... (Introduction

)4............................................................................................................ (Terms & Conditions

)5.............................. (List of Requirements for Consultants Deliverables

(5................................................................................... )Preliminary Study Stage

)7.......................................................................................... (Drawing Template

)9................................................................................ (Preliminary Design Stage

(14..................................................................................... )Detailed Design Stage

)18........................................................................................................................................ (Appendix

() : ()List of Acronyms

() : )(Minutes of Meeting Form

() : )(Deliverables Comments Register Form

() : )(Drawing Template

() : )(Form For Street Lighting Approval

AACM-RI-GL-01
V1.0 26-May-14
()List of Figures

9 ................................................................... (: )1

9 ......................... (: )2

11 ........................................ (: )3

11 .............................. (: )4

11 ..................................................................................................... (: )5

11 ............................................................................... (: )6

12 ....................................................................... (: )7

15 ................................................................................................. (: )8

AACM-RI-GL-01
V1.0 26-May-14
):(Introduction

-

.

.



.


.

.

AACM-RI-GL-01
V1.0 26-May-14
):(Terms & Conditions

/
.


:
() : )(Minutes of Meeting Form -
() : )(Deliverables Comments Register Form -
() : )(Drawing Template -
() : )(Form For Street Lighting Approval -



( :
... )

.

:


( ) .



.

AACM-RI-GL-01
V1.0 26-May-14
(:)List of Requirements for Consultants Deliverables

()Preliminary Study Stage

.1 (:)Project Background
/ .
.
) (E , N .

.2 (:)Scope of Work
( :
TMP or TIS
... ).

.3 (:)Base Data

( : ... ).

.4 (:)Existing Situation
( : V/C LOS
... ).

.5 (:*)Existing Traffic
( / )
(.)AM, LT & PM
( )Traffic Flow .

.6 (:)Existing Service Utilities Corridors


( ... )
.

.7 (:)Design Criteria
.
.
.
( ).

.8 (:*)Traffic Analysis
( )2 TIS
TMP .

AACM-RI-GL-01
V1.0 26-May-14
.9 ):*(Landscape
.
/ .
" ".

.11 (:*)Proposed Options


.
.

.11 (:)Planning Requirements


.

.NOC

.12 (:*)Traffic Safety


( )1
( )
.

.13 (:)Construction Budget


.
.

.14 (:)Attachments


*
*

AACM-RI-GL-01
V1.0 26-May-14
)(Drawing Template
( )Drawing Template ( )

( )TOR ( )CD ( ).

10, 11 & 12

13, 14 & 15

:
.1 ( : )Terms & Conditions
.
:
1. The consultant is fully responsible for the accuracy of the survey data which has been used
to produce this design. Also, the consultant carries the full responsibility for the design and
the accuracy of executing it on site.
2. All design works has been fully checked by a Senior Engineer other than the Design
Engineer prior to submission to AACM for approval.

AACM-RI-GL-01
V1.0 26-May-14
.2 ( : )Notes .

.3 ) : (Legend .

.4 ) : (Key Plan
( ).

.5 ) : (Revision Table .
.6 ) : (Client
.

.7 ) : (Consultant .

.8 ) : (Project Title ( ).

.9 ) : (Drawing Title ( :
... ).

.11 ) : (Designed By
.

.11 ) : (Checked By (

) .

.12 ) : (Approved By
.

.13 ) : (Drawing Status :


).(Preliminary Design/ Detailed Design/ Tender Issue

.14 ) : (Scale )(1:1000


) (1:500 ) (1:200

.

.15 ) : (Drawing No. ( .)ACONEX


( )Coordinates Grid .

AACM-RI-GL-01
V1.0 26-May-14
()Preliminary Design Stage
()Geometric Design

.1
.
.2 ( GIS )
.
.3 ( )Topographic Survey Plan :

31 (.)1

( :)0


21 ( )Interface (.)2

( :)4

( )
() .
( ).

(.)3

AACM-RI-GL-01
V1.0 26-May-14
( :)3

.4 ( )NOC (
... ).
.5 .
.6
%1.3
( 1.2 1.3) .
( . )4

( :)2

.7 ( )Site Photographs
( )Topographic Survey Plan ( .
)5
.8 ( )1:1111 ( )1:511 (
) :
:

AACM-RI-GL-01
V1.0 26-May-14
:
:
.

( :)5

:
( )Chainage 21 51 ( ).


.
( :
... ) ( .)6
( : ).

( :)6
( )1:511 .
.
.9 .

AACM-RI-GL-01
V1.0 26-May-14
.11
.
.11 ( )Vertical Profile :
.
( )1:1111 ( )1:511 ( )1:251
.
.
.
( ) .
( )
.
.
.
.
( )
(.)7

* ( )

( :)7
()Traffic Safety

( )1
.

()Street-Lighting

:
.1 .
.2 / / .
.3 .

AACM-RI-GL-01
V1.0 26-May-14
. .4
( ) . .5
.6
( ).
( ). .7
( ). .8

( )1:1111
. PDF .

()Storm-Water

. .1
(.)Design Parameters .2
. .3
. .4
(.)Hydraulic Design Calculations .5
( )Utility Corridor .6
.
. .7

:
.

AACM-RI-GL-01
V1.0 26-May-14
()Detailed Design Stage
()Geometric Design

.1
.
.2
( )Interface
.
.3
.
. .4
.5

( )Interface .
(.)Interface .6
.7

:
.
( )Through Lanes
.

.
( )
.
( )

( 11 21 ).
: 21 .8
:

.

(.)8
%1.5
( )Interface .
21
( )Interface .

AACM-RI-GL-01
V1.0 26-May-14

.

( :)8

.9 ( )
:
1.12 .

.
( )1:511

(.)1:1111
( )Flow Lines
.

.11 ( )CD :
( )GENIO .
( )GENIO .
( )PDF + DWG .


.
( )GENIO
.

()Traffic Safety

( )2
.

AACM-RI-GL-01
V1.0 26-May-14
()Road Diversion


( )Emirate Of Abu Dhabi Work Zone Manual
.

()Pavement Design

. .1
. .2
. .3
( )Type of Vehicles ( )Number of Axels . .4
( )Core Test .5
.
(.)Software .6
( )SN . .7
. .8
""AASHTO .9

()Street-Lighting

(.)Corridor .1
( )Road Layout .2
.
( ... ). .3
. .4
(.)Lav/Uo/UL/Ti/SR .5
: .6
.
.
.
.
.
( ). .7
PDF AutoCAD . .8

()Storm-Water

(.)Design Parameters .1
. .2
(.)Hydraulic Design Calculations .3
. .4
(.)Flow Direction .5
( )Low Points (.)High Points .6
(.)Manhole Cover Level & Invert Level .7

AACM-RI-GL-01
V1.0 26-May-14
. .8
( )Gullies (.)Kerb Inlet or Flush Inlet .9
( )Connection Points ( )ILCL .11
( )GL ( )Lagoon GL .
. .11
( ). .12
.PDF .13
( ) . .14
PDF DWG .PDF .15
. .16

: .

AACM-RI-GL-01
V1.0 26-May-14
)(Appendices

()List of Acronyms ()

)(Minutes of Meeting Form ()

)(Deliverables Comments Register Form ()

)(Drawing Template ()

)(Form For Street Lighting Approval ()

AACM-RI-GL-01
V1.0 26-May-14
()
()List of Acronyms

TMP

TIS

LOS

V/C /

NOC

SN

Lav

Uo

UL

Ti ()

SR

CL

IL

GL

AACM-RI-GL-01
V1.0 26-May-14
)Minutes of Meeting Form( : ) (

AACM-RI-GL-01
V1.0 26-May-14
AACM-RI-GL-01
V1.0 26-May-14
AACM-RI-GL-01
V1.0 26-May-14
() :
)(Deliverables Comments Register Form

AACM-RI-GL-01
V1.0 26-May-14
AACM-RI-GL-01
V1.0 26-May-14
AACM-RI-GL-01
V1.0 26-May-14
AACM-RI-GL-01
V1.0 26-May-14
AACM-RI-GL-01
V1.0 26-May-14
AACM-RI-GL-01
V1.0 26-May-14
)Drawing Template( : ) (

AACM-RI-GL-01
V1.0 26-May-14
: ) (
(Form For Street Lighting Approval)

AACM-RI-GL-01
V1.0 26-May-14
AACM-RI-GL-01
V1.0 26-May-14

You might also like