1. Scales for weighing aggregates and cement shall be c. 250 mm


accurate within __ % throughout the range of use. d. 100 mm
Scales shall be inspected and sealed as often as the 9. The contractor shall submit in writing a job-mix
Engineer may deem necessary to assure their formula for the mixture supported by laboratory
continued accuracy. test data along with samples of resources of
a. 1.0% components and viscosity – temperature
b. 1.5% relationships to the Engineer for testing and
c. 0.5% approval at least ___.
d. 2.0% a. Two weeks
2. When cement is placed in contact with the b. Three weeks
aggregate, batches may be rejected unless mixed c. One week
within ___ hours of such contact d. Four weeks
a. 1.5 hours 10. The concrete samples should be stored in a moist
b. 2.0 hours conditioned temperature within the range of
c. 0.5 hours a. 18 °C to 24°C
3. When mixed at the site or in a central mixing plant, b. 15 °C to 18°C
the mixing time shall not be less than ___ nor more c. 14°C to 24°C
than ___ unless mixer performance test prove d. 18°C to 28°C
adequate mixing of concrete in a shorter time 11. This is used in soil stabilized road surface due to its
period. high ___ property, that is, it absorb and retain
a. 30 seconds nor more than 90 seconds water.
b. 50 seconds nor more than 90 seconds a. Potassium Chloride
c. 60 seconds nor more than 120 seconds b. Calcium chloride
d. 90 seconds nor more than 120 seconds c. Magnesium Chloride
4. The flow of water shall be uniform and all water d. Sodium chloride
should be in the drum by the end of the first ___ 12. The mass % wear of soil aggregate used in the
seconds of the mixing period cement/lime proportions should not be more than
a. 45 seconds a. 40%
b. 30 seconds b. 50%
c. 15 seconds c. 45%
d. 20 seconds d. 55%
5. Concrete not placed within ___ minutes from the 13. The uniform rate at which the movable head of the
time the ingredients were charged into the mixing CBR machine travels is
drum shall not be used a. 0.05 in/min
a. 120 minutes b. 0.10 in/min
b. 150 minutes c. 0.08 in/min
c. 60 minutes d. 0.09 in/min
d. 90 minutes 14. Cast in place concrete shall not be post – tensioned
6. When concrete is delivered in truck mixers, until at least ___ and until the compressive strength
additional water may be added to the batch and has reached the strength specified
additional mixing performed to increase the slump a. 7 days
to meet the specified requirement if permitted by b. 10 days
the Engineers, provided all these operation are c. 14 days
performed within ___ after the initial mixing d. 20 days
operation and the water and cement ratio is not 15. The penetration test is an indication of the ___ of
exceeded asphalt
a. 30 minutes a. Consistency
b. 15 minutes b. Softness
c. 45 minutes c. Hardness
d. 60 minutes d. Flash point
7. A sample from a bituminous mix weighs 1000 16. Specification requires one (1) Quality test for every
grams. At extraction, it was found out that the dry ___ of asphalt.
aggregate weighed 950 grams. What is the % of a. 20 tons
asphalt by weight of mix? b. 200 tons
a. 5.2% c. 50 tons
b. 5.0% d. 40 tons
c. 5.4% 17. The ___ is the most commonly used method in the
d. 4.8% design and evaluation of bituminous concrete mixes
8. The minimum penetration of the preservative with a. Job mix formula
the surface of the timber piles shall be b. Design mix
a. 150 mm c. Marshall Stability
b. 200 mm d. Extraction

1
MATERIALS ENGINEER
18. Vibration shall operate a frequency of 8,300 to a. Item 301
9,600 impulses per minute under load at a b. Item 302
maximum spacing of c. Item 304
a. 30 cm d. Item 308
b. 50 cm 28. Unconfined compressive strength test is usually
c. 60 cm performed on
d. 40 cm a. Sandy soils
19. The specific gravity of Sodium Sulfate used in b. Silty soils
soundness test for aggregate should be within the c. Organic soils
range of d. Clayey soils
a. 1.151 to 1.174 29. Consolidation test is usually performed on ___
b. 1.250 to 1.178 samples.
c. 1.051 to 1.154 a. Disturbed
d. 1.058 to 1.184 b. Undisturbed
20. The specific gravity of magnesium sulfate solution c. Consolidated
used in soundness test for aggregate should be d. Both a & b
within the range of 30. A concrete core sample having a maximum height
a. 1.280 to 1.408 of less than ___ of its diameter before capping or
b. 1.180 to 1.308 height less than its diameter after capping shall not
c. 1.295 to 1.308 be tested
d. 1.195 to 1.318 a. 93%
21. Aggregates accounts for 92 – 95% of the weight of b. 94%
the bituminous mixture asphalt accounts for 5 – 8% c. 95%
of the weight of the mix. The exact percentage to d. 96%
be used is determined by the 31. The cohesion and internal friction of soil is tested
a. Trial mix by
b. Design mix a. Tri axial shear test
c. Job mix b. Direct shear test
d. Job order c. Bearing test
22. It is an indication that the asphalt mix is overheated d. All of the above
a. Blue smoke 32. In concrete acceptance, cores will be considered
b. Stiff appearance adequate if the average strength of the cores is
c. Rising steam equal to what?
d. Mix slumps in truck a. 80% of specified strength & if no single core is
23. In checking the temperature of the mix, the less than 75% of specified strength
thermometer should be inserted into the mix at b. 90% of specified strength & if no single core is
least less than 80% of specified strength
a. 2 inches c. 85% of specified strength & if no single
b. 6 inches core is less than 75% of specified
c. 4 inches strength
d. 6.0 mm 33. Before the cement is to be used, sampling must be
24. It is applied on existing bit, or cement concrete done at least ___ before use
surface with bituminous materials. a. One week
a. Bituminous Prime Coat b. 14 days
b. Bituminous Tack Coat c. Two weeks
c. Bituminous Seal Coat d. 12 days
d. Bituminous Surface Treatment 34. Asphalt cement shall not be used while it is foaming
25. The solution used in the soundness test of nor shall be heated at ___ at anytime after delivery
aggregates shall be cooled to a temperature of 21 a. 107°
± 1°C and maintain at that temperature for at least b. 159°
a. 24 hours c. 120°
b. 36 hours 35. Moisture content of aggregates in bit. mix shall not
c. 48 hours exceed ___ of the time it is introduced into the
d. 18 hours mixing unit.
26. Proper compaction of the fill materials is very a. 1.5 mass %
important, as it will b. 2 mass %
a. Increase the shear strength c. 1 mass %
b. Decrease permeability 36. Batching tolerance for Sand Aggregates is
c. Minimize compressibility a. 1%
d. All of the above b. 2%
27. In which DPWH item is emulsified asphalt not c. 3%
suitable?

2
MATERIALS ENGINEER
37. Between stages of curing, concrete shall not be d. 3.4 mm
exposed for more than how many hours? 48. Minimum density of gabions is
a. 24 hours a. 1,000 kg/m3
b. 3 hours b. 1,200 kg/m3
c. ½ hour c. 1,400 kg/m3
d. 72 hours d. 1,500 kg/m3
38. As a Materials Engineer, what will you do with 49. Soundness loss of field gabions is
major honeycombed area that is considered as a. 9% after 5 cycles
defective work? b. 10% after 5 cycles
a. Plaster c. 11% after 5 cycles
b. Payment of the concrete will be made an d. 12% after 5 cycles
adjustment 50. The heating temperature of reflectorized
c. Removed and replaced at the expensed thermoplastic material during application is
of the Contractor a. 130±7°C
39. If the strength of control specimen does not meet b. 150±7°C
the requirement and not feasible to obtain cores c. 200±7°C
due to structural consideration, as a Materials d. 211±7°C
Engineer what will be your decision 51. Submission of sample minimum quantity of material
a. Removed and replaced for asphalt cement is
b. Area will not be paid a. 5 kg
c. Payment will be made at an adjusted b. 10 kg
price. c. 20 kg
40. After concrete has been placed, it is advisable to d. 100 kg
maintain fully welted and in position for how many 52. For how many years does a small Contractor given
hours? to procure necessary testing equipment
a. 14 hours a. 2 years
b. 24 hours b. 4 years
c. 72 hours c. 5 years
d. 15 to 18 hours d. 6 years
41. Rock shall be excavated to a depth of ___ below 53. The depth of the weakened joints must not be less
subgrade within the limit of the roadbed. than ___ and a width of ___
a. 100 mm a. 40 mm & 6 mm
b. 150 mm b. 50 mm & 5 mm
c. 200 mm c. 40 mm & 5 mm
42. Minimum penetration of all piles shall be 3 meter d. 50 mm & 6 mm
a. 6 meters 54. Used of bituminous cold mix for potholes patching
b. 7 meters during rainy/wet period is acceptable
c. 4.5 meters a. True
43. Piles shall not be driven within 7 meters of concrete b. False
less than ___ old. 55. In soil, all boring shall be carried to a depth of at
a. 7 days least ___ below the proposed gradeline.
b. 14 days a. 0.5 meter
c. 28 days b. 1.0 meter
44. Paint contains ___ of pigment and ___ vehicle. c. 1.5 meter
a. 20% and 80% d. 1.8 meter
b. 21% and 79% 56. The test that determine pile bearing capacity by
c. 79% and 21% loading one or more pile and measuring settlement
d. 80% and 20% under load is
45. Minimum thickness of bedding materials beneath a. Vane shear test
the pipe is ___. b. Plate bearing test
a. 100 mm c. Pile load test
b. 150 mm 57. The weight of disturbed samples from hard auger
c. 200 mm or split spoon shall be at least
46. Tolerance of gabion dimension is a. 1 kg
a. ±1% b. 20 kg
b. ±2% c. 15 kg
c. ±3% d. 40 kg
d. ±4% 58. Submission of sample for testing for cement is
47. Minimum size of galvanized wire mesh is a. 10 kg
a. 2.0 mm b. 20 kg
b. 2.2 mm c. 15 kg
c. 2.7 mm d. 40 kg

3
MATERIALS ENGINEER
59. The length of Shelby Tube of an undisturbed d. 20±1 mm
sample is 69. What is the temperature of a concrete sample?
a. 10” long a. 10 – 15 °C
b. 18” long b. 18 – 24 °C
c. 20” long c. 15 – 18 °C
60. For small project where quantity of steel bars is 70. What is the wash loss of fine aggregates in the no.
10,000 kg or less, what is the basis for acceptance 200 sieve?
of material? a. 1%
a. No testing b. 2%
b. P.E. certificate c. 3%
c. Mill certificate d. 4%
61. It determines the best combination of the material 71. Retarder can delay the testing time of concrete up
that will produce a potentially stable & durable to how many hours?
mixture a. 1 hour
a. Job mix formula b. 2 hours
b. Marshall formula c. 4 hours
c. Design of bituminous mix d. 8 hours
62. It is the rate of loading for concrete cylinder sample 72. Superplasticizer can increase the strength of
subject to compression test. concrete in 24 hours by how many percent?
a. 20 – 40 psi/sec a. 40 – 60%
b. 20 – 50 psi/sec b. 50 – 60%
c. 15 – 40 psi/sec c. 50 -70%
d. 15 – 50 psi/sec d. 60 – 70 %
63. In the soil exploration, if the characteristic of rock is 73. It is the moisture in an air-dried soil.
questionable, the minimum depth of boring into the a. Moisture content
bedrock should be b. Natural moisture content
a. 1.5 meters c. Hygroscopic Moisture Content
b. 2.0 meters d. Hydrometer Moisture content
c. 2.5 meters 74. It is the tolerance of temperature of mix in
d. 3.0 meters bituminous.
64. Determines soil bearing capacity by loading a steel a. 10°C
plate usually 30” diameter b. 12°C
a. Vane shear test c. 15°C
b. Plate bearing test d. 18°C
c. Pile load test 75. The number of measurement taken in a core
d. None of the above sample of thickness determination of the finish
65. How many hours does aggregate stockfile on asphalt pavement.
binned for draining before being batch? a. 3
a. 1 hour b. 4
b. 6 hours c. 5
c. 12 hours d. 8
d. 24 hours 76. In the absence of beam mold in site, cylinder mold
66. What is the relative strength of mortar at 7 & 28 is allowed by specification. What is the required
days of fine aggregates, when tested for the effect strength?
of organic impurities, which is higher than the a. 2,500 psi
standard? b. 3,000 psi
a. Not less than 90% c. 3,500 psi
b. Not less than 80% d. 4,000 psi
c. Not less than 95% 77. Prime coat shall be left undisturbed for at least
d. Not less than 98% a. 6 hours
67. What is the rate of loading for concrete beam b. 12 hours
tested for flexural stress? c. 24 hours
a. 110 – 150 psi/sec 78. The first phase of rolling the spread bituminous mix
b. 115 – 150 psi/sec is called breakdown rolling which is carried out by
c. 125 – 175 psi/sec pneumatic roller, temperature requirement must be
d. 130 – 175 psi/sec a. 200 – 225 °F
68. In concrete sampling, paste shall be of normal b. 190 – 199 °F
consistency of ___ when the rod settles to a point c. 160 – 180 °F
below the original surface in 30 seconds d. 150 – 185 °F
a. 10±1 mm 79. How many gradation ranges for hot plant mix
b. 11±1 mm bituminous pavement are there in the blue book?
c. 15±1 mm a. 5

4
MATERIALS ENGINEER
b. 6 c. 0 – 20
c. 7 d. 0 – 25
d. 8 93. It indicates good subbase materials when G.I. is
80. What is the plasticity index of mineral filler? equal to
a. Not greater than 4 a. 0
b. Not greater than 6 b. 5
c. Not greater than 8 c. 10
d. Zero d. 20
81. If no core had been taken at the end of each day of 94. It indicates very poor subbase materials when G.I.
operation and the project has already been is equal to
completed, a core shall be taken a. 0
a. For every 75 l.m./lane b. 5
b. For every 100 l.m./lane c. 10
c. For every 150 l.m./lane d. 20
d. For every 1,000 l.m./lane 95. It indicates the composition of soil
82. It is the slump of workable concrete if vibrated a. Atterberg Limit
a. 10-20 mm b. Plasticity Index
b. 10-40 mm 96. The higher the value of PI of the given soil, the
c. 40-50 mm weaker will be the soil performance
d. 40-75 mm a. True
83. Burnt product which is used by Gypsum and b. False
pulverized to form Portland Cement c. Depends
84. d. None of the above
85. 97. It is the Plasticity Index of ___ group of soil
86. It is the limit where further loss of water due to a. 0 Find
evaporation which will not result in reduction of b. 6
volume. c. 10
a. Plastic limit d. 11
b. Liquid limit 98. It is the minimum percent of A-6 group
c. Shrinkage limit classification of soil
87. It is a classification of soil which 35% or less the a. 0%
particles pass through no. 200 sieve. b. 25%
a. Grain size soil c. 35%
b. Granular materials d. 36%
c. Silty clay materials 99. It is the maximum of G.I. of Silty Clay Materials
d. Clayey materials a. 0
88. It is a classification of soil which 35% of more of b. 25
the particles pass through no. 200 sieve. c. 20
a. Course sand soil d. 35
b. Granular materials 100.When the value of G.I. is negative, what will be the
c. Silty-clay materials soil performance?
d. Clayey materials a. Poor subgrade
89. It evaluates the quality of soil as highway subgrade b. Very good subgrade
material c. Good subgrade
a. Atterberg limit d. None of the above
b. Plasticity index 101.The weight of Sandy soil for Hydrometer Analysis is
c. Group index a. 10 grams
d. Liquid limit b. 25 grams
90. When soil has Plasticity index value of 10, what’s c. 50 grams
the criteria of the material? d. 100 grams
a. Coarse grain 102.The weight of Clayey or Silty soil for Hydrometer
b. Sandy Analysis is
c. Clayey a. 10 grams
d. Silty b. 25 grams
91. When Plasticity Index is equal to ____ soil is c. 50 grams
a. Coarse grain d. 100 grams
b. Sandy 103.A 25 grams of fine grained soil can be dried in
c. Clayey about
d. Silty a. 1 hour
92. It is an empirical number used in evaluation of G.I. b. 2 hours
a. 0 – 15 c. 3 hours
b. 5 – 20 d. 4 hours

5
MATERIALS ENGINEER
104.A 25 grams sandy soil can be dried in about 114.It determines the resistance of the emulsion to
a. 1 hour break when mixed with mineral aggregates
b. 2 hours a. Viscosity Test
c. 3 hours b. Distillation Test
d. 4 hours c. Spot Test
105.It is a type of soil in which moist of the soil grains d. Cement Mixing
are of the same size 115.It is an instrument used for rapid in – situ
a. Poorly graded measurement of the structural properties of existing
b. Well graded road pavement.
c. Gap graded a. Pundit Ultra Sonic Concrete Tester
d. None of the above b. Dynamic Core Penetrometer
106.The soil grained are forced apart by the water c. Falling Weight Deflectometer
added, thus the grain is reduced, what is the d. Core Test
method used? 116.How many days does the emulsified asphalt must
a. Lubrication be tested after delivery at temperature 40 °F
b. Welting (4.5°C)
c. Swelling a. 10 days
d. Saturation b. 12 days
107.Percent passing loose for coarse aggregates when c. 14 days
tested for clay lump is d. 16 days
a. 0.1 mass percent 117.In bituminous mixture asphalt content is 5 – 8%
b. 0.25 mass percent and 92 to 95% aggregates, what will be the
c. 0.8 mass percent amount of additives?
d. 1.0 mass percent a. Not more than 2%
108.The mass percent passing loose for coarse b. Not more than 3%
aggregates when tested in soft fragment is c. More than 2%
a. 0.10 d. More than 4%
b. 0.25 118.It determined the effect of water on the cohesion of
c. 3.5 the mixture
d. 1.00 a. Stability test
109.If slag is used, the density of coarse aggregates is b. Solubility
a. 30 – 100 kg/m3 c. Distillation
b. 150 kg/m3 d. Immersion-Compression Test
c. 1,120 kg/m3 119.The distance of the sample by grooving before
d. 1,400 kg/m3 rotating the brass cup is
110.Mass percent loose for fine aggregates when tested a. 1/4”
in Clay lumps is b. ½”
a. 0.10 c. ¾”
b. 0.25 d. 1”
c. 0.80 120.The most common method of assessing strength
d. 1.0 and stiffness of both subgrade and pavement is
111.It is a type of cement which shall be transferred to a. FDT
an elevated, air tight and weather proof bins b. CBR
storage c. SPT
a. Portland Cement d. None of the above
b. Pozzolan Cement 121.How many days do the specimens for CBR soaked?
c. Bulk Cement a. 1 day
d. None of the above b. 2 days
112.Scales for weighing aggregates and cement shall be c. 3 days
accurate within d. 4 days
a. 0.1% 122.When mixed at the site or in a central mixing plant,
b. 0.25% the mixing time shall not be less than __ seconds
c. 0.5% nor more than ___ seconds unless mixer
d. 1.9% performance test prove adequate mixing of the
113.The minimum thickness of conventional concrete as concrete in a shorter time period
the surface course in monolithic concrete pavement 50 seconds nor more than 90 seconds
is 123.The batches shall be so charged into the drum that
a. 50 mm a portion of the mixing water shall enter in advance
b. 75 mm of the cement and aggregate. The flow of water
c. 100 mm shall be uniform and all water should be in the
d. 150 mm drum by the end of the ___ seconds of the mixing
period

6
MATERIALS ENGINEER
15 seconds 138.Weight of silty or clayey soil needed for Hydrometer
124.The time elapsed from the time water is added to test is
the mix until the concrete is deposited in place at 50 grams
the site shall not exceed ___ minutes when 139.These are widely used to control the characteristics
concrete is hauled in truck mixer of soil which are to be incorporated in roadways
90 minutes Liquid and Plastic Limits
125.When concrete is delivered in truck mixers, 140.This is defined as the highest moisture content of
additional water may be added to the batch and which the mass attains its minimum volume but
additional mixing performed to increase the slump continues to lose weight/mass
to meet the specified requirement if permitted by Shrinkage Limit
the Engineer, provided all these operations are 141.It is an apparatus used in determination of specific
performed within ___ after the initial mixing gravity of Hydraulic Cement
operations and the water and cement ratio is not Le Chattelier Flask
exceeded 142.It is an equipment used in determination of
45 minutes soundness of Portland Cement
126.Concrete not placed within __ minutes from the Autoclave Machine
time the ingredients were charged into the mixing 143.Asphalt shall be homogenous, free from water, and
drum should not be used shall not foam when heated to
90 minutes 175 °C (347 °F)
127.The completed pavement shall be accepted on a lot 144.It indicates the rate at which the asphalt emulsion
basis. A lot shall be considered as ___ linear meter will break when mix with aggregate
double lane. Cement Mixing Test of Asphalt
500 linear meters 145.The lost in weight of rock used in gabions when
128.Each lot shall be divided into ___ equal segment tested to sodium sulfate, soundness loss shall not
and one core will be obtained from each segment in exceed
accordance with AASHTO T 24 9%
5 146.Gabions dimensions are subject to a tolerance limit
129.Aggregate account for 92 – 95% of the weight of of
the bituminous mix while asphalts for 5 – 8% of the ±3%
weight of the mix. The exact percentage to be used 147.The pour point of concrete joint sealer shall be at
is determined by the least ___ lower than the safe heating temperature,
Trial Mix which is the maximum temperature to which the
130.It is an indication that the asphalt is over heated. material may be heated without exceeding the
Blue Smoke permitted flow
131.The penetration test is an indication of the ___ of 11 °C (20 °F)
the asphalt 148.The penetration of concrete joint sealer, Hot Poured
Consistency Elastic Type shall not exceed
132.It is the most commonly used method in the design 90
and evaluation of bituminous concrete mixes 149.The CBR is generally selected at ___ penetration
Marshall Stability Test 2.54 mm (0.10 in)
133. It determines the asphalt content in the 150.IF the ratio at 5.08 mm (0.21 m) penetration is
bituminous mixes greater the test should be
Extraction Test Rerun
134.Cast in place concrete shall not be post-tensioned 151.IF the check test gives similar result, the ratio at
until at least ___ days and until the compressive 5.08 mm penetration shall be
strength has reached the strength specified Adopted or used
10 days 152.The penetration piston of CBR machine should have
135.This is the characteristic generally used for a uniform penetration at a rate of 1.30 mm/min
calculation of the volume occupied by the 153.During soaking maintain the water level in the mold
aggregate in various mixtures containing at the soaking tank is approximately ___ mm above
aggregates including Portland Cement Concrete, the top of the specimen
bituminous concrete, and other mixtures that are 25.40 mm (1.0 in)
proportioned or analyzed on the absolute volume 154.Soak the specimen for ___ hours
basis 96 hours (4 days)
Bulk Specific Gravity 155.The diameter of penetration piston is
136.It pertains to the Relative density of the soil 49.63±0.13 mm (1935 mm2)
material making up the constituents particles not 156.The temperature of the asphalt cement delivered to
including the pore space within the particles that is the mixer shall be as required to achieve a kinetic
accessible to water viscosity in the range of
Apparent Specific Gravity 150 to 300 mm2/s or 150 to 300 centistokes
137.Weight of sandy soil needed for Hydrometer test is 157.It is the viscosity used to grade asphalt cement
100 grams 140 ° F (60°C)

7
MATERIALS ENGINEER
158.The coarse aggregate used in asphalt mix is 176.This is an accelerated test to show the loss of
Retained by 2.36 mm (No.8) sieve volatiles when the sample is heated at 163 °C for
159.The application temperature of emulsified asphalt five hours and the loss due to volatilization is
ranges from determined
10 - 71°C Loss on Heating
160.When tar is used for seal coats, it shall be heated to 177.This test classifies the different asphalt into types
free flowing but not to exceed and the different types into grade
149 °C Consistency Test
161.It is used to determine the soil strength parameter 178.For liquid materials, this test is run on the residue
Unconfined and Tri-Axial Compression Test after distillation
162.It is used to determine the settlement characteristic Quality Test
of soil 179.This is one of the most important engineering
Consolidation properties of soil. It is defined as is the ability to
163.The weight of disturbed samples from hard auger resist sliding a long internal surface within the mass
or split spoon shall be at least Shearing Strength of Soil
1.0 kg 180.This is an arbitrary measurement of consistency
164.The undisturbed samples from Shell by Tube shall and is the basis of classification of all solid and
be at least semi-solid asphalt Penetration Test of Asphalt
18” long 181.This is a process to measure the consistency of
165.It determines the pile bearing capacity by loading liquid asphaltic materials to determine the fluidity or
one or more piles and measuring settlement under resistance to flow Viscosity Test
load 182.It was developed in order to differentiate
Pile Load Test bituminous materials with respect to hardening
166.It determines the in – situ shear strength of soft to characteristics
medium clay Thin Film Oven Test
Vane Shear Test 183.Plant-mixed bituminous mixtures should be sampled
167.It determines the soil bearing capacity by loading a in accordance with the Standard Method of
steel plate usually 30 inches in diameter Sampling Bituminous Mixtures. A sample not less
Plate Bearing Test than ___ kg is taken and place in sample bag would
168.Laboratory which measures,, examines, calibrates insure against contamination. This is taken every 75
or otherwise determines the characteristic or m3 or 130 tons of mix
performance materials or products 10 kgs
Testing Laboratory 184.The bearing blocks of the compression machine
169.Standard technical procedure to determine one or should be at least ___ greater than the diameter of
more specified characteristic of material product is the specimen
called 3.0%
Test Method 185.The bottom bearing block shall be at least ___ thick
170.A document which prevents the test results and when new
other information relevant to test is called 1.0 inch (25 mm)
Test Report 186.The bottom bearing block shall be at least ___ thick
171.It is a document signed by the Director of BRS after any resurfacing operation
issued to Testing laboratories authorizing them to 0.9 inch (22.50 mm)
perform the required test in behalf to DPWH 187.The curing temperature of a specimen before
Certificate of Accreditation testing is
172.These tests have been developed to measure the 18°C to 24°C
loss of cohesion as a result of water action on the 188.The apparatus used to determine the flash point of
compacted bituminous mixture asphaltic material is called
Film Stripping & Immersion – Compression Cleveland Open Cup
Test 189.The asphalt samples for ductility and penetration
173.This means porosity or perviousness of the mixture, test should be subjected to water bath at a
a dense grade mix prevent water from entering the temperature of 25 °C for
base through the surface 1 ½ hours
Permeability 190.The concrete shall not be left exposed for more
174.This is used in classifying liquid asphaltic into than ___ hour between stages of curing or during
grades. It is useful as the measure to control of the curing period
consistency, particularly when run at the ½ hour
temperature of intended application. 191.The rate of application of bituminous prime coat is
Viscosity Test a. 1 – 2 L/m2
175.This test determines the total bitumen content of b. 0.2 – 0.7 L/m2
asphaltic materials, which is the actual cementing c. 0.2 – 1.5 L/m2
constituent of the asphalt d. 0.5 – 2 L/m2
Solubility Test 192.Another name for asphalt joint filler is

8
MATERIALS ENGINEER
a. Asphalt cement a. Slump test
b. Rock asphalt b. Specific gravity
c. Blown asphalt c. Abrasion test
d. Cutback asphalt 205.What is the dimension of concrete cylindrical
193.In asphalting works, there are ___ phases of rolling sample?
a. 2 a. 6” diameter and 12” high
b. 3 b. 4” diameter and 8” high
c. 1 c. 8” diameter and 12”high
d. 4 206.In the absence of concrete beam molds at the
194.The ___ test determines the asphalt content in the project site, are concrete cylindrical molds allowed
bituminous mix by the specifications to be used in sampler for item
a. Grading 311 – PCCP?
b. Bulk Specific Gravity a. Yes
c. Extraction b. No
d. Absorption c. Maybe
195.In a bituminous mix, there are 3 kinds of 207.The minimum percent compaction for embankment
aggregates. What kind passes the no. 200 sieve? is
a. Coarse a. 92%
b. Fine b. 97%
c. Mineral Filler c. 95%
d. Admixtures 208.The minimum percent compaction for base of the
196.Liquid asphalt is also called rod is
a. Cutback asphalt a. 100 %
b. Emulsion b. 105%
c. Blown asphalt c. 110%
d. Asphalt cement 209.The CBR value of aggregate base course is not less
197.The different test for soil classification are than
a. Compaction and FDT a. 80%
b. Hydrometer test and Moisture content b. 90%
c. Grading, LL and PL test c. 85%
198.The apparatus/ equipment used in the liquid limit 210.The CBR value of aggregate subbase course is not
and plastic limit test is called less than
a. Sieves and chisel a. 25%
b. Mortar and pestle b. 30%
c. Atterberg Device and glass plate c. 35%
199.It is a method of laboratory sampling 211.The minimum compressive strength for class A
a. Mixing concrete is
b. Proportioning a. 3000 psi
c. Using mechanical splitter/quartering b. 2400 psi
200.In laboratory compaction test/ moisture density c. 5000 psi
relation test, what is the specification of rammer? 212.What is the significance of determination of tensile
a. 5.5 lb (2.5 kg) with 12 in drop properties of reinforcing steel bars?
b. 8 lb (3.6 kg) in weight with 16 in drop a. This method is intended to determine the
c. 10 lb (4.5 kg.) in weight with 19 in. drop yield and tensile strength of the bar as
201.What is the specification of mass percent passing in well as its elongation, and is used to
sieve 0.075 mm (no. 200) grading “A” for classify the bars into grade
aggregate base course b. This method is intended to evaluate
a. 20 – 14 the ductile properties of the
b. 0 – 12 reinforcing bars
c. 0 – 6 c. None of the above
202.The number of specimen samples in testing 213.A tie bar should be
concrete hollow blocks is a. Deformed bar
a. 6 pcs/20,000 units (3 for absorption test b. Round bar
and 3 for strength test) c. Flat bar
b. 4 pcs/20,000 units 214.A dowel bar should be
c. 8 pcs/20,000 units a. Deformed bar
203.Is it really necessary to cure concrete specimen? b. Round bar
a. Yes c. Flat bar
b. No 215.The mortar for masonry shall consist of
c. None of the two a. One part Portland Cement and 2 parts of
204.The kind of test that determines the consistency of sand
concrete is b. One part Portland Cement and 3 parts of sand

9
MATERIALS ENGINEER
c. One part Portland Cement and 4 parts of sand c. Joint Filler
216.The apparatus used to measure the thickness or 227. Asphalt is defined as
height of compacted bituminous paving mixture a. A petroleum product
a. Ruler b. A dark brown to black cementitious
b. Vernier Caliper materials whose consistency ranges from
c. Steel tape solid to semi-solid and whose main
217.It is used in calculating the unit weight of the constituent is called bitumen which is
mixture and the degree of compaction of the either found in nature or as a residue in
asphalt pavement. petroleum refining
a. Bulk Specific Gravity of compacted c. None of the above
bituminous mixtures using saturated 228.It is a kind of liquid asphalt which is a mixture of
surface dry specimen asphalt cement and water with emulsified with
b. Dry unit weight of compacted bituminous pungent door
mixtures a. Emulsified asphalt
c. Mass of the specimen in water b. Asphalt cement
218.The test which covers the quantitative c. Rapid curing asphalt
determination of bitumen in hot-mixed paving 229.Joint filler in concrete pavement is a
mixtures and pavement samples for specification a. Blown asphalt
acceptance, service evaluation, control and b. Hot asphalt
research. c. Liquid asphalt
a. Extraction 230.A device used to measure the relative hardness of
b. Spot test asphalt is called
c. Flash point a. Penetrometer
219.The solvent used in extraction of bitumen is b. Spectrometer
a. Diesel oil c. Vicat apparatus
b. Gasoline 231.A property of asphalt cement to stretch without
c. Water breaking is called
220.The percent of bitumen content is computed based a. Ductility
on b. Durability
a. Mass of raw sample c. Tensile
b. Mass of dry aggregate 232.It is a point where the volatile components of
c. Mass of asphalt asphalt will evaporate
221.The method used to determine the grading of a. Fire point
aggregates extracted from bituminous mixtures is b. Flash point
a. Mechanical analysis of extracted c. Center point
aggregates 233.It determines whether asphalt is over heated or not
b. Stability Test during the process of manufacture
c. Viscosity a. Spot test
222.The drying temperature of sample is b. Boil test
a. 110±5 °C c. Extraction test
b. 100±5 °C 234.An apparatus used to determine the specific gravity
c. 100 °C of asphalt is called
223.It is a solid asphalt which is a basic constituent of a. Metal Pycnometer
all other asphalt called as hot asphalt or penetration b. Glass Pycnometer
grade asphalt c. Any bottle
a. Asphalt Cement 235.Consistency test for asphalt is called
b. Emulsified Asphalt a. Viscosity
c. Cutback Asphalt b. Slum test
224.It is a kind of liquid asphalt which is a mixture of c. Loss in ting
asphalt cement and kerosene. 236.A process of volatilization test which measures the
a. Medium Curing Cutback relative proportion of asphalt to oil
b. Asphalt Cement a. Distillation
c. Rapid Curing Cutback b. Extraction
225.It is a kind of liquid asphalt which is a mixture of c. Float test
asphalt cement and oil. 237.It is a period wherein the asphalt begins to melt
a. Slow Curing Cutback a. Softening point
b. Emulsified Asphalt b. Boiling point
c. Blown Asphalt c. Fire point
226.It is a kind of liquid asphalt which is a mixture of 238.The sampling requirement of asphalt is
asphalt cement and gasoline a. 1 sample for every 200 drums or 40
a. Rapid Curing Cutback metric tons
b. Blown Asphalt b. 1 sample for every 100 drums

10
MATERIALS ENGINEER
c. 1 sample for every shipment 251.The rate of application of prime coating using
239.The component of bituminous mixes which range cutback asphalt is
from 92 to 96% is called a. 1 to 2 liters/m2
a. Bituminous blended aggregate b. 0.5 to liter/m2
b. Concrete aggregate c. 2 to 3 liters/m2
c. Sand 252.The rate of application of tack coating using liquid
240.It is a property of bituminous mixes in pavement to or emulsified asphalt is
resist deformation or displacement due to impose a. 0.2 – 0.7 li/m2
load or repeated loading. b. 0.1 – 0.5 li/m2
a. Stability c. 2 li/m2
b. Flexibility 253.The rate of application of seal coat using asphalt
c. Ductility cement is
241.It is a property of bituminous mixes in pavement to a. 0.9 – 1.8 li/m2
resist disintegration or deterioration due to the b. 10 – 11 li/m2
action of water, traffic and changing climate c. 8 – 9 li/m2
a. Durability 254.The rate of application of seal coat using cutback
b. Flexibility asphalt is
c. Ductility a. 1.5 – 3.0 li/m2
242.It is a property of bituminous mixes in pavement b. 2.0 – 3.0 li/m2
adjust itself to settlement c. 1 – 2 li/m2
a. Flexibility 255.The primary quality control mechanism for the
b. Rigidity production of asphalt mixes with high degree of
c. Hardness uniformity that will satisfy job requirements is
243.These are the factors affecting the workability of a. Job-mix-formula
bituminous mixes. b. Quality control formula
a. Gradation of aggregate, quality of c. Assurance
asphalt, and temperature of mix 256.The objective of designing the asphalt mixture is
b. Surface texture and temperature mix determination of
c. Quantity of aggregates and asphalt content a. Type and grade of asphalt, proportion of
244. coarse, fine and mineral filler, if used, and
245.The dry molded asphalt sample in the immersion asphalt content.
compression test is submerged in water for b. To produce a desirable characteristics of
a. Four days pavements which are stable, durable and
b. Four hours flexible and skid resistant
c. Two days c. All of the above
246.The percent index retention is computed in the 257.The percent asphalt content in hot laid bituminous
formula mixture ranges from
a. Wet stability/Dry Stability x 100 a. 5 to 8%
b. Dry Stability/Wet Stability x 100 b. 4 to 6%
c. Wet Stability – Dry Stability/Dry Stability x 100 c. 5 to 10%
247.The sampling requirement of bituminous mixes is 258.The placing temperature for bituminous mixture
a. One sample for every 75 m3 measured in truck prior to dumping is
b. One sample for every 150 m3 a. At least 107 °C
c. One sample per delivery per day b. At least 120 °C
248.The application of liquid asphaltic material on a c. At least 150 °C
prepared untreated base is 259.The second phase of rolling the spread bituminous
a. Prime coating mixture is called breakdown rolling which is the one
b. Seal coating responsible to attain the maximum density. This
c. Tack coating rolling is carried out by the use of
249.The application of liquid asphaltic material to an a. Pneumatic roller
existing surface of a base is b. Steel roller
a. Tack coating c. Sheep foot roller
b. Seal coating 260.The significance of final rolling is to remove the
c. Prime coating roller marks to previous rolling in order to have a
250.The application of asphaltic material and aggregate good finish pavement with a temperature of 160 °F.
to an existing surface for the purpose of sealing it a. True
against the infiltration of water or surface moisture b. False
is called c. Maybe
a. Seal Coating 261.The proper way of rolling should begin at
b. Tack Coating a. The sides and proceeds longitudinally
c. Prime Coating towards the roads center, each strip
overlapping on half the roller width,

11
MATERIALS ENGINEER
gradually progressing the crown of the 272.Mass percent of wear of coarse aggregates for item
road. 311 when tested by AASHTO 96 is not greater than
b. The center and proceeding longitudinally a. 40%
toward the side of the road. b. 45%
c. Any part of the road provided each strip c. 50%
overlapping on half the roller width 273.The design of concrete mix specified by the blue
262.What is the minimum degree of compaction of book is based on
asphalt pavement? a. Absolute Volume Method
a. Not less than 97% of the density of the b. Area Method
laboratory compacted specimens c. American Method
b. Not less than 100% of the density of the 274.The minimum flexural strength requirement of
laboratory compacted specimens beam sample when tested by third point loading
c. Not less than 85% of the density of the method
laboratory compacted specimens a. 3.5 Mpa
263.What is the color of asphalt when it is overcooked? b. 3.8Mpa
a. Yellowish brown c. 4.0 Mpa
b. Black 275.The minimum flexural strength requirement of
c. Gray beam sample when tested by midpoint method is
264.It determines the thickness and density of a. 4.5 Mpa
compacted asphalt pavement b. 3.5 Mpa
a. Core Test c. 5.0 Mpa
b. Field Density Test 276.These are additives used in mixing concrete
c. X-Ray a. Sodium Chloride
265.The cored sample of asphalt pavement is measured b. Admixtures
at c. Curing Agent
a. Approximately quarter points 277.These determines the consistency of concrete.
b. Three points a. Slump test
c. Two points b. Consolidation test
266.Too much asphalt content in the bituminous mixes c. Viscosity
causes 278. Equipment used in the consolidation of fresh
a. Bleeding concrete
b. Potholes a. Jack hammer
c. Cracks b. Vibrator
267.The wearing away of the pavement surface caused c. Drilling machine
by the dislodging of aggregate particle is called 279.The prescribed forms to be used in concrete paving
a. Raveling is called
b. Alligator crack a. Steel forms
c. Rutting b. Wooden
268.Interconnected cracks forming a series of small c. Combination of steel and wood
blocks resembling an alligator’s skin or chicken wire 280.The initial setting time of Portland cement is not
is called less than
a. Alligator cracking a. 30 min
b. Reflection cracking b. 60 min
c. Bleeding c. 90 min
269.It is the type of cement to be used in the DPWH 281.The final setting time of Portland cement Type I is
infrastructure projects as indicated in the Blue Book a. 10 hours
a. Portland Cement Type I b. 24 hours
b. Pozzolan Cement c. 36 hours
c. Portland Cement Type II 282.The standard sand used in testing the mortar
270. If the fine aggregates are subjected to five cycles strength of Portland cement is called
of sodium sulfate soundness test, the weighted loss a. Ottawa sand
shall not exceed b. Beach sand
a. 10 mass percent c. River sand
b. 5 mass percent 283.The apparatus used in determining the fineness of
c. 3 mass percent Portland cement by air permeability is
271.If the coarse aggregates are subjected to five a. Blaine Air Permeability Apparatus
cycles of sodium sulfate soundness test, the b. Sieve No. 200
weighted loss shall not exceed c. Gillmore
a. 12 mass percent 284.A mixture of cement and water is called
b. 15 mass percent a. Cement paste
c. 10 mass percent b. Mortar paste
c. Concrete paste

12
MATERIALS ENGINEER
285.The apparatus used to determine the initial and b. 8 – G,P,C
final setting of cement in the laboratory is c. 6 – G, P, C
a. Gillmore needles 297.There is 1 – Q of cement required for every
b. Bailey needle a. 4,000 bags or fraction thereof
c. Vicat apparatus b. 2,000 bags or fraction thereof
286.The compressive strength of cement mortar c. 10,000 bags
samples in seven days is not less than 298.There is 1 – Q of RSB required for every
a. 19.3 MN/m2 a. 20,000 kg or fraction thereof
b. 20 MN/m2 b. 10,000 kg or fraction thereof
c. 24 MN/m2 c. 15,000 kg or fraction thereof
287.What is the appearance of the molded cement 299.How many set of beam samples taken for every 75
paste which fails to meet the autoclave expansion m3 of concrete poured per day?
a. Crumble a. One (1) set
b. Shiny b. Two (2) sets
c. Changes color c. Three (3) sets
288.The dimension of beam sample for paving concrete 300. In a completed pavement, what is the minimum
is core samples required before payment is effected?
a. 6 in x 6 in x 21 in (Assuming that the thickness is 23 cm.)
b. 6 in x 6 in x 24 in a. Five holes per km per lane
c. 4 in x 4 in x 218 in b. One hole per 500 m
289.The critical number of days of curing concrete is c. P.E. certificate
a. First seven days 301.In a barangay road, what is the minimum
b. First 10 days requirement for thickness determination of its
c. 29 days completed pavement?
290.The standard dimension of concrete cylindrical a. Five holes per km per lane
sample is b. P.E. Certificate
a. 6” diameter and 12” tall c. One hole
b. 6” diameter and 6” tall 302.A quality test is one of the minimum requirement
c. 6” diameter at 8” tall for item 200 – aggregate subbase course
291.There are two layers in performing sampling of a. True
beam samples. How many number of blows are b. False
required per layer? c. Optional
a. 63 blows 303.There is no CBR test for Item 300 – aggregate
b. 75 blows surface course.
c. 50 blows a. True
292.There are three layers in performing sampling of b. False
concrete cylinder samples. How many blows are c. Optional
required per layer? 304.In items 311 and 405, grading is performed
a. 25 blows a. For every 75 cu. m. or fraction thereof
b. 30 blows b. For every 300 cu. m.
c. 35 blows c. None
293.The formula which determines the proportion of the 305.For pipe culverts and storm drains, the minimum
mix which can meet the desired strength tests is 1 – Pipe for every 25 pipes. What is the
requirement of concrete is called alternative requirement?
a. Design of concrete mix a. 1 – set consisting of 3 concrete cylinder
b. Boyle’s Formula samples for not more than 25 pipes cast
c. Bernoulli’s Formula in the field and 1 – inspection report for
294.The minimum testing requirement for every project each size for not more than 25 pipes cast
is indicated in a duly approved in field
a. Quality Control Program b. Inspection report is enough
b. Program of work c. Mill certificate
c. Work Schedule 306.The minimum test requirement for paint is
295.It is prescribed in each project based on estimated a. I – sample for every 100 cans or fraction
quantities and specifies the kind and number of test thereof
for each item of work. b. I – sample for every 50 cans or fraction thereof
a. Minimum number of work c. Mill Certificate
b. Minimum Testing requirement 307.The minimum test requirement for water used in
c. Work Schedule concrete for a questionable source is
296.Embankment materials delivered at the jobsite was a. P.E. Certificate
about 12,000 m3. The minimum test requirement b. I-quality Test
calls for 1 – G, P, C for every 1,500 m3 c. Inspection Report
a. 10 – G, P, C

13
MATERIALS ENGINEER
308.Based I the maximum dry density obtained by b. False
laboratory test, the degree of compaction required c. Both are the same
for aggregate subbase should be at least 319.If angular coarse aggregates is used in a concrete
a. 95% mix, it will require more
b. 98% a. Water
c. 100% b. Fine aggregates
d. None of the above c. Water and fine aggregates
309.Per our present Specification for Highways and d. Neither a and b
Bridges including amendments, it is mandatory to 320.The most favorable period for curing concrete is
open Portland Cement Concrete Pavement to traffic a. During the first few days or week
not later than b. After 3 days
a. 7 days after pouring c. After one week
b. 14 days after pouring d. Before 28 days
c. 21 days after pouring 321.Lower water cement ratio in concrete mixes
d. 28 days after pouring improves
310.In casting reinforced concrete railings, the concrete a. Strength
used is b. Durability
a. Class A1 c. Water tightness
b. Class A2 d. All of the preceding
c. Class C1 322.When concrete must be placed in a sloping surface,
d. Any of the preceding classes placing should start at the
311.For efficient compaction, the embankment materials a. Bottom
should at the time of rolling be b. Top
a. Dry c. Can be top or bottom
b. Wet 323.The maximum percent abrasion loss allowed for
c. At optimum moisture content concrete coarse aggregate is
d. At maximum moisture content a. 30%
312.For a road base course the most preferable material b. 40%
is one with CBR of c. 45%
a. 60 d. 50%
b. 30 324.The plasticity index of aggregate base course
c. 50 should be not greater than
d. 80 a. 6
313. Peat and muck are b. 8
a. Fair subgrade soils c. 10
b. Stable soils d. 12
c. Unstable soil 325. In casting of reinforced concrete pile, the concrete
d. Good subgrade soils used is
314.The slump test on concrete is a measure of a. A1
a. Strength b. D
b. Unit weight c. C1
c. Consistency d. D2
d. Durability 326.The natural water content of highly organic soil is
315.The fineness modulus is highest for a. Less than 20
a. Fine sand b. Between 20 and 50
b. Very fine sand c. Between 50 and 100
c. Very coarse sand d. More than 100 percent
d. Coarse sand 327.Which of the following dead load is equivalent for
316.If concrete is continuously moist cured, it will gain loose sand, earth and gravel fill?
strength beyond 180 day. a. 2,403 tons/m3
a. True b. 1,922 tons/m3
b. False c. 1,603 tons/m3
c. It depends on curing temperature d. 2,150 tons/m3
317.The quality of paying concrete is usually measured 328. Rate of application for curing compound is
by its a. 0.30 li/m2
a. Compressive b. 0.20 li/m2
b. Tensile c. 0.15 li/m2
c. Flexural d. 0.10 li/m2
d. Bond strength 329.During coring of completed pavement, how many
318.Generally speaking, batching of concrete cores/km/ lane is required as per specification?
aggregates by volume is preferable than weight. a. 4
a. True b. 5

14
MATERIALS ENGINEER
c. 6 341.The particle size distribution of sandy gravel is
d. 7 determined by
330.What is the correct proportion for concrete masonry a. Hydrometer test
work? b. Sieve test
a. 1:2 c. Dilatancy test
b. 1:3 d. Any of the preceding test
c. 1:4 342.The best soil for a road subgrade would have a
d. 1:5 group index of
331.The opening of No.4 sieve is bigger than the a. Less than 5
opening of a ¼” sieve b. 5 to 10
a. True c. 11 to 15
b. False d. 16 to 20
c. They are the same 343.The highest moisture content in the plastic state of
332. The standard compaction test on predominantly fine grained soil is the
fine grained soils is performed on soil fraction a. Liquid limit
passive sieve no b. Plastic limit
a. 200 344.Which of the following characterizes unsuitable
b. 40 materials?
c. 16 a. Soil with liquid limit exceeding 80
d. 4 b. Plasticity index exceeding 55
333.Which plasticity index would you prefer for the base c. Soil with natural water content exceeding
course of Portland Cement Concrete Pavement? 100%
a. Less than 6 d. All of the above
b. 6 to 9 345.Shrinkage factor test is
c. 10 to 12 a. Test to determine pay volume
d. More than 12 b. Test to determine strength characteristic
334.A soil which is classified A-7 by the highway c. Test to determine volume change
research board method will have a subgrade rating d. Test to determine maximum density
of 346.Soil is fully saturated if the water content is
a. Excellent a. At optimum amount
b. Good b. 100%
c. Fair c. More than 100%
d. Poor d. None of the preceding
335.The empirical number used in design is 347.The density to which a soil can be compacted is
a. Plasticity index related to
b. Group index a. Compactive effort
c. Both of the preceding b. Water content
336.Soil is fully saturated at optimum moisture content c. Both a and b
a. True d. Neither a nor b
b. False 348.Specification require 1 quality test every ___ of
c. It depends on void ratio asphalt mix
337.Water content of soil is generally based on a. 40 tons
a. Total weight of soil b. 130 tons
b. Total volume of soil c. 50 tons
c. Weight of solids d. 150 tons
d. Unit weight test 349.All asphalt are ___, they became harder as
338.Optimum water content of soil is determined by temperature decreases and softer as their
a. Field density test temperature increases.
b. Liquid limit test a. Thermoplastic
c. Compaction test b. Hydrophobic
d. Unit weight test c. Brittle
339.The particle size distribution of soil is determined by d. None of the above
a. Liquid limit granular 350.The viscosity of the asphalt during mixing and lay
b. Plastic limit test down is
c. Sieve analysis test a. Viscosity at 135 °C
d. Any of the preceding test b. Viscosity at 125 °C
340.Which of the following are most suitable for c. Viscosity at 60 °C
construction of highway embankments? d. Viscosity at 163 °C
a. Granular 351.The trial section for compaction for each type of fill
b. Fine-grained materials and type of equipment to be used in the
c. Plastic work should have an area of
d. Clayey a. 500 sq. m

15
MATERIALS ENGINEER
b. 335 sq. m. 362.As Materials Engineer, when is the right time to
c. 600 sq. m. start sampling and testing of materials to be
d. 400 sq. m. incorporated into work?
352.Control strip shall have an area of approximately a. Before final payment
a. 500 sq. m. b. Before start of work items
b. 335 sq. m. c. Before first partial payment
c. 600 sq. m. 363.The Spot Test on asphalt is used to determine
d. 400 sq. m. what?
353.Fine aggregate used in asphalt mix is the one a. Cleanliness
a. Passing the no.8 sieve b. Overheating during manufacture
b. Passing the no. 30 sieve c. Safe working temperature
c. Retained to the no. 200 sieve d. Viscosity of the mix
d. Retained to the no. 8 sieve 364.Under what climate conditions do we use higher
354.The corrugation produced by brooming is penetration grade asphalt cement?
a. 1.5 mm a. Hot climate
b. 2.0 mm b. Rainy weather
c. 2.5 mm c. Cold climate
d. 1.0 mm d. None of the above
355.The higher the ___, the lower the penetration 365. What is the basis for rejection or acceptance of any
a. Specific gravity construction materials?
b. Viscosity a. Certificate of Billing
c. Durability b. Materials Test Report
d. Solubility c. Statement of work accomplished
356.The required thickness of the thermoplastic paint in d. None of the above
PCCP is 366.Initial rolling of bituminous mixes shall be
a. 3.2 to 4.8 mm performed with a ___ roller
b. 3.0 to 4.5 mm a. Vibratory
c. 3.3 to 3.8 mm b. Pneaumatic
d. 3.2 to 4.0 mm c. Sheepsfoot
357.What percent of hydrated lime shall be added to d. None of the above
the mixture during mixing operation of asphalt mix? 367.In a bituminous mix sample, what is the % of
a. 0.5 to 1.0 mass % asphalt by a) weight of aggregates and by b)
b. 1.0 to 1.5 mass % weight of mix? Given the following data? Weight of
c. 0.75 to 1.2 mass % dry aggregates (after extraction) = 950 grams;
d. 0.2 to 0.7 mass % weight of mix = 1010.
358.As Materials Engineer, what would you recommend A.
in order to check the suitability and efficiency of the a. 6.32%
equipment to be used prior to subbase construction b. 5.50%
for item 310, Bituminous Concrete Surface Course? c. 6.0%
a. Make trial sections d. None of the above
b. Establish control strips B.
c. Make trial mixes a. 5.50%
d. None of the above b. 6.32%
359.Quality of factory – produced reinforced concrete c. 6.0%
pipes may be best established through what? d. 5.94%
a. Compressive strength test 368.What grade of asphalt has a penetration grade of 0
b. Core tests – 30?
c. Flexural strength tests a. Emulsified asphalt
d. Crush strength test b. Asphalt cement
360.Results of Immersion – Compression test conducted c. Blown asphalt
on a bituminous mix sample are as follows: Dry d. None of the above
stability + 2,000 Kpa, Wet stability = 1,000 Kpa. 369.Problems regarding quality of construction materials
What is the resulting Index of Retained Strength? shall be reported directy by the Contractor’s
a. 60% Materials Engineer to the
b. 55% a. DPWH Materials Engineer
c. 50% b. Contractor
d. 70% c. Contractor’s Project Engineer
361.In DPWH Contract Projects, Quality Control is the d. None of the above
sole responsibility of 370.If the RC pipes in the foregoing problem is not cast
a. A DPWH project personel in the field, how many pipes will be required to be
b. The government’s Materials Engineer subjected to the Crushing Strength Test?
c. The Contractor a. 75 pcs.

16
MATERIALS ENGINEER
b. 70 pcs. a. 4 kph
c. 100 pcs. b. 5 kph
371.How many concrete cylinder samples are required c. 8 kph
for 3,500 pieces of reinforced concrete pipes? d. 6 kph
a. 14 sets of 3 382.What shall be checked after final rolling
b. 140 sets of 3 a. Degree of compaction
c. 75 sets of 3 b. Optimum asphalt content
d. None of the above c. Quantity of aggregates
372.What is the bitumen obtained from the distillation 383. When is the completed asphalt pavement opened
of coal or wood? to traffic
a. Rock asphalt a. When the asphalt has cooled to
b. Tar atmospheric temperature
c. Emulsion b. When the asphalt has cooled to ± 10°C of the
d. None of the above spreading temperature
373.How do you reduce the viscosity of Medium-Curing c. When the asphalt is still hot
Asphalt? By mixing with 384.The apparatus used in determining the consistency
a. Gasoline of asphalt cement is
b. Diesel a. Penetrometer
c. Kerosene b. Viscometer
d. Emulsion c. Thermometer
374.What establish the exact percent of aggregates and 385.How is the consistency of liquid asphalt determined
asphalt content in a bituminous mix? a. Viscometer
a. Design mix b. Tag open cup
b. Job order c. Penetrometer
c. Job mix formula 386.The Optimum Asphalt Content obtained in a
d. Extraction formula Marshall Stability Test is the average asphalt
375.What greatly influence the serviceability of an content of the Maximum Stability, Maximum Bulk
asphalt pavement? Specific Gravity, and
a. Quality of aggregates and climate a. 4% Air Voids
b. Penetration grade and quantity of asphalt b. 2 mm flow
c. Density and compaction of completed c. 5% mineral content
pavement 387.What test determines the safe working temperature
376.In asphalt pavement construction, how is the of the asphalt?
surface level of the completed pavement checked? a. Ductility test
a. By T-core test d. Flash point test
b. By density test b. Stability Test
c. By the use of 3 meter straight edge 388.They are usually tested for extraction
377.What primarily influence the grade of asphalt to be a. Asphalt mixes
selected? b. Emulsions
a. Penetration c. Asphalt cement
b. Class of aggregate 389.Steel bars for the concrete reinforcement are tested
c. Climate for their ___ properties
d. Temperature a. Tensile and bending
378.Who will approve the Job Mix Formula? b. Compressive
a. DPWH Project/Materials Engineer c. Crushing
b. Contractor 390.What method is used in determining the strength of
c. Contractor’s Materials Engineer concrete pipes?
379.What control during the mixing and compaction of a. Third point loading method
the bituminous pavement is of great significance in b. Center point loading method
the resulting pavement? c. Three edge bearing method
a. Compaction 391.How many units shall be tested for strength,
b. Density moisture and absorption in a lot of 120,000 CHB?
c. Grading of aggregates 18 units
d. Temperature 392. For 250 gallons of Reflectorized Traffic Paint, how
380.In asphalt pavement construction, there are three many samples are required to be submitted for
phases of rolling; what kind of roller is required to Quality Testing?
be used for the final compaction and smoothing? a. 3 samples
a. Pneumatic roller b. 2 samples
b. Sheepsfoot roller c. 4 samples
c. Tandem-smooth wheeled roller 393.The bituminous mix should have a mass % of air
381.What is the maximum speed of the roller in voids within the range of
compaction of asphalt pavement? a. 2 to 3%

17
MATERIALS ENGINEER
b. 1 to 4% 411.Expansion joint filler having a nominal thickness of
c. 3 to 5% less than ___ mm shall not be subject to a
394.Traffic paint shall be applied to the pavement at the requirement for compaction
rate of 0.33L / m2 all shall dry sufficiently to be free 13 mm
it from cracking from 412.Strips of a joint filler that do not conform to the
15 to 30 minutes specified dimension within the permissible
395.This is the only class of riprap that may consist of variations of ___ m thickness ___ in depth shall be
round natural stones reflected
Class A Riprap ±1.6 to 0 thickness
396.The surface of riprap shall not vary from the ± 3 mm in depth
theoretical surface by more than ___ mm at any 413.These are finely divided residue that results from
point the combustion of ground or powdered coal
100 mm Fly ash
397.Fine aggregates of masonry shall all passes the ___ 414.A light spray application of asphalt to an existing
mm sieve pavement as a seal to inhibit raveling, or seal the
2.36 mm (no. 8 sieve) surface or both
398.Mortar that is not used within ___minutes after the Fog seal
water has been added shall be discarded 415.Find : A light application of bituminous material for
90 minutes the express purpose of laying and bonding loose
399.Maximum projection of rock faces beyond the pitch dust.
lines shall not be more than Binder
50 mm 416.The aggregate that is graded from the maximum
400.In hot or dry water, the masonry shall be size, down to and including filler, with the object of
satisfactory protected from the sun and shall not be obtaining a bituminous mix with a controlled void
kept wet for a period at least ___ after completion. content and highly stability is called
Three (3) days Dense – graded aggregate
401.For pavement markings, the composition of white 417.The bituminous material used to fill and seal cracks
paint shall be ___ pigment and ___ % of vehicle in existing pavement is called
45 – 45% pigment Crack filler
53 – 55% vehicle 418.The application of sprayed bituminous coatings not
402.The composition of yellow paint shall be ___ involving the use of aggregates is called
pigment and ___ vehicle Bituminous application
23% pigment and 77% vehicle 419.A mixture of bituminous material and mineral
403.The ___ material shall be of such quality that it will aggregate usually prepared in a conventional hot –
not darken or become yellow when attain section is mix plant or drum mixer at a temperature of not
exposed to sunlight more than ___ and spread and compacted at the
Nonvolatile material job site at a temperature above
404.It consist of beads of good quality, optically clear, 260 °F (127 °C) / 200 °F (93°C)
lead free glass with not less than 90% reasonably 420.It is an application of low viscosity bituminous
spherical and free from flows. material to an absorptive surface designed to
Ballotini for reflective road paint penetrate, bond, and stabilize this existing surface
405.It is a reflector which shall be the short base type and to promote adhesion between it and the new
having a maximum base area of 180 mm x 140 mm super-imposed construction
a. Flash surface reflective stud Prime coat
406.The pads shall be highly resilient and durable 421.A uniform application of a mixture of emulsified
rubber reinforced with canvas and shall have a asphalt, fine aggregate, mineral filler, and water to
design life of at least an existing pavement, single or multiple application
Five (5) years may be used.
407.The reflectors shall have the minimum specific Slurry seal
intensity value expressed as ___ of illumination 422.It is an application of bituminous material applied
Candle power per foot candle for an existing, relatively non-absorbent surface to
408.The reflector shall support a vertical load of ___ provide a thorough bond between old and new
when tested surfacing
10 KN Tack coat
409.When raised profile type reflector are specified the 423.It is a bituminous aggregate application to any tipe
approved ___ epoxy adhesive shall be used of road or pavement surface for the purpose of
Two (2) parts providing a wearing course, or surface seal, or both
410.Expansion joint filler having a nominal thickness of Treatment Seals
less than ___ mm shall not be subject to a 424.It is a bituminous- sand application to an existing
requirement of water absorption pavement to seal the surface and to function
9.5 mm Sand Seal

18
MATERIALS ENGINEER
425.It is a spray application of bituminous material used ½ “ (12.7 mm)
to temporarily stabilize a recently seeded area. The 440.Soil properties can be improved by
bituminous material can be applied to the soil or to a. Adequate compaction
a straw or hay mulch as a tie down b. Additional binder
Mulch treatment c. Maximizing water content
426.It is a combination of bituminous material and d. Stabilization
aggregate that is physically mixed by mechanical 441.As construction progresses, you noticed that the
means, spread on the job site and compacted materials delivered at the project site are different
Bituminous Aggregate Mixtures from the one tested and passed the requirement, as
427.It is a combination of bituminous material and Material Engineer what would you do?
mineral aggregate applied at ambient temperature a. Authorize the use of the materials
for use in patching holes, depressions and distress b. Conduct immediate retesting of the
areas in existing pavement. materials for verification purposes
Maintenance Mix c. Reject Materials
428.It is a pavement construction using essentially one- d. Replace the materials
size aggregate which is penetrated in place by an 442.What is the test criteria for RCPC test with three (3)
application of high viscosity bituminous material Edge Bearing Test?
followed by an application of smaller size coarse a. 0.3 mm
aggregate and thoroughly rolled. b. 0.4 mm
Penetration Macadam c. 0.5 mm
429.The glass beads used in traffic paints shall have a d. 0.6 mm
minimum of ___ % true spheres 443.The Immersion – Compression test is prepared to
70% determine
430.The glass bends used in traffic paints shall have a a. Ductility
minimum refractive index of ___ b. Solubility
1.50 c. Stability
431. The white thermoplastic material shall not exceed d. Flexibility
a yellowish index of 444.The use of sea water in reinforced concrete is not
0.12 allowed due to
432.The thermoplastic material shall have a maximum a. No effect
percent residue of ___ after heating at 8 ± 0.5 b. Cause of reduction in ultimate strength of
hours at 218 ± 2°C. concrete
28% c. Induce risk of corrosion of R.S.B
433.The softening point of thermoplastic paint should d. B and c
be 445.If the soil is properly compacted at MDD it will
102.5 ± 9.5 °C a. Increase stability/strength
434.What kind of water shall be used in laboratory test b. Minimize future settlement
especially if it deals with chemical? c. Decrease permeability
Distilled Water d. All of the above
435.Liquid limit brass cup with a sample is raised and 446.Asphalt construction, compaction must be
allowed to drop sharply on the base through a completed before the mixture cools to
height of what? a. 165 °F (60 °C)
10 mm b. 175 °F (65 °C)
436.How many rotation per second will the crank of a c. 185 °F (71 °C)
liquid limit device be rotated? d. 195 °F (76 °C)
2 rotations per second 447.Which contractor are required by DPWH to own the
437.What is the required size of calibrated sand used minimum material testing equipment for pre-
for FDT? qualification purposes?
Any clean, dry, free-flowing, uncemented a. Small
sand passing #10 and retained # 200 b. Medium
sieve. c. Large
438.What is the degree of compaction of soil having a d. All of the above
maximum dry density of 2,250 kg/m 3 and wet 448.As percent asphalt increases in Marshall stability
density of soil from hole is equivalent to 2,335 test, the % air voids
kg/m3 and an average moisture content of 8.85% a. Increases
% degree of compaction = (dry density / max b. Decreases
dry density ) x 100 c. Remains constant
= [2335/(1+8.85/100)] / 2,250 x 100 d. A or b
= 2,145.15/2,250 x 100 449.The aggregate component contribute to shear
=9.34% strength and stability of bituminous mixture. The
439.What is the standard diameter of an orifice in FDT desirable shape and surface texture of aggregate is
sand cone? a. Round and smooth surface

19
MATERIALS ENGINEER
b. Angular and smooth surface b. Passing No. 4 sieve
c. Round and rough texture c. Passing No. 6 sieve
d. Angular and rough texture d. Passing No. 8 sieve
450.You can classify a soil sample in accordance to 461. The purpose of trial section is to check
AASHTO through a. The suitability of materials
a. Grain Size Analysis b. The efficiency of the equipment
b. Atterberg Limit c. The construction method proposed to be used
c. Both a and b d. All of the above
d. None of the above 462.In FDT, the volume of hole is determined by what?
451.Who should take samples of materials and bring a. Sand to fill hole over unit weight of dry
them to the laboratory for acceptance purposes? sand
a. DPWH Materials Engineer b. Total material taken hole over volume of hole
b. Contractor’s Materials Engr. c. Wet unit weight over 1 + MC/100
c. Contractor’s Project Engineer d. Dry unit weight over MDD x 100
d. DPWH Project Engineer 463.What is the average compressive strength of the
452.How do you determine the diameter of RSB? load bearing concrete hollow blocks?
a. By Vernier Caliper a. 1000 psi
b. By Unit Weight b. 800 psi
453.Cement which has been in storage for so long c. 600 psi
period that there is already doubt as to its quality d. 1200 psi
should be 464.The surface condition of tack coat before the next
a. Retested prior to use course should be applied is
b. Not be used a. Wet
c. Authorized to use b. Sticky
454.In Abrasion test, a sample of 5,000 grams was c. Dry
subjected to abrasion, a 2,000 grams sample was d. Plastic
retained in no. 12 sieve after washing, what is the 465.The Contractor shall give the Engineers at least ___
abrasion loss? days notice prior to the beginning of work at the
a. 50 mill or shop where the metal structures has been
b. 40 manufactured or fabricated, so that the required
c. 60 inspection may be made.
d. 30 a. 14
455.Different brand of cement should not be allowed b. 17
because c. 21
a. Different in texture d. 15
b. Different in color when dried 466.The request for recoring shall be made by the
c. Varies in strength contractor within ___ weeks after the official result
456.An apparatus used for field density test is called of the coring test has been released if the
a. Sand cone structures failed to meet strength requirement.
b. Rubber balloon a. One (1)
c. Nuclear density meter b. Two (2)
d. All of the above c. Three (3)
457.Thickness tolerance in the construction of sub-base d. Four (4)
course is 467.A revised design strength for concrete works was
a. ± 10 mm set forth from 14 days to 7 days for concrete
b. ± 20 mm pavements for national roads and ___ days for
c. ± 5 mm major interchanges and busy intersections thus
d. ± 15 mm minimizing occurrence of road congestion.
458.PH value of water used in concrete is a. Seven (7)
a. 4 to 6 b. Three (3)
b. 6 to 8 c. Six (6)
c. 6 to 10 d. Four (4)
d. 3 to 5 468. Compressive strength for mortar samples tested at
459.In what item of work emulsified asphalt and cut 3 days and 7 days can be considered for
back asphalt used? acceptance provided the strength of the samples at
a. Tack coat 7 days is not less than ___ Mpa which is 85% of
b. Prime coat the compressive strength for 28 days.
c. Seal coat a. 22.08
d. Bituminous surface course hot-laid b. 24.84
460.What is the boundary between Coarse and Fine c. 23.45
aggregates used in concreting? d. 21.53
a. Passing sieve 3/8” sieve

20
MATERIALS ENGINEER
469.The use of Fly Ash concrete mix as mineral a. Less than 29 °C
admixture in PCC and as ___ % replaces the b. Less than 28 °C
Portland cement in concrete mix. c. Less than 30 °C
a. 15 d. Less than 31 °C
b. 20 477.In PCCP coring, what is the specified thickness of
c. 25 an individual measurement that shall not be
d. 10 included in the average?
470.This is an instrument used to measure pavement a. Less than 20 mm
deflections resulting from vehicle wheel loading. b. More than 25 mm
The results of the elastic deformation tests are used c. Less than 25 mm
to evaluate the structural condition of roads, and to d. More than 20 mm
help in the design of road strengthening measures 478.It is the wearing away of the pavement surface
and road capacity improvements. caused by the dislodging of aggregate particles
a. Dynamic Cone Penetrometer a. Rutting
b. Falling Weight Deflectometer b. Raveling
c. Three (3) Meter Straight Edge c. Shoving
d. Benkelman Beam d. Corrugation
471.This is an equipment which is used to measure 479.This is the stage in compaction in which all free air
differential deflection between joints of a concrete is expelled and replaced by water, if further
pavement, to determine the modulus of the existing pressure is applied to the soil mass, the tendency is
slabs for use in the design of an overlay to reduce its volume
a. Dynamic Cone Penetrometer a. Wetting stage
b. Falling Weight Deflectometer b. Swelling stage
c. Benkelman Beam c. Saturation stage
d. Merlin Road Roughness Measuring Device d. None of the above
472.In the foregoing illustration determine the average 480.In this stage, additional water replaces some of the
thickness of PCCP. entrapped air and the soil particles move closer
together with a resulting increase in density
Positio Actual Measurement a. Wetting stage
n b. Swelling stage
1 23.4 c. Lubricating stage
2 23.5
d. All of the above
3 23.6
481.All boring during soil exploration survey shall
4 23.6
generally be carried to a depth of at least ___
5 23.4
meter/s
6 23.3
a. One (1)
7 23.3
b. Two and a half (2 ½)
8 23.4
c. 0.30
9 23.4
a. 24.433 d. 0.50
b. 23.43 482.What is the factor that will influence the
c. 23.40 construction of stabilized road?
d. 23.4333 a. Depletion of the supply of economically
473.Vibrators shall not be operated longer than ___ available materials
seconds in any one location b. High cost involved in the construction of the
a. 10 conventional types of road
b. 15 c. If the road structure may be built by
c. 20 stages, and a properly designed road
d. 25 might function briefly as a wearing
474.How many rotations per second will the crack of a coarse
liquid limit device be rotated? d. All of the above
a. Three (3) rotations per second 483.What is the meaning of ASTM?
b. Two and a half (2 ½ rotations per second a. American Standard for Testing Materials
c. Two (2) rotations per second b. American Standard for Testing and
d. One and a half (1 ½) rotations per second Materials
475.What is the required size of calibrated sand used c. American Society for Testing Materials
for field density test (FDT)? d. American Society for Testing and Materials
a. Passing sieve No. 30 retained No. 200 484.In sampling Bituminous Materials, the composite
b. Passing sieve No. 20 retained No. 200 samples taken from a number of drums should
c. Passing sieve No. 10 retained No. 200 have a size sufficient for Testing and should not be
d. None of the above less ___ item ___ as called for in the guidelines on
476.When placing concrete, what is the required the submission of samples
temperature of concrete? a. 5 liters

21
MATERIALS ENGINEER
b. 4 liters d. 150
c. 10 liters 494.The fine aggregate used in stone masonry mortar
d. 6 liters shall all pass No. __ sieve
485.For semi soilid materials, samples should be taken a. 40
at the center of the containers at least ___ mm b. 8
below the surface and 75 mm from the sides with c. 30
the aid of a clean hatcher or patty knife d. 3/8”
a. 100 495.The coarse aggregate used in Bituminous Concrete
b. 85 is
c. 75 a. Retained on a 2.36 mm (No.8) sieve
d. 50 b. Retained on a 4.75 mm (No.4) sieve
486.It classifies the different asphalts into types and the c. Retained on a 19.0 mm (3/4”) sieve
different types into grades d. Both a and b
a. Quality test 496.As Material Engineer, Will you permit the use of
b. Consistency test salvage soil aggregate for lime stabilized road mix
c. Ductility test base course?
d. All of the above a. Yes
487.This is the most important volatilization test on b. No
liquid asphaltic products, it gives information as to c. It depends
the actual amount of constituents removed at d. Let the DPWH Project engineer decide
definite temperature 497.Is the accredited private testing laboratories own
a. Extraction test by companies involved in the supply of construction
b. Distillation test materials for DPWH project be allowed to test their
c. Evaporation test own products?
d. Softening test a. Yes
488.This test indicate the purity of asphalt b. No
a. Specific gravity c. It depends
b. Viscosity d. Either a or c
c. Solubility 498.For small projects where the quantity of steel bars
d. Ductility is less than 10,000 kgs., what may be required as a
489.This is the most important factor which influence basis of acceptance
the stability of bituminous mixture a. P.E. Certificate
a. Gradation of mineral aggregate b. Mill Certificate
b. Shape and surface texture of aggregate c. Inspection Report
c. Hardness of aggregate particles d. All of the above
d. All of the above 499.Lumber is considered well-seasoned when its
490.The principal factor that affect the flexibility of moisture contents is between
bituminous mixture is a. 10 to 16%
a. The quality of bituminous binder b. 14 to 18%
b. The quality of mineral filler c. 10 to 14%
c. Temperature susceptibility of the binder d. 15 to 20%
d. All of the above 500.Flushing of bitumen to the surface after belting or
491.The application temperature of emulsified asphalt screeding the hot mixture denotes rich mixture
ranges from a. True
a. 66° to 107 °C b. False
b. 10° to 71 °C c. Neither of the two
c. 20° to 66 °C 501.Unsuitable materials are those materials containing
d. 15° to 66 °C detrimental quantities of organic materials, such as
492.Concrete deposited in water shall be Class “Seal” grass, roots, and sewerage and those that is
concrete with a minimum cement factor of ___ of a. High organic soils
concrete b. Soils with liquid limit exceeding 80 and /or
a. 12 bags per cu. m PI>55
b. 10 bags per cu. m c. Soils with very low density, 800 kg/m3 or below
c. 11 bags per cu. m d. All of the above
d. 9.5 bags per cu. m 502.The set of cylinders for each project shall be
493.A tremie shall consist of a tube having a diameter numbered consecutively beginning with 1 and three
of not less than ___ mm constructed in sections specimens should be identified as A, B and C. At
having flanged couplings fitted with gasket with a the early stage of pouring, the laboratory should be
hopper at the top requested to break the “A” cylinders at 7 days to
a. 200 check what?
b. 300 a. If the structure should be put in service at
c. 250 early stage

22
MATERIALS ENGINEER
b. To check the mix design develop ruts under traffic and may shift and shove
c. To check if there is unusual development when to develop a wash board surface, the plasticity
admixture is used index of such material is
d. All of the above a. P.I. is too high
503.The field specimen should be cured from 4 to 7 b. Neither a & b
days at the project under moist conditions obtained c. P.I. is too low
by d. Both a and b
a. Covering with wet sand 512.What is the allowable smooth riding quality of
b. Covering with saw-dust PCCP?
c. Covering with palay-straw a. 5.00 mm
d. All of the above b. 8.00 mm
504.The cured cylindrical samples shall be transported c. 3.00 mm
to the Regional Laboratory or any testing laboratory d. 6.00 mm
accredited by the DPWH in 513.What is the penetration grade of bitumen prime
a. On top of sand coat?
b. Carefully packed and crated surrounded a. 60 -70
with damp sawdust or palay straw b. 120 -150
c. On boxes with sand surrounding the cylinders c. 85 – 100
d. All of the above d. None of the above
505.The penetration grade of concrete joint sealer, hot 514.The spraying application temperature of all grades
poured elastic type is of asphalt cement should not be more than
a. 80 – 100 a. 211°C
b. Below 90 b. 159 °C
c. 100 – 120 c. 135 °C
d. 40 -60 d. 204 °C
506.The CBR is generally selected at that penetration? 515.What is the rate of application of Bituminous Prime
a. 5.08 mm Coat using cut-back asphalt?
b. 3.1 mm a. 0.5 to 0.7 liters/m2
c. 2.54 mm b. 1.0 to 2.0 liters/m 2
d. 3.50 mm c. 1.0 to 1.5 liters/m2
507.A soil aggregate that has a CBR value of 20 means d. 1.10 to 2.0 liters/m2
that in the condition tested, the resistance to 516.What is the weight of boulders required for Class A
penetration of the standard piston was ___ of the grouted riprap?
standard resistance of a compacted soil or a. 10 to 25 kg
aggregate b. 15 to 25 kg
a. 40% c. 15 to 30 kg
b. 20% d. 20 to 30 kg
c. 10% 517.Based on the maximum dry density obtained by
d. 80% laboratory test, the degree of compaction required
508.For liquid asphaltic materials, these tests are run on for aggregate subbase should be at least
the residue after distillation a. 95%
a. Consistency test b. 98%
b. Quality test c. 100%
c. Ductility test d. 90%
d. Cement mixing test 518.Where to determine the amount of mixing water to
509.The basic aim of compaction is to produce a soil use when compacting the soil in the field to attain
mass that will satisfy what criteria? maximum density
a. Settlement a. Trial Section
b. Stability b. Field Density Test
c. Permeability c. Control Strip
d. All of the above d. Lab Compaction Test
510. When do the embankment become friable in dry 519.For soil classification purposes as in AASHTO M45,
weather, ravel at the edges and abrade severly what is not required?
under traffic and will become dusty in service and a. Combined sieve and mechanical analysis
much of the binder soil is simply blown away during b. Sieve analysis
the dry season c. The wash test
a. The embankment is non-plastic d. None of the above
b. The embankment lacks compaction 520.This is widely used to control the characteristics of
c. Materials fails CBR test soil which are to be incorporated in roadway
d. None of the above a. The limit test
511.When the embankment tends to soften in wet b. The soil classification
weather, and PCCP constructed of such material c. The group index

23
MATERIALS ENGINEER
d. All of the above a. 0.18%
521.In direct shear test, the soil is sheared to failure by b. 0.08%
moving one part of the soil sample relative to the c. 0.06%
other part along a pre-determined plane. When d. 0.05%
several tests are made on the soil under different 529.The permissible variation of reinforcing steel bars
normal loads and the results are plotted in bigger than 9.0 mm shall not exceed
arithmetic scales, the resulting line is made in the a. 10%
form of b. 8%
a. Straight line c. 5%
b. Hyperbola d. 6%
c. Parabola 530.A type of cement that sets and hardens by chemical
d. Semi-eliptical interaction with water and is capable of doing so
522.In conducting soil exploration survey, what underwater.
equipment you will use in obtaining undisturbed a. Portland Cement
samples b. Air-entraining Portland Cement
a. Split-spoon sampler c. Hydraulic Cement
b. Thin-walled sampler d. All of the above
c. Screw type soil auger sample 531. The spacing center to center of circumferential
d. Post-hole auger sampler reinforcement of all pipes shall not exceed its wall
523.Bituminous stabilization in the process of mixing thickness and shall in no case exceed
intimately pulverized soil and bituminous material. a. 150 mm
What is the minimum bearing capacity (soaked b. 100 mm
CBR) of the mixture? c. 200 mm
a. 80% d. 250 mm
b. 100% 532.Oversanded and undersanded concrete mixtures
c. 98% require more water in order to be workable but will
d. 95% only result to
524.Portland cement stabilized roadmix base coarse is a. Good surface texture
an intimate mixture of pulverized soil, Portland b. Weak strength
cement and water which is thoroughly compacted c. Water tightens
while in a moist condition to form a structural road d. All of the above
material when the cement hydrates and crystallizes. 533.For every lean mixes or low cement content of the
What is the mass percent wear of soil aggregate mixture. What determines the flexural strength of
used in this stabilization concrete?
a. 40% a. The strength of aggregate
b. 45% b. The water cement ratio
c. Not more than 40% c. The mortar strength
d. 50% d. All of the above
525.For a rich mixture of cement in concrete, what 534.This is a method of determining in-place density of
determines the flexural strength of the concrete? soil that can be used satisfactorily in moist,
a. Mortar Strength cohesive fine grained material only. The sample is
b. Both a & b obtained by forcing a small thin-walled cylinder
c. The strength of aggregate into the material with a driving head and a hammer
d. The water/cement ratio or other suitable apparatus
526.This is a new method of soil stabilization being Drive Cylinder Method
introduced to improve the properties of soil which is 535.This method of test is intended to determine the
effective and at the same time cheaper density of cohesive soil and stabilized soil by
a. Stabilization by the use of Geotextiles measuring the weight and volume of undisturbed
b. Cement Stabilization samples.
c. Bituminous Stabilization Block, Chunk or core Sampling
d. Lime Stabilization 536.This method covers the determination of the
527.As per Guidelines on Submission of Samples, density in-place of compacted or firmly bonded soil
laboratory trial mixes should be made of aggregates by using a flexible membrane and liquid that can be
which are proposed to be used for the first time, in used to measure the volume of a test hole soil with
this case what is the weight of fine aggregates to and accuracy within 1.0%
be submitted for testing? By Rubber Balloon Method
a. 100 kg 537.This method covers the determination of the total
b. 70 kg or wet density of soil and soil aggregate in-place by
c. 50 kg the attenuation of gamma rays where the gamma
d. 80 kg detector, or both, remains at or near the surface
528.The phosphorous content of reinforcing steel bars Nuclear method
shall not exceed 538.What are the three (3) major groups of soil?

24
MATERIALS ENGINEER
a. Granular soil It is the determination of particle size
b. Fine grained soil distribution in soil by sieve, hydrometer, or
c. Organic soil combined analysis
539.What are the common laboratory test required for 554.What are the other terms or particles size analysis?
soil a. Sieve analysis
a. Sieve analysis b. Mechanical analysis
b. Plastic and liquid limit test c. Grading test/analysis
c. Compaction test (moisture – density relation) 555.What is the liquid limit?
d. California Bearing Ratio It is the lowest moisture content at which the
e. Abrasion Test (Mass percent of Wear) soil will flow upon the application of a very
f. Unit Weight small shearing force
g. Moisture Content 556. The liquid limit is expressed as the moisture
540.What are the common field test? content corresponding to what number of blows?
To determine the degree of compaction of soil 25 blows
or it is a control test in embankment 557.What is plastic limit?
construction to ensure adequate compaction It is the minimum moisture content at which
541.What is moisture content? the soil can be readily molded without breaking
It is the amount of water present in the soil. or crumbling
542.What is the difference between natural moisture 558.What kind of water shall be used in laboratory test
content with hydroscopic moisture content? especially if it deals with chemicals?
Natural moisture content is the moisture of Distilled water
undisturbed soil sample while hydroscopic 559.Liquid limit brass cup with sample is raised and
moisture content is the moisture of air-dried allowed to drop sharply on the base through a
soil sample. height of what?
543.What is the formula used for moisture content 10 mm
determination 560.How many rotation per second will the cranck of a
Moisture Content = (wt. of water/ wt. of even liquid limit device be rotated?
dried sample) x 100 2 rotations per second
544.Weighing hot sample is not advisable as it affects 561.In doing a plastic limit test, to what diameter shall
the accuracy of result. the soil thread began to break?
True 3.2 mm (1/8”)
545.What tests are used in soil classification? 562.What is the formula for plastic limit?
a. Grading or sieve analysis PL =(Wa –Wb)/Wb x 100
b. Plastic and liquid limit Wa = original wt. of crumbled soil thread
546.What are the methods use in reducing samples Wb = wt of oven dried crumbled soil
from the field to testing size? 563.What is the Plastic Index (PI)
a. Sample splitter It is the difference between the liquid limit and
b. Quartering plastic limit PI=LL-PL
547.What is the required temperature for oven drying 564.What is specific gravity?
the soil sample? It is a gravimetric-volumetric relationship in
100 °C ± 5°C soils (or defined as the ratio of the wt. in air of
548.How can you determine if the soil sample is already an equal volume of water at a stated temp.)
oven-dried? 565.What is the approximate area for density control
Soil sample is oven-dried if it reached it strips?
constant weight 335 m2
549.How to prepare or to come up with air-dried soil 566.What is the maximum depth of roadway
sample? embankment per horizontal layer in loose
Air dry the sample under the heat of the sun measurement?
550.If impossible to air-dry the sample under the heat 200 mm (8”)
of the sun what alternative should be used? 567.What item of work is embankment?
Oven dry the sample at 60 °C Item 104
551.Sample for compaction test should pass to what 568.What is the kind of material used for item 200?
sieve? Aggregate subbase course
a. Method A & B use sample passing sieve # 4 569.What is the required particle size for selected
b. Method C & D use sample passing sieve # ¾ borrow for topping under item 104 (embankment)?
552.What is the difference between T-99 and T-180 All particle size will pass a sieve 75 mm or 3”
compaction test method? square openings and not more than 15% will
T-99 uses 2.5 kg (5.5 lbs.) rammer with a drop pass 0.075 mm (No. 20) AASHTO 11
of 12” height while T-180 uses 4.54 kg. (10 570.P.I. requirement for item 104 (selected common
lbs) rammer with a drop of 18” height borrow) is
553.What are the particle size analysis? 6 maximum

25
MATERIALS ENGINEER
571.LL requirement for item 104 (selected common 600. How to compute for the compressive strength of
borrow) is concrete cylinder sample?
30 maximum CS = P/A where P = load A= area
572.What is the PL requirement for item 200 (aggregate 601. At what age should concrete beam sample be
subbase course) passing sieve #40? tested for flexural test?
12 maximum 4 days
585. What are the test required for concrete 602. How to compute the flexural strength for third
aggregates? point loading test?
a. Fine agg: Grading, specific gravity, absorption, R = PL/bd2
dry unit wt. 603. What is the minimum flexural strength for third
b. CoarseAgg: Grading, Specific gravity, absorption, point loading test?
dry unit wt. and abrasion 3.8 Mpa (550 psi)
Note: soundness is also tested as per request 604. What is the minimum flexural strength for center
point loading test
585. What is the maxiumum mass % of water by Los 4.5 Mpa (650 psi)
Angeles Abrasion Test? 605. How to compute for flexural strength at center
40% maximum point loading?
587. What is the required speed of Los Angeles Abrasion R = 3PL/bd2
Machine per minute? 606. Which part of the batch for fresh concrete should
30 to 33 rpm the sample be taken from a stationary mixers,
588. What is the size or diameter and weight of cast- revolving drum truck mixers or agitators?
iron spheres use in abrasion? Two or more regular intervals during discharge of
Approximately 46.8 m diameter and each weighing middle portion of the batch
between 390 – 455 grams 607. What is the size of tamping rode use in sampling
589. What is the required total wt. of sample for concrete?
abrasion test of coarse aggregate grading A with 12 16 mm (5/8 inches diameter and 610 mm (24
number of spheres? inches) long with the Tamping end rounded to a
5,000 grams ± 25 grams hemispherical tip of the same diameter as the rod
590. What is the significance of abrasion test? 608. Concrete Masonry (hollow blocks) if subject to test,
It evaluates the structural strength of coarse how many sample is required?
aggregates 6 pcs/ 10,000 units
Gives an indication of guality as determined by 12 pcs if more than 10,000 unit
resistance to impact and wear 609. What is the strength requirement for load bearing
It determines whether the aggregates will have concrete masonry units?
degradation during traffic or rolling Individual = 5.5 Mpa( 800 psi) minimum
591. Quality test for cement is represented by how Average (for 3 samples) 6.9 Mpa (1000 psi)
many bags of cement? minimum
2000 bags or fraction thereof 610. What is the significance of testing reinforcing steel
592. What is the sieve use in sieving materials from bars?
Abrasion Machine? To determine the yield and tensile strength of the
Sieve # 12 (1.70 mm) bar as well as its elongation and is used to classify
593. Testing machine should be calibrated once every the bars into grade
(6) months if possible but if not possible what is the 611. What is the required length of RSB for testing?
required time should the machine be calibrated? 1 meter/ 10,000 kg/site/shipment
Once a year 630. What kind of asphalt is used as prime coat?
594. What is the percent tolerance of error in calibrating Cut-back asphalt (Medium Curing or Rapid Curing)
the machine? 631. Bituminous Prime Coat is use to treat the surface
±1% of base course
595. What do you call a sample for concrete pavement? True
Concrete beam sample 632. No Tack Coat or Prime Coat shall be applied when
596. How many sample should be taken for every 75 m 3 the weather is foggy or rainy
of fresh concrete? True
3 pcs. Sample or 1 set sample 633. What kind of asphalt is used as Tack Coat?
597. What do you call the sample for structural Cut-back Asphalt (rapid Curing) or Emulsified
concrete? Asphalt
Concrete Cylinder sample 634. Where should the Bituminous Seal Coat be used?
598. What is the test use to determine the consistency On an existing Bituminous Surface Course with or
of concrete? without an Application of Aggregates
Slump Test 635. If concrete cylinder sample for RCP is not available
599. How to compute for the slump of concrete? for compression test one (1) whole piece RCP for
Slump = Ht. of slump cone – Hy. Of fresh conc. every 50 pcs. RCP will be submitted for Quality Test
After subsidence True

26
MATERIALS ENGINEER
636. One set (3 pcs) concrete cylinder sample shall be plasticity tests are required based on the DPWH
taken for every how many pieces of RCP? minimum testing requirements?
25 pcs. 25 grading and 25 plasticity
637. In submitting samples for testing, what particular 653. Bituminous concrete mixes contain asphalt by
form is being accomplished? weight equivalent to what?
Sample Card 5 to 8%
638. As a Material Engineer of the project what is the 654. Quality of factory-produced reinforced concrete
report accomplished every week? pipes may be best established through what?
Quality Control Assurance Report Test of concrete pipe samples
639. What do you call the report to be submitted at the 655. Where do we take additional cores when the
end of the month? measurement of any core taken from the pavement
Monthly Materials Report thickness by more than 25 mm?
640. How to determine the proportion of cement, water, At no less than 5 meter intervals parallel to the
fine aggregates and coarse aggregates? centerline in each direction from the affected
By means of Concrete Design Mix location
641. How to determine the thickness of pavement? 656. The results of Immersion-Compression test
By means of Concrete Core conducted on an asphalt mix sample are as follows:
642. How to determine the asphalt content of Dry stability = 2,000 Kpa
bituminous mix? Wet Stability = 1,000 Kpa
By means of extraction Test What is the resulting index of retained strength? Does it
643. In an extraction test, aside from the asphalt what meet the specification requirement of item 310,
other materials being extracted? Bituminous Concrete Course?
Aggregates or composite aggregates (minerals of Index of Retained Strength = Wet Stability/ Dry
fine & coarse aggregate) Stability x 100
644. What is being determined in a core sample from =(1000/ 2000) x 100 = 50%
asphalt pavement? No it does not meet the specification of item 310
Thickness of pavement and density of pavement since the specification of IPS is 70% minimum while
645. All records regarding quality control such as the resulting IRS here is only 50%
accomplishment, daily activities, weather etc. are 657. Quality Control testing in a DPWH project is the
recorded in a responsibility of the
Materials Log Book DPWH and Contractor’s Materials Engineers
646. The Standard Penetration Test (SPT) is an in-situ 658. As Materials Engineers, when is the right time to
test that measures what? start sampling and testing aggregates of the course
Depth of soil layer material
647. Which of the following bituminous material is best Before the course materials be incorporated in the
recommended for sealing weakened plane joints? project
Joint Filler Asphalt (commonly called hard asphalt) 659. The spot test on asphalt is used to determine
648. The main problem associated with wrong practice what?
of conveying concrete is called Overheating during manufacture
Segregation 660. Under what climatic condition(s) do we use the
649. The specifications call for 1:2:4 concrete mix. In lower penetration grade or hard asphalt?
one bagger mixer, which of the following amount of Hot Climate
water is most likely required for the mix? 661. Sampling of the freshly mixed concrete should be
20 liters taken on the ___ batch discharge of the transit
650. A one-lane road, with a pavement width of 3.5 mixer
meters and shoulder width of 0.5 meter on each Middle
side of the pavement, was designed to have 662. Soft and unstable soils were encountered during
subbase and base courses with a combined the course of subgrade preparation, IF you were
thickness of 300 mm. If the thickness of the the Materials Engineer assigned to the project, what
subbase is a 125 mm, the spreading and is the most effective and cheaper method that you
compaction of the subbase and base courses shall would recommend to stabilized the soil prior to the
be carried out in construction of the subbase course?
3 layer over the full width of 4.5 m Geotextiles
651. As a Material Engineer, what is the area of trial 663. How many times per layer should a concrete
section that you would recommend to check to specimen molded in a 6” x 6” x 21” beam mold be
suitability of the materials and efficiency of the rodded?
equipment to be used for Item 310, Bituminous 63 times
Concrete Surface Course? 664. What is the basis for acceptance or rejection of any
About 500 sq. m construction materials?
652. Per program of work, the estimated volume of item Materials Test Reports
201 materials is 7,500 m 3. How many grading and

27
MATERIALS ENGINEER
665. In testing concrete cylinder sample the load 679. Which is the duty or responsibility of a Materials
applied should be continuous without shock at a Engineer
constant rate within the range of ___ per second Quality of Construction materials
0.14 to 0.034 Mpa per second or 20 to 50 psi per 680. Problems regarding quality of construction
second materials shall be reported directly by the
666. During the application of the first half of the contractor’s Materials Engineer to the
anticipated load a ___ rate of loading shall be DPWH Materials Engineer
permitted 681. How many concrete cylinder is required for a 3,000
Higher Rate pcs. Reinforced concrete pipe culverts?
667. Initial rolling in bituminous mixes shall be 120 sets (consisting of 3 pcs. Concrete cylinder per
performed with a ___ roller set
Pneumatic Tire Roller 682. If the concrete cylinder is not available for a 3,000
668. Final Rolling in bituminous mixes shall be pcs culvert pipes, how many pipes shall be
performed with a ___ roller subjected to test?
3-Wheel or Tandem type steel wheel roller 60 pcs. Culvert pipes
669.Rolling of Bituminous mix shall be discounted 683. What kind of test that requires calibrated sand in
whenever it begins to produce excessive ___ or filling the hole in order to determine the volume of
____ hole?
Pulverizing of the aggregate or displacement of the Field Density Test (FDT)
mixture 684. What do you call the test using a rammer and a
670. Final rolling shall be continued until roller marks mold?
are eliminated and a minimum of ___ mass percent Moisture Density Relation Test or Compaction Test
of the density of the laboratory compacted 685. What kind of asphalt has a penetration grade of 0
specimens prepared in accordance with AASHTO T to 30 mm?
160 has been obtained Blown asphalt
97 mass percent 686. IF there is a necessary to add water to the
671. Sample from compacted bituminous mix shall be concrete mix in order to increase is workability
nearly cut by the saw or core drill. Each sample (provided concrete does not exceed specified slum),
shall be at least how many minutes after the initial of the mixing
150 mm x 150 mm or 100 mm diameter full depth does adding of water be permitted?
672. For surface tolerance the surface (bituminous mix) Not exceeding 45 minutes and that water cement
will be checked by the use of a ___ at sites selected ratio is not exceeded
by the Engineer 687. What is the percent weight of aggregates (coarse,
3 meter straight edge fne and mineral filler) in the mixture of Bituminous
673. What is the sample requirement for paving Concrete Surface Course?
concrete for every 75 m3 or fraction thereof? 92 – 95%
One (1) set (consisting of 3 pcs.) concrete beam 688. What is the percent weight of asphalt in the
sample bituminous mixture?
674. In testing bituminous mix sample for Immersion 5 to 8%
Compression Stability the sample is soaked in water 689. How can we establish the exact percentage to be
bath for ___ days used in the bituminous mixture?
Four (4) Job-mix formula
675. Given: 690. What are the two (2) types of bitumen that are
Wt. of dry aggregate = 950 g commonly used in bituminous concrete surface
Wt. of asphalt = 50 g course?
What is the total % of asphalt weight of total mix? Tar – is a viscous liquid obtained from distillation of
Wt of total mix = 950 + 50 = 1000 g coal or wood
50/1000 x 100 = 5% Petroleum Asphalt – are the products of the
676. Does the percent asphalt in problem above meet distillation of crude oil
the required specification for percent asphalt in 691. What are the three (3) major petroleum asphalt
bituminous mixes? Why? products
Yes, because standard specification for percent a. Asphalt cement – produced in various viscosity
asphalt in bituminous mixes is 5 to 8% grade, the most common penetration grade are
677. If the actual percent asphalt in the problem above 200/300, 120/150, 85/100, 40/50
is 5% and the percent asphalt in a job-mix 5.6% b. Cut back asphalt – are asphalt mixed with
did it pass the required tolerance? Why? solvents to reduce their viscosity
No, because the required tolerance for % asphalt in c. Emulsified Asphalt – are mixture of asphalt
a job-mix formula is ± 0.4% cement and water with emulsifying agent
678. Which is not the duty or responsibility of Materials 692. What are the solvents for cut back asphalt?
Engineer? a. gasoline – for rapid curing type
Quantity of construction materials b. kerosene – for medium curing type
c. diesel fuel – for slow curing type

28
MATERIALS ENGINEER
693. Emulsified asphalt are either ___ and ___ c. Laboratory density test – determines the degree
a. cationic emulsion – which work better with wet of compaction
agg and in cold weather 708. What is the correct temperature that the mixture
b. anionic emulsion – which adhere better to agg shall be placed as measured in the truck just prior
which have positive charges to dumping into the spreader?
694. What bituminous material commonly used in Item 107 °C
310? 709. When tar is used, what is the temperature that the
Asphalt Cement mixture shall be placed?
695. What greatly influence the service of an asphalt 66 °C to 107 °C
pavement? 710. When shall the compaction be done in order to
Grade and Quantity of Asphalt attain the required density?
696. What influenced primarily the grade of asphalt When the mixture is still hot and workable
selected? 711. How to determine the number of passes that would
Climatic Condition attain the required density?
697. The lower penetration grade or hard asphalt is Trial Section
used in 712. What control during the mixing and compaction is
Hot Climate of great significance in the strength of the resulting
698. The higher penetration grade or softer asphalt is pavement?
used in Temperature
Cold Climate 713. What kind of roller should be used for the initial or
699. How many weeks does a producer of asphalt mix breakdown compaction?
or the contractor shall submit the job-mix formula Pneumatic smooth wheeled roller (not less than 10
Three (3) weeks prior to production tons)
700. Who will approved the job-mix formula 714. What is the speed of the roller?
DPWH Project Engineer and Materials Engineer 5 km/hr
701. The Job-mix formula contains provisions on the 715. How is rolling be done?
following: It should begin from the side and proceed
a. Grading Aggregates longitudinally parallel toward the road centerline,
b. Percentage and type of asphalt each trip overlapping one half the rollers width.
c. Temperature of aggregates and asphalt 716. After the final rolling what should be checked?
d. Temperature of mixture upon delivery or at time Degree of Compaction
of compaction 717. The compacted pavement shall have a density
702. What is the primary quality control mechanism for equal to or greater than
the production of asphalt mixture? 97% of the laboratory compacted density
Job-mix formula which shall conform to the 718. When is the traffic be permitted to enter the
following ranges of Tolerance: pavement?
Passing No. 4 and larger sieves ±7% When the pavement has cooled to atmospheric
Passing No. 8 to No. 100 sieves ±4% temperature
Passing No. 200 sieves ±2% 719. How many samples shall be taken for each full
Bituminous Materials day’s operation?
±0.4% At least on but not more than three (3) core sample
Temperature of mixture ±10% 720. What is the dimension of the samples taken full
703. What is the minimum dry compressive strength of depth from the finished pavement for thickness
the mixture? determination?
1.4 Mpa (200 psi) 150 mm or 100 mm diameter
704. The mixture shall have a mass percent air voids 721. How is the sample taken from the finished
with a range of pavement?
3.0% to 5.0% By means of core drill or saw
705. What is the Index of Retained strength of the 722. How is the surface level of the finished pavement
mixture? being checked?
70% By the use of 3 meters straight edge
706. What is the most commonly used method in the 723. The variation of the surface from the testing edge
design and evaluation of bituminous concrete of the straight edge between contacts with the
mixes? surface shall not exceed
Marshall Stability Method 6 mm
707. The quality control tests for asphalt mix are the 724. What determines the thickness and density of
following: compacted asphalt pavement?
a. Immersion-Compression Test – determines the Core Test
Index of Retained Strength of the Mix 725. What is the strength requirement (flexural
b. Extraction and Grading Test – determines the strength) of a concrete when tested by third point
asphalt content and particle size distribution of loading method?
coarse and fine aggregates 3.8 Mpa (550 psi)

29
MATERIALS ENGINEER
726. What is the compressive strength of the PCCP 743. What is the metal device that are used as a load
when rested at 14 days? transfer device held in a position parallel to the
24.1 Mpa (3,500 psi) surface and centerline of the slab of pavement?
727. What is the slump of a workable concrete if not Dowels
vibrated? 744. To protect dowel from corrosion and to facilitate
40 – 75 mm, when vibrated the slump is 10 to 40 sliding in concrete, it shall be coated with
mm Thin Film of Bitumen
728. What kind of form used in Item 311? 745. The surface of the pavement shall be roughened
Steel Forms and a depth equal to the thickness of by means of
the pavement Brooming
729. How long shall the forms remain undisturbed after 746. What is the depth of corrugation produced by
concrete pouring brooming in the surface of the pavement?
24 hours 1.5 mm
730. What is the difference between Item 505 and Item 747. The surface of the newly placed concrete when it is
506 sufficiently set shall be cured for a period of
Placement of stone or boulders and the ratio of 72 hours
cement and Fine Sand 748. The curing of the pavement are done on the
731. What is the ratio of fine aggregates to number of following
bags of cement for group in item 505 to 506? a. By covering the concrete with mats saturated
For item 505 its one part cement to three parts fine with water
sand (1:3) b. Thoroughly wetting the pavement
For item 506 its one part cement to two parts fine c. By ponding
sand (1:2) d. By applying curing compound after finishing of
732. Penetration and ductility tests of asphalt are done the surface
in ___ temperature 749. When is the right time the joint be sealed?
25°C After the curing period or before it is opened to
733. This is the most fluid and lightest of all the grades traffic
of Medium Curing Cut-back asphalt 750. What is item 505 in DPWH Specifications?
MC - 30 Grouted Riprap
734. The only kind of asphalt that can be used in all 751. What is item 506 in DPWH Specifications?
Bituminous items of work Stone Masonry
Cut-back Asphalt 752. This is the empirical indicator of the clay fraction of
735. Retempering of concrete or mortar, which has a binder material in a stabilized soil mixture
partially hardened, will be permitted with the Plasticity Index
addition of cement, aggregate or water 753. When water is added to the mixture to bring the
No slump within required limit, it shall be injected into
736. What is the minimum number of representative the mixer under such pressure and direction of flow
cores that shall be taken from each member area of that the requirements for uniformity and desired
concrete in place that is considered deficient? slump of concrete are met. The drum shall be
3 cores turned on additional ___ revolution or more
737. The strength level of concrete will be considered 30 revolutions
satisfactory if the average of all sets of three (3) 754. Job mix formula submitted for approval shall
consecutive strength test results equal or exceed propose definite single values for, except
the specified strength and no individual strength Mixing Time of the mixture in the batching plant
test result is deficient by more than how many 755. For small contract project of the DPWH located in
percent? remote areas where the quantity of cement to be
15% used is to small and where there are no accessible
738. For major interchanges and busy intersection, testing laboratory to check the quality of materials,
PCCP will be allowed to open on the ___ to exception in the requirements for performance of
minimize occurrence of road congestion laboratory test in cement prior to use may be
7th day allowed provided that the trial mixes be done for
739. The width of the weaken plane joint is every
Not more than 6 mm Field Density of Soil
740. When is the right time to saw the weaken plane 756. How many days shall the Engineer be notified in
joint? advance of the date that the treating process will
Within 24 hours as soon as concrete has hardened be performed in order that the untreated timber,
sufficiently the treatment process and the finished treatment
741. What shall be done if cracks appear at or near the timber may be inspected?
joint prior to the time of sawing? 10 days
Sawing shall be omitted
742. Tie bars shall not be coated or painted with
Asphalt or other materials

30