You are on page 1of 2

1

POWER HOUSE Doc.REF.NO: PH-IMS-SP10-FR01


REV/ISSUE: 02/01

NON CONFIRMITY DATE : 07/02/2016

REPORT Pages :2

1-Identification:
Originator Name: Alaa Sobh Moawad Date: 25/12/2017 Code: 1P026CME0121
Supplier: PR.NO: NCR NO.: 45 PP
W.O NO: ( 17 / TC / 023 ) Sales Part Description: WKF 65 / 6
Part NO: Drawing NO/SAMPLE:
Quantity:
Found in What Activity? 1. Incoming
2. In- Process Inspection
3. Final Inspection
4. Other

2- Description of non-conformity

When we inspect the pump code 1P026CME0121 we found that :


1- The vibrations of pump are out of acceptance limits according to last report.
2- Coupling is broken.
3- Housing of bearing is broken.
4- Legs of pumps are broken.

3- Recommended Action:

Name: Designation: Signature:

Page 1 of 2
2

Disposition: Date:

 Use as is  Return to Supplier


 Repair  Reject
 Rework  Request Concession
 Other
Name: Designation: Signature:

4- Correction Action

Responsible manager Responsible Sector Manager

Signature &Date Signature &Date

5- Approval of correction

QC manager Signature &Date

17- Closing of non-conformity

NON CONFORMANCE CLOSURE:


Planned disposition is accepted, and has been completed as required. Corrective and preventative has been initiated and
changes/recommendations implemented.

Name; Designation: Signature:

Page 2 of 2

You might also like