You are on page 1of 2

BRIEF NOTE

Name of work : Construction of New Suit to existing


(R&B) Inspection Bungalow Kakinada

Estimate Amount : Rs. 25.25 Lakhs

Plinth Area : 1290 Sq. Ft

Funds : GSPC CSR funds

Administrative Sanction : C4/M/719/2013 dt.29.05.2013 of the District


Collector and Magistrate, E.G.District, Kakinada

Provisions Provided : 1. Construction of new suit by facilitating the


drawing room and mini conference hall

2. Providing water supply and sanitary items

3. Providing Electrification
2

BRIEF NOTE

Name of work : Construction of R.O.B. in lieu of L.C. No.426 at


railway km 629/1-3 at Samalkot in km 0/2-4 on
Samalkota Uppada road

Administrative Sanction : Yet to be sanctioned.

Technical Sanction : Yet to be sanctioned.

Present Status : Detailed Survey with Total Station conducted.


Alignment proposals are under preparation with
the consultation of Railway authorities.

You might also like