Reference Output: Ecl+Rdc Joint Venture
Reference Output: Ecl+Rdc Joint Venture
55 of 124
Project Kelani Right Bank WTP-Stage 2
ECL+RDC JOINT VENTURE Scheme Treatment Plant
Component Clear water reservoir Date 12/2/2018
Reference Output
6.70 Design of Flat Slab
Panel Dimensioning
56 of 124
Project Kelani Right Bank WTP-Stage 2
ECL+RDC JOINT VENTURE Scheme Treatment Plant
Component Clear water reservoir Date 12/2/2018
Reference Output
Loading Considered
Panel area = 16.30 m2
Imposed load intensity = 1.50 kN/m2
Thickness of Sand Layer = 0.30 m
Weigh of Sand layer = 6.60 kN/m2
2
Calculated imposed load = 8.10 kN/m
Thickness of Screed in Roof slab = 75.00 mm
Weight of Screed = 1.80 kN/m2
Self weight of the Structure = 6 kN/m2
Calculated dead load = 7.80 kN/m2
2
Design load = 23.88 kN/m
Load F = 389.274 kN
Load F SLS = 259.19 kN
Coloumn/Middle Strip Calculation
Width of coloumn Strip in Short direction = 2.0125 m
Width of middle Strip in Short direction = 2.0375 m
Width of coloumn Strip in long direction = 2.0125 m
Width of Middle Strip in long direction = 2.0125 m
57 of 124
Project Kelani Right Bank WTP-Stage 2
ECL+RDC JOINT VENTURE Scheme Treatment Plant
Component Clear water reservoir Date 12/2/2018
Reference Output
l1 in x direction = 3.35417 m
l1 in ydirection = 3.37917 m
Maximum Support cofficient = 0.063
Maximum Span coefficient = 0.083
ULS MOMENTS
Support Moment Shortway = 82.2584 kNm
M1 Coloumn strip = 61.6938 kNm
M2 Middle Strip = 20.5646 kNm
Span moment short way = 108.372 kNm
M3 Coloumn strip = 59.6047 kNm
M4 Middle Strip = 26.8221 kNm
Support Moment long way = 82.8715 kNm
M5 Coloumn strip = 62.1537 kNm
M6 Middle Strip = 20.7179 kNm
Span moment long way = 109.18 kNm
M7 Coloumn strip = 60.049 kNm
M8 Middle Strip = 49.131 kNm
M1 M2 M3 M4 M5 M6
M 61.69 20.56 59.60 26.82 62.15 20.72
b 2013 2038 2013 2038 2013 2013
Cover 50 50 50 50 50 50
Eff. R/f 10 10 10 10 10 10
Sec. R/f 10 10 10 10 0 0
t 250 250 250 250 250 250
d 185.00 185.00 185.00 185.00 195.00 195.00
f cu 35.00 35.00 35.00 35.00 35.00 35.00
fy 460.00 460.00 460.00 460.00 460.00 460.00
2
M/bd f cu 0.03 0.01 0.02 0.01 0.02 0.01
k 0.03 0.01 0.02 0.01 0.02 0.01
k' 0.156 0.156 0.156 0.156 0.156 0.156
z 179.58 183.25 179.77 182.71 189.84 193.31
0.95d 175.75 175.75 175.75 175.75 185.25 185.25
Zcorrect 175.75 175.75 175.75 175.75 185.25 185.25
x 12.04 3.89 11.62 5.08 11.48 3.76
As(req) 877.14 292.38 847.44 381.35 838.36 279.45
58 of 124
Project Kelani Right Bank WTP-Stage 2
ECL+RDC JOINT VENTURE Scheme Treatment Plant
Component Clear water reservoir Date 12/2/2018
Reference Output
Slab thickness = 250mm
M7 M8
M 60.05 49.13
b 2013 2013
Cover 50 50
Eff. R/f 10 10
Sec. R/f 0 0
t 250 250
d 195.00 195.00
f cu 35.00 35.00
fy 460.00 460.00
2
M/bd f cu 0.02 0.02
k 0.02 0.02
k' 0.156 0.156
z 190.01 190.94
0.95d 185.25 185.25
Zcorrect 185.25 185.25
x 11.08 9.02
As(req) 809.97 662.70
SLS MOMENTS
Support Moment Shortway = 54.7701 kN/m
M1 Coloumn strip = 41.0775 kN/m
M2 Middle Strip = 13.6925 kN/m
Span moment short way = 72.1574 kN/m
M3 Coloumn strip = 39.6866 kN/m
M4 Middle Strip = 32.4708 kN/m
Support Moment long way = 55.1783 kN/m
M5 Coloumn strip = 41.3837 kN/m
M6 Middle Strip = 10.3459 kN/m
Span moment long way = 72.6952 kN/m
M7 Coloumn strip = 39.9824 kN/m
M8 Middle Strip = 32.7128 kN/m
59 of 124
Project Kelani Right Bank WTP-Stage 2
ECL+RDC JOINT VENTURE Scheme Treatment Plant
Component Clear water reservoir Date 12/2/2018
Reference Output
Slab thickness = 250 mm
M1 M2 M3 M4 M5 M6
Main R/f 10 10 10 10 10 10
Sec. R/f 10 10 10 10 0 0
Main cc 150 150 150 150 150 150
Sec cc 150 150 150 150 0 0
Cover 50 50 50 50 50 50
M 41 14 40 32 41 10
M/unitleng 20 7 20 16 21 5
e 15 15 15 15 15 15
t 250 250 250 250 250 250
b 2013 2038 2013 2038 2013 2013
d 185 185 185 185 195 195
As 524 524 524 524 524 524
0.0028 0.0028 0.0028 0.0028 0.0027 0.0027
(x/d) 0.2495 0.2495 0.2495 0.2495 0.2439 0.2439
x 46 46 46 46 48 48
z 170 170 170 170 179 179
fs 230 76 222 179 219 55
ε1 0.0016 0.0005 0.00159 0.0013 0.0015 0.0004
ε2 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
εm 0.00072 -0.0004 0.00066 0.00036 0.00060 -0.0005
acr 94.25 94.25 94.25 94.25 88.01 88.01
cmin 60.00 60.00 60.00 60.00 50.00 50.00
w 0.152 -0.082 0.140 0.075 0.116 -0.095
M7 M8
Main R/f 10 10
Sec. R/f 0 0
Main cc 150 150
Sec cc 0 0
Cover 50 50
M 40 33
M/unit 20 16
e 15 15
t 250 250
b 2013 2013
d 195 195
As 524 524
0.0027 0.0027
(x/d) 0.2439 0.2439
x 48 48
z 179 179
fs 212 173
ε1 0.0014 0.0012
ε2 0.0009 0.0009
εm 0.00056 0.00030
acr 88.01 88.01
cmin 50.00 50.00
w 0.107 0.057
60 of 124
Project Kelani Right Bank WTP-Stage 2
ECL+RDC JOINT VENTURE Scheme Treatment Plant
Component Clear water reservoir Date 12/2/2018
Reference Output
6.7.3 Shrinkage and thermal movement in immature concrete
crit = 0.0035
Thickness 250
Thermal Zone 125
As 438
Smax = ( f ct / f b )*( / 2 )
( f ct / f b ) = 0.67
W max /00.67*( / 2* )
= 0.000352 *
Main R/f 10
Sec. R/f 0
Main cc 150
Sec cc 0
Cover 50
V 389
t 250
1st perime 1600
d 195
As 524
v 1.4348
1sttcheck ok
davg 188
v at 1.5d 0.4765
vc 0.5526
OK
61 of 124