CGC INSPECTION RESULTS

DISCI
RFI NO DESCRIPTION DATE TIME
PLINE

Lean Concrete Pouring Inspection for VIS Foundation 8:30 AM


270-C02-CVL-RFI-3013 1-Mar-15 CIVIL
for IS#01,02 in Lot-07 & 10

Pre Concrete Pouring and Concrete Pouring Inspection


270-C02-CVL-RFI-3005
for LV Panel Foundation for SS#01,SS#02,SS#03 & 1-Mar-15 CIVIL 9:00 AM
(Reschedule) SS#04 (04 Pcs) at Laydown Yard

Pre Concrete Pouring and Concrete Pouring Inspection


270-C02-CVL-RFI-3006 for MV Duct Bank Across Proposed Railway line and
1-Mar-15 CIVIL 9:30 AM
(Reschedule) Concrete Channel in Between L.S-02 & SS#04 (From
East 44 M) in Lot-12

Pre Concrete Pouring and Concrete Pouring Inspection


270-C02-CVL-RFI-3008
for LV Duct Bank (17m & 29 m) Near T.S-08 at Power 1-Mar-15 CIVIL 10:00 AM
(Reschedule) Row -0+050 & 0+100 in Lot-13

Pre Concrete Pouring and Concrete Pouring Inspection


270-C02-CVL-RFI-3014 1-Mar-15 CIVIL 10:30 AM
for IS#01 Column in Lot-07

Lean Concrete Pouring Inspection for Telecom Manhole


270-C02-CVL-RFI-3015 1-Mar-15 CIVIL 11:00 AM
Type-A (2 Pcs) Along Road T-305 in lot-05

Sub Grade FDT for Retention Channel in Lot Area Near


270-C02-CVL-RFI-3016 South Contract Limit at Road STA-6+930 to 7+250 in 1-Mar-15 CIVIL 11:30 AM
Lot-07

270-C02-CVL-RFI-3017 Membrane Installation Inspection for l.S-07 in Lot-07 1-Mar-15 CIVIL 2:00 PM

Protection Board Installation Inspection for JB2-


270-C02-CVL-RFI-3018 1-Mar-15 CIVIL 2:30 PM
50,51,52 in Lot-14

Pre Concrete Pouring and Concrete Pouring Inspection


270-C02-CVL-RFI-3019 1-Mar-15 CIVIL 3:00 PM
for MV Duct Bank Near L.S-05 in Lot-08

Pre Concrete Pouring and Concrete Pouring Inspection


270-C02-CVL-RFI-3020 1-Mar-15 CIVIL 3:30 PM
for LV Duct Bank Near L.S-01 in Lot-13
270-C02-CVL-RFI-3009 2nd Layer Backfilling FDT Around Lift Station-06 in 4:00 PM
1-Mar-15 CIVIL
(Reschedule) Lot-08

270-C02-CVL-RFI-3012 2nd Layer Backfilling FDT Around MOI Tower in Lot-


1-Mar-15 CIVIL 4:30 PM
(Reschedule) 01

270-C02-CVL-RFI-3003 Final Layer Backfilling FDT for Road T-334 from STA-
1-Mar-15 CIVIL 5:00 PM
(Reschedule) 6+650 to 7+000 in Lot-07

Pre Concrete Pouring and Concrete Pouring Inspection


270-C02-CVL-RFI-3021 for Curbstone from STA-(6+350 to 6+650 (NC) in Lot- 1-Mar-15 CIVIL 8:00 AM
06

PREPARED BY: M. ABDUR REHMAN


DATE 1­Mar­15

CONT NO 270­C02

LOCTATION REMARKS

LOT 07 & 10 FINISHED

Laydown Yard FINISHED

LOT 12 FINISHED

LOT 13 FINISHED

PRE POUING APPROVED,


LOT 07
CONCRETE NOT POURED

LOT 05 FINISHED

LOT 07 POSITIVE

LOT 07 ONGOING, RESCHEDULE

LOT 14 ONGOING, RESCHEDULE

PRE POUING APPROVED,


LOT 08
CONCRETE NOT POURED

PRE POUING APPROVED,


LOT 13
CONCRETE NOT POURED
LOT 08 APPROVED

LOT 01 APPROVED

LOT 07 APPROVED

LOT 06 FINISHED