You are on page 1of 3

UB533X210X138kg/m' SB3 edge beam UB 457x191

D 549.1 mm D
B 213.9 mm B
T 23.6 mm T
t 14.7 mm t
A 19,000 mm² A
Iy 92,492 cm4 Iy
Iz 3,868 cm4 Iz
Zy = 3,139 cm3 Zy =
L= 11,300 mm L=
beff = 1,412.50 mm if mid span change to L/4 beff =
fck 14.0 MPa fck
fcd 9.33 MPa fcd
fy 345 MPa fy
hc 90 mm hc
hp 60 mm hp

Compression resistance of concrete slab


Nc,f = hc beff (0.85fcd)
Nc,f = 1008.525 kN

Tensile resistance of steel section


Npl,a = Aa fyd
Npl,a = 6555 kN

PNA in steel beam web

PNA in concrete slab

PNA in steel beam flange

PNA in steel beam web

z= 99.43064182 mm

Mpl.Rd = 1415.60152 kNm Med = 1285 kNm ok


UB533X210X138kg/m' SB3 edge beam UB 457x191
Deflection check
Uniform distributed load
Construction stage Construction stage
Concrete&decking 3.75 kPa P= 0 Concrete&decking 3.75 kPa
Self weight of steel 0.17 kPa Self weight of steel 0.24 kPa
Total DL = 3.92 kPa Total Loading = 5.49 kPa
Tributary 3.6 m Tributary 2.55 m
5𝑊𝐿 15.79 mm LL= 1.5 kPa
𝛿= 15.66 mm
384𝐸𝐼 5𝑊𝐿
𝛿=
𝑃𝐿 384𝐸𝐼
𝛿= - mm
48𝐸𝐼
Composite stage
Additional DL = 2 kPa P= 24.98 kN
IL = 5 kPa
W= 43.55 kN/m'

Assume normal wt cons


as = 6
ac = 18

rl = 0.72
ae = 15.60


𝐵 𝐷 −𝐷 𝐴𝐵 𝐷 − 𝐷 𝐷+𝐷 + 𝐷
𝐼 =𝐼 + +
12 ∝ 4𝐴 ∝ +𝐵 𝐷 − 𝐷

Ig = 1,751,990,486.00 mm4

𝛿= +

d= 25.74 mm + 2.09 mm

Total deflection 43.62 L/360= 31.38889 prechambering requir


Supporting masonry

Prechamber 25 mm
UB533X210X138kg/m' SB3 edge beam UB 457x191
Shear stud

PRd = 83.4 kN for Ø19-100mm height


Min (Ncf, Npla) = 1008.525 kN
No of stup/half span = 13 Nos 434.62
17.27518 327.06

Longitudinal shear
Rq = 1084.2 q= 26.5

𝑉 = 1.0660767 N/mm² 1.149


109.97094

Crushing of concrte compression strut

𝑓
𝑣𝑓 < 0.6(1 − )𝑓
250
= 5.2864

𝑣𝑓 𝑠𝑖𝑛𝜃 cos𝜃 = 2.1109534 N/mm²

Ved = 1.07 N/mm² < 2.111 N/mm² crushing resistance adequate