Concrete must be placed within 90 minutes from when the ingredients were added to the mixing drum or it shall not be used. The document specifies that concrete has to be placed within a certain time period after mixing or it cannot be used, and the correct time period listed as an option is 90 minutes.
Concrete must be placed within 90 minutes from when the ingredients were added to the mixing drum or it shall not be used. The document specifies that concrete has to be placed within a certain time period after mixing or it cannot be used, and the correct time period listed as an option is 90 minutes.
Concrete must be placed within 90 minutes from when the ingredients were added to the mixing drum or it shall not be used. The document specifies that concrete has to be placed within a certain time period after mixing or it cannot be used, and the correct time period listed as an option is 90 minutes.
Concrete not place within ____ minutes from the time the ingredients were charged into the mixing drum shall be used. a) 120 minutes c) 60 minutes b) 150 minutes d) 90 minutes