1. FINANCIALS SUMMARY
2. DESCRIPTION PAY OF BILL:
Builders:
Impermeabilizadora Gran Caracas CA:The scope change and include Shiping
waterproofed and repair drainage rain processes, warehouse and packing. Request 70%
deposit.
Tasman: The scope change and include supply and installation of false ceiling and shiping
Antiblaze in process, requesting the 50% deposit.
Uniclima: The scope change and include supply air conditioner only to the area of process,
request 90% deposit.
SIMACA : The scope change and include installation of air conditioning only to the
processing area, requesting the 50% deposit.
3. PROJECT DESCRIPTION
Currently, all the roof on the Manufacturing and DC/Shipping /Transport Areas
waterprofing is so deterioted at the Guatire Site, causing many water infiltration on the
rainy days/ rainy season,submiting the workers, materials and installations to a high risks
of accidents and losses. including electrical risks. The several deficiencies or inexistent air
conditioning, ventilation and exhausting systems for powders and vapors are exposing ours
workers for health risks and Avon are exposed for legal penalties to not comply with the
local Legislation/regulations.
4. QUOTATIONS/TENDERS CONSIDERED
All the values are estimated, based on evaluation executed by a specialized Consultancy
contracted for the previous evaluation of alternatives and quantities (OTEPI).
5. CIR APPROVALS
# Name Title Approved Date
1 Approver Heidy Cox Engineering Manager Approved 01/06/2012
Signed by Heidy Cox Venezuela