Inspection for Electrical Conduits in canopy slab pre pour stage (Highlight
1 FT-MEP SDMC-100-IR-MEP-FT-0005 00 BLDG 18-Feb-24 10:00 AM
Drawing attached)
Inspection for Admin building 2nd lift columns (2nos) at Grid 3 (Stair
2 AB SDMC-100-IR-CW-AB-0054 02 landing area) in 1st Floor reinforcement, pre pour form work and Concrete BLDG 18-Feb-24 FOR APPROVAL
(Dwg attached)
Inspection for Lift Wall form work and casting at 2nd Floor as Highlighted
3 AB SDMC-100-IR-CW-AB-0067 01 BLDG 18-Feb-24 11:30 AM
on drawing - Administration Building
Inspection for Plinth beam form work and concrete pouring at Fish Auction
5 FAH SDMC-100-IR-CW-FA-0026 01 BLDG 18-Feb-24 10:00 AM
Hall (Highlighted Dwg attached)
Page 1 of 4
Development of Fishery Harbour in Dibba at Musandam Governorate
MATERIAL & WORK INSPECTION REQUEST SCHEDULE Date: 17-Feb-2024
Please be advised that the following elements of work will be available for inspection on 18-Feb-2024
PARTICIPANT TYPE Duration
Rev. SUB -
Sl# AREA/UNIT/ITEM WIR / MIR NO. DESCRIPTION OF INSPECTION DISCIPLINE DATE / TIME (Hours or Days) REMARKS
Nos, CON Contractor Engineer Employer Others
Inspection For Excavation and blinding for light pole SLP-D-34, SLP-D-35,
28 INFRA-G SDMC-100-IR-INFRA-G-0912 02 INFRA 18-Feb-24 10:30 AM
SLP-D-36
Page 2 of 4
Development of Fishery Harbour in Dibba at Musandam Governorate
MATERIAL & WORK INSPECTION REQUEST SCHEDULE Date: 17-Feb-2024
Please be advised that the following elements of work will be available for inspection on 18-Feb-2024
PARTICIPANT TYPE Duration
Rev. SUB -
Sl# AREA/UNIT/ITEM WIR / MIR NO. DESCRIPTION OF INSPECTION DISCIPLINE DATE / TIME (Hours or Days) REMARKS
Nos, CON Contractor Engineer Employer Others
Page 3 of 4
Development of Fishery Harbour in Dibba at Musandam Governorate
MATERIAL & WORK INSPECTION REQUEST SCHEDULE Date: 17-Feb-2024
Please be advised that the following elements of work will be available for inspection on 18-Feb-2024
PARTICIPANT TYPE Duration
Rev. SUB -
Sl# AREA/UNIT/ITEM WIR / MIR NO. DESCRIPTION OF INSPECTION DISCIPLINE DATE / TIME (Hours or Days) REMARKS
Nos, CON Contractor Engineer Employer Others
Joint Survey Inspection for 3 ~ 6 Ton Layer From Sta. 0+260 to Sta.
64 JOINT SURVEY SDMC-100-IR-12281 02 0+270 (Crest) Level till +6.50 at Lee Breakwater. (as per the attached Marine 18-Feb-24 FOR APPROVAL
Drawing)
Inspection of Survey levels and alignment of ROP Quaywall after vibro
65 Survey SDMC-100-IR-12295 01 Marine 18-Feb-24 FOR APPROVAL
compaction