*[NOTE :-As this Instruction has been completely revised, individual paragraphs lzave not been • starred 'J
1. General.-This Instruction refers to those be in continuous operation. The equipments
buildings where a duplicate master clock (Clock should be used alternately and changed over by
No. 36) and the associated Clock-units GMT 34 or 35 operation of the Key No. 2898. Before the
are installed (full duplication) and to those buildings standby Clock No. 36 is brought into service the
where a single master clock (Clock No. 36) and positions of the 6-second and 30-second count
duplicate Clock-units GMT 34 or 35 are installed wheels should be corrected manually if necessary,
(partial duplication). See MISCELLANEOUS, to ensure that the count wheels on both clocks
Time, B 3301. occupy the same relative positions.