You are on page 1of 5

Job No.

CB130/22 Item WAREHOUSE 1 Revison 00


Date 01/2023
Project AEON SHV BONDED Designed by TDH
Description CHECK DECKING Checked by NPT

I. INPUT
1.Loads:
Concrete slab load Fc = 3.13 kN/m2
Decking self-weight qd = 0.07 kN/m
Collatteral load qal = 0.70 kN/m
Construction load FLC = 2.4 kN/m²
Live load FL = 3.5 kN/m²
Slab thickness hs = 150 mm
Joist beam spacing B= 2000 mm
Construction method Don’t Use Support Column

2. Material
Decking B=1000-hr=50 mm
Thickness t= 0.75 mm
Geomertry properties Ix = 4.66E+05 mm4
Sx = 1.82E+04 mm3
Yielding strength Fy = 235 MPa
Elastic modulus Es = 200000 MPa
Concrete strength B25
Compression strength f' c = 20 MPa
Elastic modulus Ec = 21020 MPa

II. CHECKING THE DECKING WHEN CONSTRUCTION ANSI C-2017


1. Flexural Capacity :
Calculated Length 𝑙 =𝐵= 2 m (Don’t Use Support Column)

𝑙
Maximum Moment 𝑀 =𝑞 = 2.22 kNm (Multi-span)
10

q c = (F c + F LC )b + q d = 5.60 kN/m
𝑀
*Checking capacity = 1.22E+05 kN/m²
𝑆
𝑀
𝑆
𝐹
= 0.905 ≤ 1.00 OK
Ω
Ws = 1.75
2. Shear Capacity : AISI S100-2007
Maximum Shear
Vc = 6.92 kN
Nominal Shear Strength
𝑉 =𝐴 𝐹 = 32.11 kN
𝑘 = 5.35
 
𝑘 𝐸 /𝐹 = 67.48
ℎ /𝑡 = 74.27
ℎ = 55.70 mm
𝐹 = 0.13 kN/mm²
𝜇= 0.30
𝐴 = 250.65 mm2
Job No. CB130/22 Item WAREHOUSE 1 Revison 00
Date 01/2023
Project AEON SHV BONDED Designed by TDH
Description CHECK DECKING Checked by NPT

*Checking capacity
𝑉
=
𝑉 0.38 ≤ 1.00 OK
Ω
Wv = 1.75
3. Deflection :
*Checking deflection
𝑙
f= 9.36 mm ≤ min , 19𝑚𝑚 = 11.11 mm OK
180

III. DECK AND CONCRETE AS A COMPOSITE SLAB ANSI C-2017


1. Classification :
𝑐 𝐴 𝐹
= = 0.119
𝑑 0.85𝑓′ 𝑑𝑏𝛽
2
As = 913 mm
d= 125 mm
b= 1000 mm
β1 = 0.85

𝑐 0.003 ℎ − 𝑑
= =
𝑑 𝐹 0.575
𝐸 + 0.003 𝑑

dd = 50 mm
h= 150 mm
𝑐 𝑐
*Conclusion : 𝑑 < 𝑑 UNDER-REINFORCED

2.Flexural Capacity :
Flexural Capacity at support
𝑀 0.45 ≤ 1.00 OK
=
𝑀
Maximum moment Ω
𝑞𝑙 (Multi-span)
𝑀 = = 2.69 kNm
11
q = (F c + F L )b + q d + q al = 7.40 kN/m
l= 2.000 m
Flexural Capacity
𝑀 𝑀 ,
Ω= Ω= 6.04 kNm
Ω= 1.75

Flexural Capacity of steel bar


M n,b = F y .A s .(h s -30) = 10.58 kNm
A s = A c .0.15% = 2
375 mm
A c = B.d = 250000 mm2

Flexural Capacity at middle span


𝑀 0.19 ≤ 1.00 OK
=
𝑀
Ω
𝑀 14.01 kNm
Ω=
Maximum Moment at middle span
𝑞𝑙
𝑀 = = 2.69 kNm (Multi-span)
11
Job No. CB130/22 Item WAREHOUSE 1 Revison 00
Date 01/2023
Project AEON SHV BONDED Designed by TDH
Description CHECK DECKING Checked by NPT

q = (F c + F L )b + q d + q al = 7.40 kN/m
l= 2.000 m
UNDER-REINFORCED
Nominal Flexural Strength
𝑀 = 𝐴 𝐹 (𝑑 − 𝑎/2) = 25.46 kNm
𝐴 𝐹
𝑎= = 12.62 mm
0.85𝑓′ 𝑏

𝑁 = 𝐹 /𝑄 = 1.19

𝐴
𝐹 =𝐹 𝐴 − 2−𝐴 = 110 kN
2
A web = 251 mm
2
A bf = 320 mm
 
𝑄 = 0.5𝐴 𝑓′ 𝐸 = 91.9 kN
2
A sa = 284 mm
 Mnu ; Ns  Nsu

Mno   Mnu - Mno  Ns / Nsu  ; Ns  Nsu
M  24.51 kNm
n
Ns = 1
𝐹𝐼
𝑀 = (ℎ − 𝑦 ) = 20 kNm

 
𝑦 =𝑑 2𝜌𝑛 + 𝜌𝑛 − 𝜌𝑛 = 38.71 mm

𝐴
𝜌= = 0.007
𝑑𝑏
𝐸
𝑛= = 9.51
𝐸
𝑏
𝐼 = 𝑦 +𝐴 𝑦 +𝐼 = 9.29E+06 mm4
3𝑛
𝑦 =𝑑−𝑦 = 86.29 mm
𝐼 =𝐼 = 4.66E+05 mm4
*Flexural Capacity
𝑀
Ω= 14.01 kNm

W= 1.75
OVER-REINFORCED
Nominal Flexural Strength

𝑀 = 𝑓′ 𝑏𝛽 𝑐 𝑑 − 𝛽 𝑐/2 = 87.29 kNm

  𝜌𝑚 𝜌𝑚
𝑐=𝑑 𝜌𝑚 + − = 49.36 mm
2 2

𝐴
𝜌= = 0.007
𝑑𝑏
𝐸𝜀
𝑚= = 35.29
𝑓′ 𝛽
𝜀 =
0.003
𝑀 𝑀 𝑀
= min ; = 11.22 kNm
Ω Ω Ω
Wc = 2.30
Job No. CB130/22 Item WAREHOUSE 1 Revison 00
Date 01/2023
Project AEON SHV BONDED Designed by TDH
Description CHECK DECKING Checked by NPT

Ws = 1.75
𝐹𝐼
𝑀 = (ℎ − 𝑦 ) = 20 kNm

 
𝑦 =𝑑 2𝜌𝑛 + 𝜌𝑛 − 𝜌𝑛 = 38.71 mm

𝐴
𝜌= = 0.007
𝑑𝑏
𝐸
𝑛= = 9.51
𝐸
𝑏
𝐼 = 𝑦 +𝐴 𝑦 +𝐼 = 9.29E+06 mm4
3𝑛
𝑦 =𝑑−𝑦 = 86.29 mm
𝐼 =𝐼 = 4.66E+05 mm4
*Flexural Capacity

𝑀 = 11.22 kNm

3. One-way Shear Capacity :


Maximum Shear
𝑞𝑙
𝑉 = = 7.40 kN
2
Shear Strength
 
𝑉 𝑉 𝑉 0.332 𝑓′ 𝐴
Ω = min Ω + Ω ; Ω
= 54 kN

Wv = 2.00
Ws = 1.75
𝑉 =𝑉 = 32.11 kN
 
𝑉 = 0.166𝜆 𝑓′ 𝐴 = 71.68 kN
𝜆= 1.0
Concrete area available to resist shear
𝐴 = 96551 mm2
a= 24.5 mm
b= 73.64 mm
c= 71.00 mm
g= 0 mm

*Checking Capacity
𝑉
= 0.14 ≤ 1.00 OK
𝑉
Ω
Job No. CB130/22 Item WAREHOUSE 1 Revison 00
Date 01/2023
Project AEON SHV BONDED Designed by TDH
Description CHECK DECKING Checked by NPT

4. Deflection :
Deflection by Live Load
5𝐹 𝑏𝑙
𝛿 , = = 0.22 mm
384𝐸 𝐼

𝐼 +𝐼
𝐼 = = 1.70E+07 mm4
2

𝑏ℎ 𝑏ℎ
𝐼 = + 𝑦 − 0.5ℎ +𝐼 +𝐴 𝑦
12𝑛 𝑛
𝑊 𝑏𝑑 𝑑 2.46E+07 mm4
+ + ℎ − 𝑦 − 0.5𝑑 =
𝑛𝐶 12

0.5𝑏ℎ + 𝑛𝐴 𝑑 + 𝑊 𝑑 ℎ − 0.5𝑑 𝑏
𝐶
𝑦 = = 68.84 mm
𝑏ℎ + 𝑛𝐴 + 𝑊 𝑑 𝑏 𝐶
ℎ = 100 mm
𝑊 = 166 mm
𝐶 = 334 mm
𝑦 =𝑑−𝑦 = 56.16 mm
Deflection by Dead Load + Live Load
5𝑞𝑙
𝛿 , = = 0.45 mm
384𝐸 𝐼
*Checking Deflection
𝑙
𝛿 , ≤ = 5.56 mm OK
360
𝑙
𝛿 , ≤ = 8.33 mm OK
240