RINCIAN BIAYA

PAKET : PENGAWASAN TEKNIS JALAN DAN JEMBATAN DI MALUKU BARAT DAYA

HARGA SATUAN TOTAL BIAYA


NO URAIAN SATUAN VOLUME
(Rp) (Rp)

TIM I
1 PRESERVASI REKONSTRUKSI JALAN TEPA - MASBUAR - LETWURUNG
- Pemeliharaan Rutin Jalan KM 33.00 825,000,000.00
- Rekonstruksi Jalan Tepa - Masbuar - Letwurung (Buka Hutan) KM 12.00 14,640,000,000.00
- Pemeliharaan Rutin Jembatan M 97.80 73,350,000.00
2 PRESERVASI REKONSTRUKSI JALAN LINGKAR P. MARSELA
- Pemeliharaan Rutin Jalan KM 17.00 425,000,000.00
- Rekonstruksi Jalan Lingkar P. Marsela (Buka Hutan) KM 17.00 18,020,000,000.00

A. BIAYA LANGSUNG PERSONIL


1 Profesional Staff
Site Engineer Bln 12 -
Ahli Kualitas Bln 12 -

2 Sub Profesional Staff


Inspector 1 Bln 12 -
Inspector 2 Bln 12 -
Surveyor 1 Bln 9 -
Surveyor 2 Bln 9 -
Material & Lab Technician 1 Bln 9 -
Material & Lab Technician 2 Bln 9 -

3 Supporting Staff
Operator Komputer Bln 12 -

Sub Total -

B BIAYA LANGSUNG NON PERSONIL


1 Mobilisasi / Demobilisasi
Site Engineer Return 1 -
Ahli Kualitas Return 1 -
Taxi from / to airport Return 2 -

2 Mobilisasi / Demobilisasi ke Lokasi


Site Engineer Return 1 -
Ahli Kualitas Return 1 -
Inspector Return 2 -
Surveyor Return 2 -
Material & Lab Technician Return 2 -
Operator Komputer Return 1 -
HARGA SATUAN TOTAL BIAYA
NO URAIAN SATUAN VOLUME
(Rp) (Rp)
3 Perjalanan Dinas untuk Rapat Koordinasi
Tiket/Ongkos Transportasi + Akomodasi lainnya Return 12 - -
Uang Harian OH 0 -
Uang Penginapan OH 0 -

5 Biaya Perjalanan Ke Pusat


Tiket/Ongkos Transportasi Return 1 - -
Uang Harian OH 5 -
Uang Penginapan OH 4 -

6 Sewa Kantor Bln 12 -


7 Sewa Rumah Profesional Staff Bln 12 -

8 Sewa Kamar Sub Profesional Staff Bln 12 -


9 Sewa Mobil dan Sepeda Motor
Sewa Kendaraan Roda 4 dan operasional Bln 12 -
Sewa Kendaraan Roda 2 (7 unit) dan operasional Bln 72 -

10 Sewa Genset Bln 12 -


11 Perlengkapan K3 (Savety Health) org / psg 8 -
- Baju + Rompi + Kaos + Topi + Helm
- Mantel Hujan
- Sepatu
- Helm Proyek
- Masker
- Kacamata

12 Bahan Operasional Kantor


a. Sewa Komputer + Printer A4 & A3 1 unit Bln 12 -
b. Sewa Laptop + Printer utk Site Engineer 1 unit Bln 12 -
c. Bahan Operasional Kantor Bln 12 -
d. Komunikasi Kantor (Telp, Fax, Internet, Pos) Bln 12 -

13 Laporan
Laporan RMK Buku 8 -
Laporan Pendahuluan + foto (7xPaket) Buku 14 -
Laporan Bulanan (7x5x Paket) Buku 154 -
Laporan Teknis (7xPaket) + CD Buku 14 -
Laporan Pengujian Mutu (7xPaket) + CD Buku 14 -
Laporan Akhir (7xPaket) Set 14 -

Sub Total -
Total TIM I -

HARGA SATUAN TOTAL BIAYA


NO URAIAN SATUAN VOLUME
(Rp) (Rp)

TIM II
1 PRESERVASI REKONSTRUKSI JALAN TIAKUR - WEET
- Pemeliharaan Rutin Jalan KM 21.95 548,750,000.00
- Pemeliharaan Rutin Jembatan KM 41.00 30,750,000.00
- Rekonstruksi Jalan Tiakur - Weet (054) KM 6.00 42,000,000,000.00
2 REHABILITASI JEMBATAN WEAR LIWU (60,055,003,0) M 6.00 900,000,000.00
3 PRESERVASI REKONSTRUKSI JALAN MANOHA - PELABUHAN
- Pemeliharaan Rutin Jalan KM - -
- Rekonstruksi Jalan Manoha - Pelabuhan KM - -

A. BIAYA LANGSUNG PERSONIL


1 Profesional Staff
Site Engineer Bln 12 -
Ahli Kualitas Bln 12 -

2 Sub Profesional Staff


Inspector 1 Bln 12 -
Inspector 2 Bln 7 -
HARGA SATUAN TOTAL BIAYA
NO URAIAN SATUAN VOLUME
(Rp) (Rp)
Surveyor 1 Bln 8 -
Surveyor 2 Bln 7 -
Material & Lab Technician 1 Bln 8 -
Material & Lab Technician 2 Bln 7 -

3 Supporting Staff
Operator Komputer Bln 12 -

Sub Total -

B BIAYA LANGSUNG NON PERSONIL


1 Mobilisasi / Demobilisasi
Site Engineer Return 1 -
Ahli Kualitas Return 1 -
Taxi from / to airport Return 2 -
2 Mobilisasi / Demobilisasi ke Lokasi
Site Engineer Return 1 -
Ahli Kualitas Return 1 -
Inspector Return 2 -
Surveyor Return 2 -
Material & Lab Technician Return 2 -
Operator Komputer Return 1 -

3 Perjalanan Dinas untuk Rapat Koordinasi


Tiket/Ongkos Transportasi + Akomodasi lainnya Return 12 -
Uang Harian OH 0 -
Uang Penginapan OH 0 -

5 Biaya Perjalanan Ke Pusat


Tiket/Ongkos Transportasi Return 1 -
Uang Harian OH 5 -
Uang Penginapan OH 4 -

6 Sewa Kantor Bln 12 -


7 Sewa Rumah Profesional Staff Bln 12 -

8 Sewa Kamar Sub Profesional Staff Bln 12 -

9 Sewa Mobil dan Sepeda Motor


Sewa Kendaraan Roda 4 dan operasional Bln 12 -
Sewa Kendaraan Roda 2 (7 unit) dan operasional Bln 61 -

10 Sewa Genset Bln 12 -

11 Perlengkapan K3 (Savety Health) org / psg 8 -


- Baju + Rompi + Kaos + Topi + Helm
- Mantel Hujan
- Sepatu
- Helm Proyek
- Masker
- Kacamata
12 Bahan Operasional Kantor
a. Sewa Komputer + Printer A4 & A3 1 unit Bln 12 -
b. Sewa Laptop + Printer utk Site Engineer 1 unit Bln 12 -
c. Bahan Operasional Kantor Bln 12 -
d. Komunikasi Kantor (Telp, Fax, Internet, Pos) Bln 12 -

13 Laporan
Laporan Pendahuluan + foto (7xPaket) Buku 14 -
Laporan Bulanan (7x5x Paket) Buku 112 -
Laporan Teknis (7xPaket) + CD Buku 14 -
Laporan Pengujian Mutu (7xPaket) + CD Buku 14 -
Laporan Akhir (7xPaket) Set 14 -

Sub Total -
Total TIM II -
REKAPITULASI BIAYA
HARGA PERHITUNGAN SENDIRI (HPS)

SATUAN KERJA : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU

PEKERJAAN : PENGAWASAN TEKNIS JALAN DAN JEMBATAN DI MALUKU BARAT DAYA

LOKASI : PULAU BABAR, MARSELA, MOA, DAN LETI

JANGKA WAKTU : 12 (DUA BELAS) BULAN

SUMBER DANA : APBN 2018

No. URAIAN JUMLAH (Rp.)

TIM I

1.1 BIAYA LANGSUNG PERSONIL -

1.2 BIAYA LANGSUNG NON PERSONIL -

TIM II

1.1 BIAYA LANGSUNG PERSONIL -

1.2 BIAYA LANGSUNG NON PERSONIL -

TOTAL SUB BIAYA -

PPN 10 % -

TOTAL BIAYA -

DIBULATKAN -

TERBILANG :

Ambon, ………………………………... 2017

PT …………………………………

…………………………………………………..
(Direktur Utama / Kepala Cabang)