DAILY WORK REPORT

NAME: BALAJI RADHAKRISHNAN

DATE: 03.03.2018

S.No Work Description Progress Remarks

Unit#1,2,3 and 4 Lv switchgear monitored and Tariff Meter


1 Done
Reading Recorded

From Unit#3 HP Relay Oil Pump A&B Cable Connection


2 Done
Status,Line Check,Winding Resistance and IR Test Done

From Unit# 1 6.6Kv Panel,Condenser board,Turbine board,Turbine


3 Done
Emergency board and UT to ECMS electrical signals checked

From Unit# 2 6.6Kv Panel,Condenser board,Turbine board,Turbine


4 Done
Emergency board and UT to ECMS electrical signals checked

From Unit# 3 6.6Kv Panel,Condenser board,Turbine board,Turbine


5 Done
Emergency board and UT to ECMS electrical signals checked

From Unit# 3 6.6Kv Panel,Condenser board,Turbine board,Turbine


6 Emergency board and boiler auxilllary transformer to ECMS Done
electrical signal checked

7 From AHP,CHP and WTP to ECMS breaker fault signal checked Done

From Station Transformer#A,B and BSDG to ECMS fault signal Cable Connection is wrong in Marshalling panel side,Its corrected and
8 Done
checked signal check done
nel side,Its corrected and