POWER HOUSE Doc.REF.NO: PH-IMS-SP10-FR01


REV/ISSUE: 02/01

NON CONFIRMITY DATE : 07/02/2016

REPORT Pages :2

1-Identification:
Originator Name: Alaa Sobh Moawad Date: 17/1/2017 Code: 231 CR 49
Supplier: PR.NO: NCR NO.: ( 7-2 ) GR
W.O NO: ( 11 / 2017 ) Part Description: CAT 3306
Part NO: Drawing NO/SAMPLE:
Quantity:
Found in What Activity? 1. Incoming
2. In- Process Inspection
3. Final Inspection
4. Other

2- Description of non-conformity

1- No concentration at coolant.
2- No GPR system and no KW.hr reading.

3- Recommended Action:

Page 1 of 3
2

Name: Designation: Signature:

Disposition: Date:

 Use as is  Return to Supplier


 Repair  Reject
 Rework  Request Concession
 Other
Name: Designation: Signature:

4- Correction Action

Responsible manager Responsible Sector Manager

Signature &Date Signature &Date

5- Approval of correction

QC manager Signature &Date


Page 2 of 3
3

17- Closing of non-conformity

NON CONFORMANCE CLOSURE:


Planned disposition is accepted, and has been completed as required. Corrective and preventative has been initiated and
changes/recommendations implemented.

Name; Designation: Signature: