POWER HOUSE Doc.REF.NO: PH-IMS-SP10-FR01


REV/ISSUE: 03/01

NON CONFIRMITY DATE : 7-11-2016

REPORT Pages :

1-Identification:
Originator Name: MOHAMED HAMED Date: 3/1/2018 Code: 261
Supplier: PR.NO NCR NO.: (1)2018 GR
WO.NO: Part Description:
Part NO: Drawing NO/SAMPLE:
Quantity:
Found in What Activity?  Incoming
 Inspection In-
 Process Inspection
 Final Inspection
 Other

2- Description of non-conformity

When we inspect generator code (261)found that


1- Water inside radiator is not clean.
2- oil drain valve is leaking.
3- Air filters is dirty ( we borrow filters from other engine to can
perform the test).
4- Circut breaker trip many times at many load it reads about
"3000A and its real value 1400 A" we borrow breaker panel from
engine 320 to can perform the test.
5- Side electrical box close to marsh need to fix in place properly.
6- AVR box cover need to fix inplace.
7- Prefuel filters is dirty.
8- Guages at the side module need to fix inplace properly.
9- Exhaust tempreture guages on the side panel not working.
10-Fire extinguisher not exsist on the side rack of the container.
11-Water reading value on the comap screen is lower than the real
one by about 10 deg.
12-Oil leak near the actuator.
13-scratches in some spots of the container body.
14-the equipment fixed to the skid with just 2 bolts.

3- Root causes:

Page 1 of 3
2

Name: Designation: Signature:

Disposition: Date:
 Use as is  Return to Supplier
 Repair  Reject
 Rework  Request Concession
 Other
Name: Designation: Signature:

4- Correction Action

Responsible manager Responsible Sector Manager

Signature &Date Signature &Date

5- Approval of correction

QC manager Signature &Date

17- Closing of non-conformity

NON CONFORMANCE CLOSURE:


Planned disposition is accepted, and has been completed as required. Corrective and preventative has been initiated and