CPR CONSTRUCTIONS

ANNEXURE TO BILL NO ,CPR/DLL/01/2016-17


Item Previous Present
Sl No Description of work No's Length Breadth Depth Total Quantity Unit
no Quantity Quantity
1 5 P.C.C Laying for footings of service block-F 1 x 22 2.6 2.3 0.1 13.156 0 13.156 Cum
P.C.C Laying for plinth beams of service block-F 1 x 6 5.25 0.45 0.075 1.063125 0 1.063125 Cum
1 x 8 5.25 0.45 0.075 1.4175 0 1.4175 Cum
1 x 2 5.05 0.45 0.075 0.340875 0 0.340875 Cum
1 x 1 5.25 0.45 0.075 0.1771875 0 0.1771875 Cum
16.155 0 16.335 Cum
2 7a RCC Laying for footings of service block-F
1st step 1 x 22 2.4 2.1 0.4 44.352 0 44.352 Cum
2nd step 1 x 22 1.55 1.25 0.5 21.313 0 21.313 Cum
65.665 0 65.665 Cum

3 7g RCC laying for pedestals upto plinth top 1 x 22 0.45 0.75 2.24 16.632 0 16.632 Cum

4 7b RCC laying for plinth beams


bet.F1toB1,F2toB2 &E4toB4 1 x 8 5.55 0.3 0.45 5.994 0 8.991 Cum
bet.F4toF1,B4toB1 1 X 6 5.25 0.3 0.45 4.2525 0 4.253 Cum
Between B1 to A1 & B2 to A2 1 X 2 5.05 0.3 0.45 1.3635 0 1.363
Between A1 to A2 1 X 1 5.25 0.3 0.45 0.70875 0 0.709
12.31875
5 7h Colomns Cum
C olumns up to 4mts 1 x 20 0.30 0.60 4.00 14.4 0 14.4 Cum
1 x 2 0.30 0.60 4.00 1.44 0 1.44 Cum
15.84 0 29.716 Cum
6 7h Colomns up to hight (6.58) Mts4.00MT TO8.00MTS 1 x 12 0.30 0.60 1.13 2.4408 0 2.4408 Cum
Colomns up to hight (5.58) Mts 1 x 8 0.30 0.60 2.13 3.0672 0 3.0672 Cum

5.508 0 5.508 cum


7 8 Reinforcement steel C/B/Tying
Footings F1
Bottom Reinforcement 12MM 22 14 2.452 0.89 672.14224 0 672.14224 Kg
12MM 22 16 2.152 0.89 674.17856 0 674.17856 Kg
Top Reinforcement 10MM 22 8 2.86 0.62 312.0832 0 312.0832 Kg
10MM 22 9 2.56 0.62 314.2656 0 314.2656 Kg
10MM 22 5 3.01 0.62 205.282 0 205.282 Kg
10MM 22 6 2.71 0.62 221.7864 0 221.7864 Kg
Pedestals 12MM 22 8 3.409 0.89 533.98576 0 533.98576 Kg
Stirrups 8MM 22 14 2 0.395 243.32 0 243.32 Kg
Colomns upto plinth top 25MM 22 6 3.533 3.85 1795.4706 0 1795.4706 Kg
Stirrups 8MM 22 13 1.58 0.395 178.4926 0 178.4926 Kg
Colomns upto slab level 25MM 10 6 6.73 3.85 1554.63 0 1554.63 Kg
Stirrups 8MM 10 28 1.58 0.395 174.748 0 174.748 Kg
6880.38496 6880.385 Kg
8 7d RCC laying for beams with slab @ 8.00lvl of FPWH-2

Beams upto slab bottom


B1 1 x 2 19.53 0.3 0.45 5.2731 0 5.2731 Cum
1 x 4 6.68 0.3 0.45 3.6072 0 3.6072 Cum
B2 1 x 1 3 0.3 0.15 0.135 0 0.135 Cum
1 x 1 17.13 0.3 0.3 1.5417 0 1.5417 Cum
B3 1 x 1 23.35 0.3 0.15 1.05075 0 1.05075 Cum
1 x 1 8.9 0.3 0.15 0.4005 0 0.4005 Cum
B4 1 x 4 2.11 0.3 0.3 1.97 0 1.97 Cum
1 x 2 1.72 0.3 0.3 0.3096 0 0.3096 Cum

B5 Middle Beam
Slab 1 x 1 9.8 23.35 0.15 34.3245 0 34.3245 Cum
Colomns 1 x 4 0.3 0.45 0.45 0.243 0 0.243 Cum
1 x 4 0.45 0.45 0.45 0.3645 0 0.3645 Cum
49.22 49.21985 Cum
Authorised By Contractor Checked by Engg(Dept) Cross checked & Verified by (Dept) Approved By (Dept)
CPR CONSTRUCTIONS
ANNEXURE TO BILL NO ,CPR/DLL/01/2016-17
Ite
Length Bread Total Previous
m Description of work No's th Depth Quantity Quantity
no
8 Reinforcement C/B/Tying Plinth beams of service block -F
BET. F1&D1,D1&B1,F2&D2,D2&B2 andF4& D4
Main bar bottom & Top 16mm 2 5 24.9 1.58 392.63 0
16mm 2 10 0.8 1.58 25.28 0
Stirrupps 8mm 2 96 1.276 0.395 96.77184 0
BET. F4&F1,B4&B1, 514.68184
Main bar bottom & Top 16mm 2 5 19.5 1.58 308.1 0
16mm 2 5 0.8 1.58 12.64 0
Stirrupps 8mm 2 68 1.276 0.395 68.54672 0
BET. A4 & D4 389.28672
Main bar bottom & Top 16mm 2 5 6.1 1.58 96.38 0
Stirrupps of work 8mm 2 23 1.276 0.395 23.18492 0
A3 TO A4 16mm 1 5 6.85 1.58 54.115 0
Stirrups 8mm 1 25 1.276 0.395 12.6005 0
Slab & Beams At 8Mt lvl Of FPWH-2 186.28042
Beam B1 Along H Gried
Bottom Main Bar 25mm 2 3 23.45 3.85 541.695 0
Lap 25mm 2 2*3 1.25 3.85 57.75 0
Top Main Bar 20mm 2 2 23.45 2.47 231.686 0
Lap 20mm 2 2*2 1 2.47 19.76 0
Top Extra Bar 20mm 1 6*3 3.6 2.47 160.056 0
Stirrupps 10MM 2 99 1.77 0.617 216.23 0
In Slope Beam 10MM 2 7 1.43 0.617 12.35 0
Beam B1 Along 3,4,5 and 6 Gried 1239.53
Bottom Main Bar 25mm 3 4 10.15 3.85 468.93 0
Top Main Bar 20mm 2 4 10.15 2.47 200.56 0
Top Extra Bar 20mm 4 3 4.7 2.47 139.31 0
Top Extra Bar 20mm 4 3 2.25 2.47 66.69 0
sterips 10MM 4 33 1.77 0.617 144.16 0
10MM 4 10 1.43 0.617 35.29 0
Beam B2 center 1054.94
Top Main Bar 16mm 1 2 21.63 1.58 68.35 0
Lap 16mm 1 4 0.8 1.58 5.06 0
TopExtra 20mm 1 1 2.7 2.47 6.67 0
20mm 1 2 3.6 2.47 17.78 0
sterips 10mm 1 99 1.4 0.617 85.52 0
Beam B3 20mm 1 1 1.95 2.47 4.82 0
Top Main Bar 16mm 1 2 10.02 1.58 31.66 0
Bottom Main Bar 20mm 1 3 10.02 2.47 74.25 0
Stirrupps 10mm 1 45 0.976 0.617 27.10 0
321.20
Beam B3 between 2 & 6 grids
Top Main Bar
16mm 1 2 23.45 1.58 74.10 0
Lap 16mm 1 2*2 0.8 1.58 5.06 0
Bottom Main Bar 20mm 1 3 23.45 2.47 173.76 0
Lap 20mm 1 2*3 1 2.47 14.82 0
Stirrupps 10mm 1 108 0.976 0.617 65.04 0
slab reinforcement 10mm 1 180 9.8 0.62 1093.68 0
10mm 1 69 23.35 0.62 998.91 0
Lap 10mm 1 69 0.5 0.62 21.39 0
Extra reinforcement 10mm 1 180 2.2 0.617 244.33 0
10mm 1 180 4.7 0.617 521.98 0
10mm 1 21 23.35 0.617 302.55 0
10mm 4 35 3.6 0.617 310.97 0
10mm 5 14 9.8 0.617 423.26 0
4249.85
7955.78

Authorised By Contractor Checked by Engg(Dept) Cross checked & Verified by (Dept)


Present Unit
Quantity

392.63 KG
25.28 KG
96.77184 KG
514.68184
308.1 KG
12.64 KG
68.54672 KG
389.28672
96.38 KG
23.18492 KG
54.115 KG
12.6005 KG
186.28042

541.695 KG
57.75 KG
231.686 KG
19.76 KG
160.056 KG
216.23382 KG
12.35234 KG
1239.53316
468.93 KG
200.56 KG
139.31 KG
66.69 KG
144.16 KG
35.29 KG
1054.94028
18.96 KG
15.28 KG
15.28 KG
15.28 KG
85.52
4.82 KG
31.66 KG
74.25 KG
27.10 KG
321.20254
74.10 KG
5.06 KG
173.76 KG
14.82 KG
65.04 KG
1093.68 KG
998.91 KG
21.39 KG
244.33 KG
521.98 KG
302.55 KG
310.97 KG
423.26 KG
4249.85
7955.78 KG

Approved By (Dept)
CPR CONSTRUCTIONS
ANNEXURE TO BILL NO ,CPR/DLL/01/2016-17
BILL ABSTRACT
QUANTITY AMOUNT

S.No. Item Description of work Unit Rate Up to and As per Since Up to and As per Since
no Including Previous Previous Including Previous Previous Bill
This Bill Bill Bill This Bill Bill

1 5 P.C.C Laying for footings of service block-F Cum 2145 16.335 0 16.335 35038.575 0 35038.575
2 7a RCC laying for putting Cum 4285 65.665 0 65.665 281374.525 0 281374.525
3 7g RCC laying for pedastals Cum 5095 16.632 0 16.632 84740.04 0 84740.04
4 7b RCC laying for Plinth beams Cum 5782 12.318 0 12.318 71222.676 0 71222.676
5 7h RCC laying for colomns(Height above 4 mts) Cum 5724 15.84 0 15.84 90668.16 0 90668.16

6 7d RCC laying for beams with slab of service block


-F(Height above 4 mts) Cum 6360.2 57.607 0 57.607 366392.041 0 366392.041

7 8 The Reinforcement steel C/B/Tying(Height above


4 mts) M.T. 5665 8.49 0 8.49 48095.85 0 48095.85
8 8 The Reinforcement steel C/B/Tying M.T. 5150 10.539 0 10.539 54275.85 0 54275.85
9 Supply of labour for Dressing of footings and
plinth beams
Male Coolie No's 300 28 0 28 0 0
Female Coolie No's 220 40 0 40 0 0
Total 1031807.7 1031807.7
Deductions
10 34 RMC supply with pump Cum 2500 74 0 74 185000 0 185000
Total 846807.72 846807.72

Authorised By Contractor Checked by Engg(Dept) Cross checked & Verified by (Dept) Approved By (Dept)
Approved By (Dept)
CPR CONSTRUCTIONS
ANNEXURE TO BILL NO ,CPR/DLL/01/2016-17

Sl.No. Date Description of Work No. of Male Coolie No. of Female Coolie

1 26-12-15 Area Dressing for Footings 6 10

2 27-12-15 Area Dressing for Footings 5 10

3 28-12-15 Area Dressing for Footings 4 5

4 29-12-15 Area Dressing for Footings 2 4

5 30-12-15 Area Dressing for Footings 7 7

6 31-12-15 Area Dressing for Footings 4 4

Total 28 40

Authorised By Contractor Checked by Engg(Dept) Cross checked & Verified by (Dept) Approved By (Dept)
Approved By (Dept)
CPR CONSTRUCTIONS
11-2-8/1, 201, Jyothi Residency, Dasapalla Hills, Visakhapatnam-530003, A.P.
Contact: 9000051919j, Mail ID: cpr.eng@gmail.com
Inv. No. CPR/DLL/01/2016-17
Date: 21/04/2016
M/s Divi's Laboratories Limited
Chippada Village, Annavaram Post, Our PAN No. AACFC9332K
Bheemunipatnam Mandal, Service Tax No. AACFC9332KST001
Visakhapatnam - 531162 TIN No. 37605102600

Work Order No. 1530320680, Dt: 12-01-2016


Sl.No. Description Qty. Rate Rs. Amount RS
1 First and part bill of FB Warehouse II super structure and
foundation, sub structure of service block Total 846808 846808

Total 846808 846808


(Rupees (In Words): Eight Lakhs Thirty six Thousand two Hundred sixteen Only

Authorised By Contractor Checked by Engg(Dept) Cross checked & Verified by (Dept) Approved By (Dept)
CPR CONSTRUCTIONS
ANNEXURE TO BILL NO ,CPR/DLL/01/2016-17
Item
Sl No Description of work No's Length
no
1 5 P.C.C Laying for footings of service block-F 1 x 22 2.6
P.C.C Laying for plinth beams of service block-F 1 x 6 5.25
1 x 8 5.25
1 x 2 5.05
1 x 1 5.25

2 7a RCC Laying for footings of service block-F


1st step 1 x 22 2.4
2nd step 1 x 22 1.55

3 7g RCC laying for pedestals upto plinth top 1 x 22 0.45

4 7b RCC laying for plinth beams


bet.F1toB1,F2toB2 &E4toB4 1 x 8 5.55
bet.F4toF1,B4toB1 1 X 6 5.25
Between B1 to A1 & B2 to A2 1 X 2 5.05
Between A1 to A2 1 X 1 5.25

5 7h Colomns
C olumns up to 4mts 1 x 20 0.30
1 x 2 0.30

6 7h Colomns up to hight (6.58) Mts4.00MT TO8.00MTS 1 x 12 0.30


Colomns up to hight (5.58) Mts 1 x 8 0.30

7 8 Reinforcement steel C/B/Tying


Footings F1
Bottom Reinforcement 12MM 22 14 2.452
12MM 22 16 2.152
Top Reinforcement 10MM 22 8 2.86
10MM 22 9 2.56
10MM 22 5 3.01
10MM 22 6 2.71
Pedestals 12MM 22 8 3.409
Stirrups 8MM 22 14 2
Colomns upto plinth top 25MM 22 6 3.533
Stirrups 8MM 22 13 1.58
Colomns upto slab level 25MM 10 6 6.73
Stirrups 8MM 10 28 1.58
Authorised By Contractor Checked by Engg(Dept)
UCTIONS
PR/DLL/01/2016-17
Previous Present
Breadth Depth Total Quantity Unit
Quantity Quantity
2.3 0.1 13.156 0 13.156 Cum
0.45 0.075 1.063125 0 1.063125 Cum
0.45 0.075 1.4175 0 1.4175 Cum
0.45 0.075 0.340875 0 0.340875 Cum
0.45 0.075 0.1771875 0 0.1771875 Cum
16.155 0 16.335 Cum

2.1 0.4 44.352 0 44.352 Cum


1.25 0.5 21.313 0 21.313 Cum
65.665 0 65.665 Cum

0.75 2.24 16.632 0 16.632 Cum

0.3 0.45 5.994 0 8.991 Cum


0.3 0.45 4.2525 0 4.253 Cum
0.3 0.45 1.3635 0 1.363
0.3 0.45 0.70875 0 0.709
12.31875
Cum
0.60 4.00 14.4 0 14.4 Cum
0.60 4.00 1.44 0 1.44 Cum
15.84 0 29.716 Cum
0.60 1.13 2.4408 0 2.4408 Cum 2.16
0.60 2.13 3.0672 0 3.0672 Cum
5.508 0 5.508 cum

0.89 672.14224 0 672.14224 Kg


0.89 674.17856 0 674.17856 Kg
0.62 312.0832 0 312.0832 Kg
0.62 314.2656 0 314.2656 Kg
0.62 205.282 0 205.282 Kg
0.62 221.7864 0 221.7864 Kg
0.89 533.98576 0 533.98576 Kg
0.395 243.32 0 243.32 Kg
3.85 1795.4706 0 1795.4706 Kg
0.395 178.4926 0 178.4926 Kg
3.85 1554.63 0 1554.63 Kg
0.395 174.748 0 174.748 Kg
6880.38496 6880.385 Kg

Cross checked & Verified by (Dept) Approved By (Dept)


CPR CONSTRUCTIONS No1

BILL ABSTRACT no1

QUANTITY AMOUNT
Up to As per
S.No. Item Description of work Unit Rate Since
and Previou Previous Up to and As per
no Including Previo
Including s Bill Bill This Bill us Bill
This Bill
SERVICE BLOCK-F
P.C.C Laying for footings of
1 5 service block-F
Cum 2145 16.335 0 16.335 35038.575 0
2 7a RCC laying for putting
Cum 4285 65.665 0 65.665 281374.53 0
3 7g RCC laying for pedastals
Cum 5095 16.632 0 16.632 84740.04 0
4 7b RCC laying for Plinth beams
Cum 5782 12.318 0 12.318 71222.676 0
RCC laying for colomns(Height
5 7h above 4 mts)
Cum 5724 15.84 0 15.84 90668.16 0
The Reinforcement steel
6 8 C/B/Tying
M.T. 5150 10.539 0 10.539 54275.85 0
Deductions

7 34 RMC supply with pump


Cum 2500 24.78 0 24.78 -61950 0
NET PAYEMENT Rs
555369.83

Total 555370

Authorised By Contractor Checked by Engg(Dept)

Cross checked & Verified by (Dept) Approved By (Dept)


AMOUNT

Since
Previous Bill

35038.575
281374.525
84740.04
71222.676

90668.16

54275.85

-61950
555369.83

555369.83
CPR CONSTRUCTIONS
ANNEXURE TO BILL NO ,CPR/DLL/01/2016-17
BILL ABSTRACT NO 2
QUANTITY
S.No Item Description of work Unit Rate Up to and As per Since
. no Including Previous Previous
This Bill Bill Bill
RCC laying for beams with slab of
service block -F(Height above 4 mts)
6 7d
Cum 6360 57.607 0 57.607
The Reinforcement steel
7 8 C/B/Tying(Height above 4 mts)
M.T. 5665 7.95 0 7.95
Total
Deductions
10 34 RMC supply with pump Cum 2500 57.607 0 57.607

NET PAYEMENT Rs

Authorised By Contractor Checked by Engg(Dept)

Cross checked & Verified by (Dept) Approved By (Dept)


AMOUNT
Up to and As per Since
Including Previou Previous
This Bill s Bill Bill

366392 0 366392

45036.75 0 45036.75
411428.8 411429

144017.5 0 144017.5

267411.3 267411

Checked by Engg(Dept)

Approved By (Dept)
CPR CONSTRUCTIONS

Ref, workorder No DT 25,05,2016


INVOICE NO:1
To Date ,25.05.2016
The Dives Laboratories Ltd 100% EOU Unit
EOU
Chippada,Vizag
BILL SUMMARY
S.No. Asset No DESCRIPTION TOTAL PREVIOUS PRESENT
1 CONSTRUCTION of CIVIL WORK AT
SERVICE BLOCK -F 617319.83 0.00 617319.83

TOTAL PAYEMENT Rs 617319.83 0.00 617319.83

Deductions
RMC supply with pump -61950 0.00 -61950

NET PAYEMENT Rs 555369.83 0.00 555369.83


PAN NO:
SERVICE TAX NO :
CATEGORY TAX NO : Construction Services in respect of Commercial or Industrial Buildings &Civil
Struvtures
TIN NO :

Authorised By Contractor Checked by Engg(Dept)

Cross checked & Verified by (Dept) Approved By (Dept)


CPR CONSTRUCTIONS
Ref, workorder No DT 25,05,2016
INVOICE NO:2
To Date ,25.05.2016
The Dives Laboratories Ltd 100% EOU Unit
EOU
Chippada,Vizag
BILL SUMMARY
S.No. Asset No DESCRIPTION TOTAL PREVIOUS PRESENT
1 CONSTRUCTION of CIVIL WORK AT
SERVICE BLOCK -F 411428.79 0.00 411428.79

TOTAL PAYEMENT Rs 411428.79 0.00 411428.79

Deductions
RMC supply with pump -144017.5 0.00 -144017.5

NET PAYEMENT Rs 267411.29 0.00 267411.29


PAN NO:
SERVICE TAX NO :
CATEGORY TAX NO : Construction Services in respect of Commercial or Industrial Buildings &Civil
Struvtures
TIN NO :

Authorised By Contractor Checked by Engg(Dept)

Cross checked & Verified by (Dept) Approved By (Dept)