CRITERIA FOR THE ASSIGNMENT OF CONTRACTORS'/CONSULTANTS' MATERIALS
ENGINEERS
a) One (1) project costing not more than P150M
b) Two (2) projects, with an aggregate cost of not more than P250M c) Three (3) projects, with an aggregate cost of not more than P200M d) None of the above