Retaining wall
Tasks:
a) find the factor of safety of the single 5m height wall
or the wall made from two 2.5 m steps, as in figure B)
b) find the correct length of the anchors to have factor of safety of 1.6
For calculations assume that the sand is the Hostun sand. Some references are given.
Note that the construction is in stages – first the initial part of the wall is build from bricks with
the reinforcement section, then the sand is filled, than the first rebar anchors (5) are placed,
which are immediately fixed by sand (7a). Then fill 7b follows, with new bricks etc.
Principal drawing of LIMI wall block, anchor and lock tube placing
23.10.2016
NOT IN SCALE