You are on page 1of 1

20 19 18 17 16 15 14 13 12 11 10 9

SHOP MATERIAL LIST FOR 1 ASSEMBLY


MARK SIZE GRADE LENGTH NO SURFACE WEIGHT
mm AREA (M2) KG
F3 PLT8*150 S275 200 2 0.13 3.77
F4 PLT8*150 S275 200 1 0.07 1.88
FL1 PL10*200 S355 5625 1 2.37 88.31
T

FL3 PL10*200 S355 5625 1 2.37 88.31

8
P39 PL6*90 S355 250 4 0.16 4.24
P40 PL6*147 S355 250 4 0.23 6.92
P96 PL25*300 S355 800 1 0.54 47.10
B B P111 PL20*225 S355 718 1 0.36 25.36
63 100 63

20
P121 PL5*92 S355 92 1 0.01 0.33
WB2 PL6*600 S355 5625 1 6.82 158.96

92
TOTAL 13.05 425.20
20

NUMBER OF ASSEMBLY TOTAL WEIGHT (KG)


4 1700

P121

FL3

WB2 5625
S

7
FL3

2493

200
2695
200
1 - 22 ø - 60
2717

Lg Slotted Hole
F4
5625

150
310 310

75
2730 100 100 2695
R

6
1 - 22 ø - 60 1 - 22 ø - 60 6 - 22 ø - 1 - 22 ø - 60
Lg Slotted Hole Lg Slotted Hole Lg Slotted Hole Lg Slotted Hole
120 80
F3 WB2

37 43

260
300

300
300
200
5670 (PL6*600 x 5625)

100 100 1 - 22 ø - 60

583
Lg Slotted Hole

600

80
100 100

F3
5625

5533

150
300

300
300

75
260
Q

5
F4
100 100
186 2363 583 2493

270 40 40

718 250
5625 8 - 22 ø HOLES
310 310 50

63
2708 100 100 2717 P111

2363
2730

97
60

147
FL1

100

225
2708
P

4
200

50

15
80
P40

63
68 250 250 100 50 15

60
310 310

50 40 250 250 60 8 800 250


FL1

P39 BS 60 6 - 36 ø HOLES 50 92

50
P96

63
P111
P39 BS P121

42
100 100
50

90
300
186

92
50

48

13
275

15
O

3
63
25

25

F3 P39

50
A A B-B
P40 BS 45 710 45
25

P96
100 50 100
P40 BS 100 210 175 226
50
45 355 355 45
FL3
WB2 100 210 175 226 90 P39
P39 P40 P40
50

50
P96
97

97
100 100

100 100
N

2
103 100

103 100
REV BY DATE DETAILS
50

50
P39 P40 P40 CLIENT:- J KUMAR INFRAPROJECTS LTD
FL1 MUMBAI, MAHARASHTRA
90 220 175 226 90 P39
CONTRACTOR:-
A-A SG HEAVY ENGINEERING
MUMBAI, MAHARASHTRA
DRAWING TITLE:-
FABRICATION DETAIL DRAWING FOR
PORTAL FRAME PP7
PROJECT:-
M

1
FLYOVER AT MEENATAI THAKRE CHOWK,
ALMEDIA CHOWK AND SANT NAMDEV CHOWK.
DETAILER:-
PRIME STEEL ENGINEERING
WEB :− www.psengg.co.in
DATE:- 23.04.2018 NAME DATE TITLE:-
DRAWN PS 23.04.2018
PROJECTION:- DESIGNED PS 23.04.2018 FABRICATION DETAIL DRAWING FOR
CHECKED MF 23.04.2018 - C7
APPROVED JJ -
4 COLUMN REQUIRED AS DRAWN MKD C7 REV-:
Tekla structures

INQUIRYNO:-SS-17-017 DRG.NO.: FAB-C7


L K J I H G F E D C B A

You might also like