Tangguh Expansion Project – LNG EPC
Method Statement of Maintenance
Table of Contents
1 Preliminary.......................................................................................................................5
2 Scope of Work..................................................................................................................5
3 Reference..........................................................................................................................5
4 Manpower Plan & Equipment........................................................................................5
4.1 Manpower Plan....................................................................................................................5
4.2 Equipment & Tools..............................................................................................................5
5 Step of Works...................................................................................................................6
6 House Keeping..................................................................................................................6
7 Safety Precaution.............................................................................................................6
8 Environment.....................................................................................................................7
870310-S-1153824-CST-G01-0008 Page 2 of 9
Tangguh Expansion Project – LNG EPC
Method Statement of Maintenance
Revision History
Amendment Date Revision Amender Amendment
Number Name
OMS references
OMS section ref OMS section title Relevant section of this
document
Related documents
Document Document name Description of Content
number
Stakeholders
Name Date Reviewed
870310-S-1153824-CST-G01-0008 Page 3 of 9
Tangguh Expansion Project – LNG EPC
Method Statement of Maintenance
No CONTRACTOR Comments Name & Title SUBCONTRACTOR Response Name and CONTRACTOR Section
Title resolution Affected
870310-S-1153824-CST-G01-0008 Page 4 of 9
Tangguh Expansion Project – LNG EPC
Method Statement of Maintenance
1 Preliminary
This document was made as to describe the general procedure of repair .This document is
used as a guideline for welding equipment work in Batching plant and other location Purpose
2 Scope of Work
This document should be used for repair equipment work in Tangguh Expansion Project.
-. Preparation area,equipment and tools
3 Reference
Golden Rule of Safety.
Unggul sejati Indonesia Project HSE Plan.
Related SOP Equipments
Related CSTS Procedure
Equipments and tools must be validated by HSE and have double-checked for readiness.
870310-S-1153824-CST-G01-0008 Page 5 of 9
Tangguh Expansion Project – LNG EPC
Method Statement of Maintenance
5 Step of Works
Held tools box meeting will all personnel involve. Ensure all personnel well
understand of their scope of work
Prepare the work area, all tool to be used and check the overall.
Ensure that the working tools and materials in decent condition and has approved
from CSTS
Clean the tool to be fixed
remove the damaged or repaired equipment so that it is easy to work
replace the repaired tool or replace it with a new spare part
after finishing the repair, try the tool up to run normally
after all running normally and back like all, the machine can be re-operated.
Oil Replacement and Precaution service
1. Parking vehicle on safe area.
2. Note the distance between the one vehicle with another approximately 2 meters.
3. Install chock wheel on the vehicle.
4. Handbrake has been on braking position.
5. Wait for a few minute it the vehicle is still hot.
6. Mechanic must wear PPE.
7. Open the cap and makesure it secure properly.
8. Remove the battery cover and install LOTO.
9. The ignition Key is off and held by PH.
10. Install the tarpaulin to avoid spills or leaks.
11. Install the warning tag in the vehicle.
12. Prepare the necessary equipment and place it in an easily accessible place.
13. Prepare the drip pan in accordance with the capacity of the oil to be removed.
14. Use hand gloves when unlocking the oil.
15. Open the oil cover slowly.
16. After oil is removed, store oil in temporary storage.
17. Perform oil fill carefully so there is no spillage.
18. Close it again and make sure it has been locked properly.
19. Use the mask when opening and cleaning the air filter.
20. Make sure the wind direction does not lead to mechanic and other mechanic.
21. At the time of opening of oil filters and solar filters do slowly so that there is no spill
on body mechine or other components.
22. Use gloves on battery water check.
23. Use clear glasses.
870310-S-1153824-CST-G01-0008 Page 6 of 9
Tangguh Expansion Project – LNG EPC
Method Statement of Maintenance
870310-S-1153824-CST-G01-0008 Page 7 of 9
Tangguh Expansion Project – LNG EPC
Method Statement of Maintenance
6 House Keeping
Cleanliness in the workplace strongly supports the work activities, in this case we will do
below steps :
Provide bins in the work area its proper.
Disposing of garbage accordance with the type of waste.
Clean up work before and after completed works
7 Safety Precaution
Before starting, insure the permit has been approved by Area Authority / Area Leader
Workers have to understand the duties and responsibilities that have been socialized
by supervisor before starting the works.
Implements tool box meeting before starting, for completed hazard assessment that
have been approved by supervisor
Workers should be equipped by PPE
Barricade tape and laying sign boards around the work area
Fulfill drinking water needed
Activated emergency system by contacting :
CSTS HSE RADIO COMMUNICATION AT CHANNEL 1
Furthermore, all activities will be organized and should follow the level 2 risk
assessments (L2RA) has been agreed and approved
Stop work if there is something that can result in hazard to coworkers, working
equipment and material around us works. Furthermore, all work activities will be
regulated and must follow L2RA agreed and approved.
Get the training to become a first aider because his role is very important in the early
days of an emergency / emergency on a victim who has suffered a heart attack and
stroke
Not allowed to directly lift / move the victim in a way that is not appropriate because it
could deteriorate victims
Not allowed to drink the victim in the condition unconscious.
- Fall Potential
870310-S-1153824-CST-G01-0008 Page 8 of 9
Tangguh Expansion Project – LNG EPC
Method Statement of Maintenance
8 Environment
Cleanliness and protection of the environment / ecosystem to be part of our work activities, in
this case must be follow below things:
Provide bins in the work area according the purpose
Disposing of waste according to the type of rubbish
Cleanup work before and after the work is completed
Concern for vegetation and ecosystems is emphasized by workers to avoid damage
or vegetation in the work area to relocating vines that block access or work area.
If there are harmful insects and wild animals such as snakes, then the first action is to
get away to the place of safe / isolate (if entry into an enclosed space) and report to
the safety / security will continue to proceed to the enviro division from Contractor to
get more action more.
For plants affected by impact due to the expansion of the lay down area will be
recorded and submitted to the enviro team of Contractor for approval.
Equipment operating in this work are confirmed to have carried out daily inspections
to ensure no spillage of oil /fuel can pollute the environment
Do not feed / hunt / disturbing the animals that pass or be around the current location
of the work process
870310-S-1153824-CST-G01-0008 Page 9 of 9