PÁG.
1. OBJECTIVE ...............................................................................................................3
1.1. Introduction .................................................................................................3
1. OBJECTIVE
1.1. Introduction
Venezuela has large reserves of hydrocarbons, in particular, extra heavy crude oil in the
Orinoco Oil Belt, at the south of Guárico, Anzoátegui and Monagas states. One of the
strategic objectives of PDVSA is to develop the production potential of these reserves in
order to transform them into higher value products.
In accordance with the above, it is considered the design and construction of one
Upgrading Complex in order to process 400 MBD (2 Upgraders of 200 MBD each) of
Extra Heavy Crude Oil from the Junín fields and one Upgrading Complex in order to
process 600 MBD (3 Upgraders of 200 MBD each) of Extra Heavy Crude Oil from the
Carabobo fields for conversion into Upgraded Crude Oil of 42° API.
PDVSA Intevep has the responsibility of developing the conceptual design of these
upgrading complexes in order to achieve the major goals of PDVSA.
2. SCOPE OF DOCUMENT
The present document gives an estimate of the effluent and the waste rates generated by
Junín’s RSU unit.
3. REFERENCE DOCUMENTS
• Junín Upgrader Overall Basis and Criteria of Design 04454H45-00-DB-0001
• Junín Relief System Unit Design Basis 04454H45-25-DB-0001
4. EFFLUENT SUMMARY
5. WASTE SUMMARY
There is no waste generated in the RSU.